U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Byron, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Byron, NY, New York, New York forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 14
Total length: 19 meters (62ft)
Total costs: $5,249,000
Total average daily traffic: 14,364
Total average daily truck traffic: 1,021
National Bridge Inventory (NBI) Registered Bridges for Byron

New bridges - Historical Statistics

  • 1900-1909: 1
  • 1910-1919: 0
  • 1920-1929: 0
  • 1930-1939: 2
  • 1940-1949: 1
  • 1950-1959: 4
  • 1960-1969: 2
  • 1970-1979: 1
  • 1980-1989: 1
  • 1990-1999: 2

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 104236,  Location: 0.5 MI N JCT RT 237+262 (Lat: 43.088294,  Lng: -78.065456),  Route carried "on" structure: State highway 237,  Year Built: 1994,  Status: Open,  Structure Length: 1.06m (3.48ft),  Average Daily Traffic: 1,885 (year 2006),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,669 (year 2026),  Design Load: HS 25,  Features Intersected: BLACK CK OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.706,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.1m (16.7ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 76.2 metric tons,  Inventory Rating: 40.8 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $238,000,  Roadway Improvement Cost: $142,000,  Total Project Cost: $380,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 104237,  Location: 0.7 MI N JCT RTS 237 &262 (Lat: 43.089558,  Lng: -78.065522),  Route carried "on" structure: State highway 237,  Year Built: 1986,  Status: Open,  Structure Length: 2.49m (8.17ft),  Average Daily Traffic: 1,885 (year 2006),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,669 (year 2026),  Design Load: HS 20,  Features Intersected: BLACK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.698,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.7m (77.8ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Very good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.49m (8.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $563,000,  Roadway Improvement Cost: $335,000,  Total Project Cost: $898,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 104238,  Location: 1.0 MI N JCT RTS 237+262 (Lat: 43.093742,  Lng: -78.066514),  Route carried "on" structure: State highway 237,  Year Built: 1994,  Status: Open,  Structure Length: 2.22m (7.28ft),  Average Daily Traffic: 1,885 (year 2006),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,669 (year 2026),  Design Load: HS 25,  Features Intersected: SPRING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.955,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.22m (7.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $501,000,  Roadway Improvement Cost: $298,000,  Total Project Cost: $799,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 104374,  Location: JCT RTE262+BLACK CK BYRON (Lat: 43.079872,  Lng: -78.068603),  Route carried "on" structure: State highway 262,  Year Built: 1949,  Status: Open,  Structure Length: 2.28m (7.48ft),  Average Daily Traffic: 2,543 (year 2005),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,601 (year 2025),  Design Load: H 20,  Features Intersected: BLACK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.366,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.9m (35.8ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.28m (7.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $162,000,  Roadway Improvement Cost: $96,000,  Total Project Cost: $258,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 331518,  Location: 1.3 MILES NW OF BYRON (Lat: 43.090656,  Lng: -78.084161),  Route carried "on" structure: City street ,  Year Built: 1954,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 134 (year 2001),  Truck Traffic: 5%,  Average Future Daily Traffic: 185 (year 2021),  Features Intersected: SPRING CREEK,  Facility Carried by Structure: TOWER HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.7m (18.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $121,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $193,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 331519,  Location: 1.0 MI NE BYRON (Lat: 43.092172,  Lng: -78.055658),  Route carried "on" structure: City street ,  Year Built: 1966,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 137 (year 2001),  Truck Traffic: 5%,  Average Future Daily Traffic: 190 (year 2021),  Design Load: HS 20,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: COLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.8m (15.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $206,000,  Roadway Improvement Cost: $123,000,  Total Project Cost: $329,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 33152,  Location: 1 MI EAST OF WEEDSPORT (Lat: 43.091636,  Lng: -78.073839),  Route carried "on" structure: County highway ,  Year Built: 1939,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 1.18m (3.87ft),  Average Daily Traffic: 1,240 (year 2001),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,716 (year 2021),  Features Intersected: SPRING CREEK,  Facility Carried by Structure: COUNTY ROAD 19A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $206,000,  Roadway Improvement Cost: $123,000,  Total Project Cost: $329,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 331521,  Location: 1.6 MI NE PUMPKIN HILL (Lat: 43.108933,  Lng: -78.038844),  Route carried "on" structure: County highway ,  Year Built: 1939,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 620 (year 2003),  Truck Traffic: 5%,  Average Future Daily Traffic: 858 (year 2023),  Design Load: H 20,  Features Intersected: TRIB BLACK CREEK,  Facility Carried by Structure: WARBOYS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $206,000,  Roadway Improvement Cost: $123,000,  Total Project Cost: $329,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 331523,  Location: 1.2 MI NW OF BYRON (Lat: 43.094147,  Lng: -78.076558),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 138 (year 2001),  Truck Traffic: 5%,  Average Future Daily Traffic: 191 (year 2021),  Features Intersected: SPRING CREEK,  Facility Carried by Structure: SEARLES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.6m (11.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 74.9 metric tons,  Inventory Rating: 29.3 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $199,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 331524,  Location: 1.5 MI WEST OF S.BYRON (Lat: 43.048883,  Lng: -78.094956),  Route carried "on" structure: County highway ,  Year Built: 1959,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 556 (year 2001),  Truck Traffic: 5%,  Average Future Daily Traffic: 770 (year 2021),  Features Intersected: BIGELOW CREEK,  Facility Carried by Structure: WALKERS CORNRS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 75.6 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $168,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $268,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 331525,  Location: 0.2 MI W S.BYRON (Lat: 43.048194,  Lng: -78.069386),  Route carried "on" structure: County highway ,  Year Built: 1959,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 591 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 818 (year 2026),  Design Load: H 20,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: WALKERS CORNER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.7m (22.0ft)

Condition: Channel: Poor,  Culverts: Fair,  Operating Rating: 74.5 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $420,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $670,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 331528,  Location: 1.0 MI NW SOUTH BYRON (Lat: 43.062072,  Lng: -78.073339),  Route carried "on" structure: City street ,  Year Built: 1977,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 165 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 228 (year 2026),  Design Load: H 15,  Features Intersected: BIGELOW CREEK,  Facility Carried by Structure: CASWELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $168,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $268,000 ( Estimate for 2007),  Deck Structure Type: Open Grating
Find on map >>

Structure Number: 331529,  Location: 1 MILE SOUTH OF BYRON (Lat: 43.066247,  Lng: -78.064839),  Route carried "on" structure: City street ,  Year Built: 1967,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 445 (year 2001),  Truck Traffic: 5%,  Average Future Daily Traffic: 616 (year 2021),  Design Load: H 20,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: COCKRAM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 59.1 metric tons,  Inventory Rating: 24.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $206,000,  Roadway Improvement Cost: $123,000,  Total Project Cost: $329,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 704235,  Location: 1.7 MI N JCT RTS 237+I490 (Lat: 43.047339,  Lng: -78.065719),  Route carried "under" structure: Alternate State highway 237,  Year Built: 1904,  Structure Length: 1.67m (5.48ft),  Average Daily Traffic: 2,140 (year 2007),  Truck Traffic: 8%,  Features Intersected: RTE 237,  Facility Carried by Structure: CSX TRANSPRTATION
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 7.546,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 11.2m (36.7ft)

Discuss this city on our hugely popular New York forum

Back to: Byron, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.