![]() |
Bridge Statistics for Byron, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Byron, NY, New York, New York forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 14 Total length: 19 meters (62ft) Total costs: $5,249,000 Total average daily traffic: 14,364 Total average daily truck traffic: 1,021 National Bridge Inventory (NBI) Registered Bridges for Byron
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Bridge Condition - Culverts Find on map >>
Structure Number: 104236, Location: 0.5 MI N JCT RT 237+262 (Lat: 43.088294, Lng: -78.065456), Route carried "on" structure: State highway 237, Year Built: 1994, Status: Open, Structure Length: 1.06m (3.48ft), Average Daily Traffic: 1,885 (year 2006), Truck Traffic: 8%, Average Future Daily Traffic: 2,669 (year 2026), Design Load: HS 25, Features Intersected: BLACK CK OVERFLOW Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 12.706, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 9.7m (31.8ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 5.1m (16.7ft), Curb-To-Curb Width: 9.7m (31.8ft), Out-to-Out Width: 10.3m (33.8ft) Condition: Channel: Very good, Culverts: Very good, Operating Rating: 76.2 metric tons, Inventory Rating: 40.8 metric tons, Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.06m (3.48ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Bridge Improvement Cost: $238,000, Roadway Improvement Cost: $142,000, Total Project Cost: $380,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 104237, Location: 0.7 MI N JCT RTS 237 &262 (Lat: 43.089558, Lng: -78.065522), Route carried "on" structure: State highway 237, Year Built: 1986, Status: Open, Structure Length: 2.49m (8.17ft), Average Daily Traffic: 1,885 (year 2006), Truck Traffic: 8%, Average Future Daily Traffic: 2,669 (year 2026), Design Load: HS 20, Features Intersected: BLACK CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 12.698, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 9.7m (31.8ft), Skew: 1 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 23.7m (77.8ft), Curb-To-Curb Width: 9.7m (31.8ft), Out-to-Out Width: 10.4m (34.1ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Very good, Channel: Very good, Operating Rating: 73.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.49m (8.17ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $563,000, Roadway Improvement Cost: $335,000, Total Project Cost: $898,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 104238, Location: 1.0 MI N JCT RTS 237+262 (Lat: 43.093742, Lng: -78.066514), Route carried "on" structure: State highway 237, Year Built: 1994, Status: Open, Structure Length: 2.22m (7.28ft), Average Daily Traffic: 1,885 (year 2006), Truck Traffic: 8%, Average Future Daily Traffic: 2,669 (year 2026), Design Load: HS 25, Features Intersected: SPRING CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 13.955, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 9.7m (31.8ft), Skew: 3 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 20.4m (66.9ft), Curb-To-Curb Width: 9.7m (31.8ft), Out-to-Out Width: 10.4m (34.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Very good, Channel: Satisfactory, Operating Rating: 82.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.22m (7.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $501,000, Roadway Improvement Cost: $298,000, Total Project Cost: $799,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 104374, Location: JCT RTE262+BLACK CK BYRON (Lat: 43.079872, Lng: -78.068603), Route carried "on" structure: State highway 262, Year Built: 1949, Status: Open, Structure Length: 2.28m (7.48ft), Average Daily Traffic: 2,543 (year 2005), Truck Traffic: 8%, Average Future Daily Traffic: 3,601 (year 2025), Design Load: H 20, Features Intersected: BLACK CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 17.366, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 10.9m (35.8ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 9.9m (32.5ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Channel: Satisfactory, Operating Rating: 41.7 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 25.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 2.28m (7.48ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $162,000, Roadway Improvement Cost: $96,000, Total Project Cost: $258,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 331518, Location: 1.3 MILES NW OF BYRON (Lat: 43.090656, Lng: -78.084161), Route carried "on" structure: City street , Year Built: 1954, Status: Posted for load, Structure Length: 0.79m (2.59ft), Average Daily Traffic: 134 (year 2001), Truck Traffic: 5%, Average Future Daily Traffic: 185 (year 2021), Features Intersected: SPRING CREEK, Facility Carried by Structure: TOWER HILL ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 5.7m (18.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.3m (24.0ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 7.0m (23.0ft) Condition: Deck: Poor, Superstructure: Serious, Substructure: Poor, Channel: Satisfactory, Operating Rating: 36.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 21.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of corrective action, Deck Geometry: Meets minimum limits, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below), Length Of Structure Improvement: 0.79m (2.59ft), Designated Inspection Frequency: Every 12 months, Inspection Date: May 2007, Bridge Improvement Cost: $121,000, Roadway Improvement Cost: $72,000, Total Project Cost: $193,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 331519, Location: 1.0 MI NE BYRON (Lat: 43.092172, Lng: -78.055658), Route carried "on" structure: City street , Year Built: 1966, Status: Open, Structure Length: 1.31m (4.30ft), Average Daily Traffic: 137 (year 2001), Truck Traffic: 5%, Average Future Daily Traffic: 190 (year 2021), Design Load: HS 20, Features Intersected: BLACK CREEK, Facility Carried by Structure: COLE ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 4.8m (15.7ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.8m (42.0ft), Curb-To-Curb Width: 7.1m (23.3ft), Out-to-Out Width: 7.3m (24.0ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Channel: Good, Operating Rating: 64.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 44.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.31m (4.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $206,000, Roadway Improvement Cost: $123,000, Total Project Cost: $329,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 33152, Location: 1 MI EAST OF WEEDSPORT (Lat: 43.091636, Lng: -78.073839), Route carried "on" structure: County highway , Year Built: 1939, Year Reconstructed: 1986, Status: Open, Structure Length: 1.18m (3.87ft), Average Daily Traffic: 1,240 (year 2001), Truck Traffic: 5%, Average Future Daily Traffic: 1,716 (year 2021), Features Intersected: SPRING CREEK, Facility Carried by Structure: COUNTY ROAD 19A Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.6m (34.8ft), Curb-To-Curb Width: 9.0m (29.5ft), Out-to-Out Width: 9.7m (31.8ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Fair, Operating Rating: 70.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 41.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.18m (3.87ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $206,000, Roadway Improvement Cost: $123,000, Total Project Cost: $329,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 331521, Location: 1.6 MI NE PUMPKIN HILL (Lat: 43.108933, Lng: -78.038844), Route carried "on" structure: County highway , Year Built: 1939, Year Reconstructed: 1987, Status: Open, Structure Length: 0.91m (2.99ft), Average Daily Traffic: 620 (year 2003), Truck Traffic: 5%, Average Future Daily Traffic: 858 (year 2023), Design Load: H 20, Features Intersected: TRIB BLACK CREEK, Facility Carried by Structure: WARBOYS ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.9m (25.9ft), Curb-To-Curb Width: 9.0m (29.5ft), Out-to-Out Width: 9.7m (31.8ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Channel: Poor, Operating Rating: 69.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 41.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.91m (2.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $206,000, Roadway Improvement Cost: $123,000, Total Project Cost: $329,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 331523, Location: 1.2 MI NW OF BYRON (Lat: 43.094147, Lng: -78.076558), Route carried "on" structure: City street , Year Built: 1956, Status: Open, Structure Length: 0.73m (2.40ft), Average Daily Traffic: 138 (year 2001), Truck Traffic: 5%, Average Future Daily Traffic: 191 (year 2021), Features Intersected: SPRING CREEK, Facility Carried by Structure: SEARLES ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.0m (19.7ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.6m (11.8ft) Condition: Channel: Satisfactory, Culverts: Fair, Operating Rating: 74.9 metric tons, Inventory Rating: 29.3 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.73m (2.40ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $125,000, Roadway Improvement Cost: $74,000, Total Project Cost: $199,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 331524, Location: 1.5 MI WEST OF S.BYRON (Lat: 43.048883, Lng: -78.094956), Route carried "on" structure: County highway , Year Built: 1959, Status: Open, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 556 (year 2001), Truck Traffic: 5%, Average Future Daily Traffic: 770 (year 2021), Features Intersected: BIGELOW CREEK, Facility Carried by Structure: WALKERS CORNRS RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.2m (26.9ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 4.2m (13.8ft) Condition: Channel: Satisfactory, Culverts: Fair, Operating Rating: 75.6 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.85m (2.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $168,000, Roadway Improvement Cost: $100,000, Total Project Cost: $268,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 331525, Location: 0.2 MI W S.BYRON (Lat: 43.048194, Lng: -78.069386), Route carried "on" structure: County highway , Year Built: 1959, Status: Open, Structure Length: 2.13m (6.99ft), Average Daily Traffic: 591 (year 2006), Truck Traffic: 5%, Average Future Daily Traffic: 818 (year 2026), Design Load: H 20, Features Intersected: BLACK CREEK, Facility Carried by Structure: WALKERS CORNER RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 7.0m (23.0ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 6.7m (22.0ft) Condition: Channel: Poor, Culverts: Fair, Operating Rating: 74.5 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.13m (6.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $420,000, Roadway Improvement Cost: $250,000, Total Project Cost: $670,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 331528, Location: 1.0 MI NW SOUTH BYRON (Lat: 43.062072, Lng: -78.073339), Route carried "on" structure: City street , Year Built: 1977, Status: Open, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 165 (year 2006), Truck Traffic: 5%, Average Future Daily Traffic: 228 (year 2026), Design Load: H 15, Features Intersected: BIGELOW CREEK, Facility Carried by Structure: CASWELL ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.4m (21.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.3m (24.0ft), Curb-To-Curb Width: 8.6m (28.2ft), Out-to-Out Width: 9.1m (29.9ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 41.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.85m (2.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $168,000, Roadway Improvement Cost: $100,000, Total Project Cost: $268,000 ( Estimate for 2007), Deck Structure Type: Open Grating Find on map >>
Structure Number: 331529, Location: 1 MILE SOUTH OF BYRON (Lat: 43.066247, Lng: -78.064839), Route carried "on" structure: City street , Year Built: 1967, Status: Open, Structure Length: 1.31m (4.30ft), Average Daily Traffic: 445 (year 2001), Truck Traffic: 5%, Average Future Daily Traffic: 616 (year 2021), Design Load: H 20, Features Intersected: BLACK CREEK, Facility Carried by Structure: COCKRAM ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.0m (19.7ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.8m (42.0ft), Curb-To-Curb Width: 7.1m (23.3ft), Out-to-Out Width: 7.3m (24.0ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 59.1 metric tons, Inventory Rating: 24.6 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.31m (4.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $206,000, Roadway Improvement Cost: $123,000, Total Project Cost: $329,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 704235, Location: 1.7 MI N JCT RTS 237+I490 (Lat: 43.047339, Lng: -78.065719), Route carried "under" structure: Alternate State highway 237, Year Built: 1904, Structure Length: 1.67m (5.48ft), Average Daily Traffic: 2,140 (year 2007), Truck Traffic: 8%, Features Intersected: RTE 237, Facility Carried by Structure: CSX TRANSPRTATION Minimum Vertical Clearance: 4.34m (14.24ft), Kilometerpoint: 7.546, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 11.2m (36.7ft) Discuss this city on our hugely popular New York forum Back to: Byron, NY, New York, All US cities.
|
![]() |