U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Burnsville, West Virginia (WV) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Burnsville, WV, West Virginia, West Virginia forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 21
Total length: 200 meters (656ft)
Total costs: $8,755,000
Total average daily traffic: 87,770
Total average daily truck traffic: 16,557
National Bridge Inventory (NBI) Registered Bridges for Burnsville

New bridges - Historical Statistics

  • 1900-1909: 1
  • 1910-1919: 0
  • 1920-1929: 0
  • 1930-1939: 0
  • 1940-1949: 0
  • 1950-1959: 0
  • 1960-1969: 0
  • 1970-1979: 19
  • 1980-1989: 1

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 4A016,  Location: 0.09 MI E OF CO 5/10 (Lat: 38.860000,  Lng: -80.663333),  Route carried "on" structure: State highway 500,  Year Built: 1973,  Status: Open,  Structure Length: 6.61m (21.69ft),  Average Daily Traffic: 3,000 (year 2006),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,920 (year 2026),  Design Load: HS 20,  Features Intersected: LITTLE KANAWHA RIVER,  Facility Carried by Structure: WV 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.162,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 24.7m (81.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.61m (21.69ft),  Designated Inspection Frequency: Every 48 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2007,  Underwater Inspection Date: June 2006,  Bridge Improvement Cost: $224,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $291,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 4A017,  Location: 0.02 MI E I-79 (Lat: 38.858333,  Lng: -80.660000),  Route carried "on" structure: County highway 511,  Year Built: 1973,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 800 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,312 (year 2026),  Design Load: HS 20,  Features Intersected: SALTLICK CREEK,  Facility Carried by Structure: COUNTY ROUTE5/11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.257,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 19.3m (63.3ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 47.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 31.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.82m (15.81ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $240,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $311,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 4A018,  Location: 0.04 MI W CO 5/10 (Lat: 38.856667,  Lng: -80.656667),  Route carried "on" structure: County highway 511,  Year Built: 1972,  Status: Open,  Structure Length: 4.91m (16.11ft),  Average Daily Traffic: 800 (year 2006),  Truck Traffic: 4%,  Average Future Daily Traffic: 888 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: LITTLE KANAWHA RIVER,  Facility Carried by Structure: COUNTY ROUTE 5/11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.579,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.6m (61.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 48 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2007,  Underwater Inspection Date: June 2005,  Bridge Improvement Cost: $28,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $51,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 4A125,  Location: 11.86 MI N US 19 (Lat: 38.858333,  Lng: -80.660000),  Route carried "on" structure: Interstate 7900,  Year Built: 1973,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 11,650 (year 2006),  Truck Traffic: 20%,  Average Future Daily Traffic: 22,601 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: COUNTY ROUTE 5/11,  Facility Carried by Structure: I-79 N
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 126.886,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.69m (15.39ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2007,  Other Special Inspection Date: October 2007,  Bridge Improvement Cost: $322,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $538,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>

Structure Number: 4A127,  Location: 0.22 MI N CO 5/11 (Lat: 38.860000,  Lng: -80.656667),  Route carried "on" structure: Interstate 7900,  Year Built: 1973,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 11,250 (year 2006),  Truck Traffic: 20%,  Average Future Daily Traffic: 21,825 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: MAIN STREET A&O RAILROAD,  Facility Carried by Structure: I-79
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 127.240,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 51.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.98m (22.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $658,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $959,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>

Structure Number: 4A128,  Location: 0.20 MI N OF CO 5/11 (Lat: 38.861667,  Lng: -80.656667),  Route carried "on" structure: Interstate 7900,  Year Built: 1973,  Status: Open,  Structure Length: 6.31m (20.70ft),  Average Daily Traffic: 11,250 (year 2006),  Truck Traffic: 20%,  Average Future Daily Traffic: 21,825 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: MAIN STREET A&O RAILROAD,  Facility Carried by Structure: I-79
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 127.240,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.34m (20.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $443,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $689,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>

Structure Number: 4A129,  Location: 0.33 MI N OF CO 5/11 SLS (Lat: 38.861667,  Lng: -80.655000),  Route carried "on" structure: Interstate 7900,  Year Built: 1973,  Status: Open,  Structure Length: 23.32m (76.51ft),  Average Daily Traffic: 11,250 (year 2006),  Truck Traffic: 20%,  Average Future Daily Traffic: 21,825 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: CO 5/10 & LITTLE KANAWHA,  Facility Carried by Structure: INTERSTATE 79
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 127.304,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 13,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 55.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 23.32m (76.51ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2007,  Underwater Inspection Date: May 2007,  Bridge Improvement Cost: $1,660,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $2,211,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>

Structure Number: 4A13,  Location: 0.33 MI N OF CO 5/11 SLS (Lat: 38.861667,  Lng: -80.655000),  Route carried "on" structure: Interstate 7900,  Year Built: 1973,  Status: Open,  Structure Length: 24.29m (79.69ft),  Average Daily Traffic: 11,250 (year 2006),  Truck Traffic: 20%,  Average Future Daily Traffic: 21,825 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: CO 5/10 & LITTLE KANAWHA,  Facility Carried by Structure: INTERSTATE 79
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 127.304,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 14,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 24.29m (79.69ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2007,  Underwater Inspection Date: May 2007,  Bridge Improvement Cost: $1,495,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $2,005,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>

Structure Number: 4A131,  Location: 0.58 MI N OF CO 5/11 (Lat: 38.865000,  Lng: -80.650000),  Route carried "on" structure: Interstate 7900,  Year Built: 1973,  Status: Open,  Structure Length: 11.67m (38.29ft),  Average Daily Traffic: 11,250 (year 2006),  Truck Traffic: 20%,  Average Future Daily Traffic: 21,825 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: CO1,OIL CREEK,CSX RR,  Facility Carried by Structure: I-79 NBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 128.012,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 3,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 51.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.67m (38.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $448,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 4A132,  Location: 0.58 MI N CO 5/11 SLS (Lat: 38.863333,  Lng: -80.650000),  Route carried "on" structure: Interstate 7900,  Year Built: 1973,  Status: Open,  Structure Length: 11.64m (38.19ft),  Average Daily Traffic: 11,250 (year 2006),  Truck Traffic: 20%,  Average Future Daily Traffic: 21,825 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: OIL CK,CSX RR, CO 1 SLS,  Facility Carried by Structure: I-79
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 128.012,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 3,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 50.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.64m (38.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $349,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $447,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 4A133,  Location: 0.02 MI S OF CO 1 (Lat: 38.863333,  Lng: -80.648333),  Route carried "on" structure: County highway 107,  Year Built: 1973,  Status: Posted for load,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 50 (year 2006),  Average Future Daily Traffic: 61 (year 2026),  Design Load: H 10,  Features Intersected: OIL CREEK,  Facility Carried by Structure: CO 1/7 SLS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 34.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $256,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $495,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber
Find on map >>

Structure Number: 4A173,  Location: 0.80 MI S OF CO 5/11 (Lat: 38.851667,  Lng: -80.653333),  Route carried "on" structure: County highway 3504,  Year Built: 1970,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 20 (year 2006),  Average Future Daily Traffic: 24 (year 2026),  Features Intersected: BROWNS RUN,  Facility Carried by Structure: COUNTY ROUTE 35/4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 71.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $160,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $310,000 ( Estimate for 2007)
Find on map >>

Structure Number: 4A903,  Location: 0.02 MI N OF CO 5/11 (Lat: 38.856667,  Lng: -80.658333),  Route carried "on" structure: City street N0215,  Year Built: 1988,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 150 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 183 (year 2026),  Design Load: HS 25,  Features Intersected: SALTLICK CREEK,  Facility Carried by Structure: CHURCH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 72.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Deck Structure Type: Other,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 4A125,  Location: 11.86 MI N US 19 (Lat: 38.858333,  Lng: -80.660000),  Route carried "under" structure: County highway 511,  Year Built: 1973,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 800 (year 2006),  Truck Traffic: 10%,  Features Intersected: I-79,  Facility Carried by Structure: I-79 N
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.6m (152.9ft)

Find on map >>

Structure Number: 4A127,  Location: 0.22 MI N CO 5/11 (Lat: 38.860000,  Lng: -80.656667),  Route carried "under" structure: City street ,  Year Built: 1973,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 50 (year 2006),  Features Intersected: I-79,  Facility Carried by Structure: I-79
Minimum Vertical Clearance: 7.16m (23.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 69.5m (228.0ft)

Find on map >>

Structure Number: 4A128,  Location: 0.20 MI N OF CO 5/11 (Lat: 38.861667,  Lng: -80.656667),  Route carried "under" structure: City street ,  Year Built: 1973,  Structure Length: 6.31m (20.70ft),  Average Daily Traffic: 50 (year 2006),  Features Intersected: I-79,  Facility Carried by Structure: I-79
Minimum Vertical Clearance: 7.16m (23.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 63.1m (207.0ft)

Find on map >>

Structure Number: 4A129,  Location: 0.33 MI N OF CO 5/11 SLS (Lat: 38.861667,  Lng: -80.655000),  Route carried "under" structure: County highway 510,  Year Built: 1973,  Structure Length: 23.32m (76.51ft),  Average Daily Traffic: 800 (year 2003),  Truck Traffic: 10%,  Features Intersected: INTERSTATE RT I-79 X,  Facility Carried by Structure: INTERSTATE 79
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 233.2m (765.1ft)

Find on map >>

Structure Number: 4A13,  Location: 0.33 MI N OF CO 5/11 SLS (Lat: 38.861667,  Lng: -80.655000),  Route carried "under" structure: County highway 510,  Year Built: 1973,  Structure Length: 24.29m (79.69ft),  Average Daily Traffic: 800 (year 2003),  Truck Traffic: 10%,  Features Intersected: INTERSTATE RT I-79 X,  Facility Carried by Structure: INTERSTATE 79
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 1.078,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 242.9m (796.9ft)

Find on map >>

Structure Number: 4A131,  Location: 0.58 MI N OF CO 5/11 (Lat: 38.865000,  Lng: -80.650000),  Route carried "under" structure: County highway 100,  Year Built: 1973,  Structure Length: 11.67m (38.29ft),  Average Daily Traffic: 600 (year 2006),  Truck Traffic: 10%,  Features Intersected: I-79,  Facility Carried by Structure: I-79 NBL
Minimum Vertical Clearance: 12.92m (42.39ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 116.7m (382.9ft)

Find on map >>

Structure Number: 4A132,  Location: 0.58 MI N CO 5/11 SLS (Lat: 38.863333,  Lng: -80.650000),  Route carried "under" structure: County highway 100,  Year Built: 1973,  Structure Length: 11.64m (38.19ft),  Average Daily Traffic: 600 (year 2006),  Truck Traffic: 10%,  Features Intersected: I-79,  Facility Carried by Structure: I-79
Minimum Vertical Clearance: 12.62m (41.40ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 116.4m (381.9ft)

Find on map >>

Structure Number: 4A154,  Location: 0.08 MI S OF WV 4 (Lat: 38.676667,  Lng: -80.771667),  Route carried "under" structure: County highway 427,  Year Built: 1905,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 100 (year 2006),  Features Intersected: RAILROAD,  Facility Carried by Structure: RAILROAD
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 1.802,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 21.9m (71.9ft)

Discuss this city on our hugely popular West Virginia forum

Back to: Burnsville, WV, West Virginia, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.