U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Calera, Alabama (AL) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Calera, AL, Alabama, Alabama forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 16
Total length: 53 meters (174ft)
Total costs: $8,985,000
Total average daily traffic: 183,663
Total average daily truck traffic: 31,262
National Bridge Inventory (NBI) Registered Bridges for Calera

New bridges - Historical Statistics

  • 1920-1929: 4
  • 1930-1939: 0
  • 1940-1949: 0
  • 1950-1959: 4
  • 1960-1969: 3
  • 1970-1979: 0
  • 1980-1989: 1
  • 1990-1999: 3
  • 2000-2009: 1

Reconstructed bridges - Historical Statistics

  • 1930-1939: 2
  • 1940-1949: 0
  • 1950-1959: 0
  • 1960-1969: 0
  • 1970-1979: 0
  • 1980-1989: 0
  • 1990-1999: 2

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 286,  Location: @ CALERA PARK (Lat: 33.099167,  Lng: -86.761667),  Route carried "on" structure: State highway 25,  Year Built: 1925,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 8,970 (year 2007),  Truck Traffic: 15%,  Average Future Daily Traffic: 9,283 (year 2027),  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 189.597,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 14.5 metric tons,  Inventory Rating: 10.9 metric tons,  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $194,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $291,000 ( Estimate for 2008),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 516,  Location: .4 MI. SO. I-65 (Lat: 33.127500,  Lng: -86.748889),  Route carried "on" structure: State highway 25,  Year Built: 1928,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 7,940 (year 2007),  Truck Traffic: 14%,  Average Future Daily Traffic: 8,257 (year 2027),  Features Intersected: TOWN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 191.763,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 14.5 metric tons,  Inventory Rating: 10.9 metric tons,  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $342,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $513,000 ( Estimate for 2008),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 2512,  Location: 1 MI N CHILTON CO LN (Lat: 33.089444,  Lng: -86.742778),  Route carried "on" structure: US 31,  Year Built: 1920,  Year Reconstructed: 1941,  Status: Open,  Structure Length: 0.90m (2.95ft),  Average Daily Traffic: 6,290 (year 2007),  Truck Traffic: 9%,  Average Future Daily Traffic: 6,415 (year 2027),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 388.779,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.0m (29.5ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $249,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $374,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 2513,  Location: .3 MI.SO.JCT AL 25 (Lat: 33.083333,  Lng: -86.750278),  Route carried "on" structure: US 31,  Year Built: 1920,  Year Reconstructed: 1941,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 8,320 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 8,536 (year 2027),  Design Load: H 15,  Features Intersected: BUXAHATCHEE CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 390.272,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $346,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $519,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 4548,  Location: 1.6 MI.SO. I-65(CALERA EX (Lat: 33.128333,  Lng: -86.750000),  Route carried "on" structure: US 31,  Year Built: 1953,  Status: Open,  Structure Length: 6.77m (22.21ft),  Average Daily Traffic: 12,920 (year 2007),  Truck Traffic: 15%,  Average Future Daily Traffic: 13,398 (year 2027),  Design Load: HS 20,  Features Intersected: L & N RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 393.277,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 43.5 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.79m (25.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,024,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,536,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 6485,  Location: 0 . 8 MI N JCT US 31 (Lat: 33.139444,  Lng: -86.768889),  Route carried "on" structure: Interstate 65,  Year Built: 1959,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 24,195 (year 2007),  Truck Traffic: 20%,  Average Future Daily Traffic: 25,090 (year 2027),  Design Load: HS 20,  Features Intersected: L & N RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 373.040,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.50m (24.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $917,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $1,376,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 6487,  Location: SHELBY CO AIRPORT (Lat: 33.174444,  Lng: -86.780278),  Route carried "on" structure: Business County highway ,  Year Built: 1959,  Status: Open,  Structure Length: 7.53m (24.70ft),  Average Daily Traffic: 1,530 (year 2002),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,025 (year 2024),  Design Load: HS 25,  Features Intersected: I 65,  Facility Carried by Structure: CO RD 87
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 40.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.54m (28.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $912,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $1,368,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 6988,  Location: AL 25 & I 65 (Lat: 33.119444,  Lng: -86.736667),  Route carried "on" structure: State highway 25,  Year Built: 1960,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 7,940 (year 2007),  Truck Traffic: 14%,  Average Future Daily Traffic: 8,257 (year 2027),  Design Load: HS 20,  Features Intersected: I65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 192.317,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.51m (27.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $1,047,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $1,571,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 9135,  Location: 0 . 4 MI E JCT US 31 (Lat: 33.150000,  Lng: -86.733333),  Route carried "on" structure: State highway 70,  Year Built: 1966,  Status: Open,  Structure Length: 1.94m (6.36ft),  Average Daily Traffic: 8,590 (year 2007),  Truck Traffic: 11%,  Average Future Daily Traffic: 9,234 (year 2027),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.723,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 22.7 metric tons,  Inventory Rating: 17.1 metric tons,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.66m (8.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $259,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $389,000 ( Estimate for 2008),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 17876,  Location: .3 MI W. JCT. AL. 25 (Lat: 33.083333,  Lng: -86.750000),  Route carried "on" structure: County highway 20,  Year Built: 2000,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 768 (year 2008),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,396 (year 2028),  Design Load: HS 20,  Features Intersected: N. FORK BUXAHATCHEE CR.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 36.0 metric tons,  Inventory Rating: 36.0 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $209,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $314,000 ( Estimate for 2008),  Deck Structure Type: Concrete Precast Panels
Find on map >>

Structure Number: 18805,  Location: 18TH STREET @ 22ND AVE (Lat: 33.083333,  Lng: -86.750000),  Route carried "on" structure: City street 22,  Year Built: 1991,  Status: Closed,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 150 (year 2005),  Truck Traffic: 1%,  Average Future Daily Traffic: 210 (year 2025),  Features Intersected: BUXAHATCHEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.6m (18.4ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2005,  Other Special Inspection Date: March 2006,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $225,000 ( Estimate for 2008),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 19527,  Location: 6TH AVE. NEAR WHIPPORWILL (Lat: 33.100000,  Lng: -86.733333),  Route carried "on" structure: City street 6,  Year Built: 1980,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 100 (year 2007),  Average Future Daily Traffic: 140 (year 2027),  Design Load: HS 20,  Features Intersected: UT TO BUXAHATCHEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.2m (3.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $86,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $129,000 ( Estimate for 2008)
Find on map >>

Structure Number: 19864,  Location: NEAR RR DEPOT. (Lat: 33.083333,  Lng: -86.750000),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 100 (year 2001),  Average Future Daily Traffic: 140 (year 2027),  Design Load: HS 20,  Features Intersected: BUXAHATCHEE CREEK,  Facility Carried by Structure: 9TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $114,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $171,000 ( Estimate for 2008)
Find on map >>

Structure Number: 19865,  Location: AT 16TH STREET CHURCH. (Lat: 33.083333,  Lng: -86.750000),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 500 (year 2007),  Average Future Daily Traffic: 700 (year 2027),  Design Load: HS 20,  Features Intersected: BUXAHATCHEE CREEK,  Facility Carried by Structure: 16TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $139,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $209,000 ( Estimate for 2008)
Find on map >>

Structure Number: 6487,  Location: I65 & CO RD 87 (Lat: 33.174444,  Lng: -86.780278),  Route carried "under" structure: Interstate 65,  Year Built: 1959,  Structure Length: 7.53m (24.70ft),  Average Daily Traffic: 56,800 (year 2007),  Truck Traffic: 18%,  Features Intersected: I-65,  Facility Carried by Structure: CO RD 87
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 376.426,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>

Structure Number: 6988,  Location: AL 25 & I 65 (Lat: 33.119444,  Lng: -86.736667),  Route carried "under" structure: Interstate 65,  Year Built: 1960,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 38,550 (year 2007),  Truck Traffic: 22%,  Features Intersected: I-65,  Facility Carried by Structure: AL 25
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 367.252,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 20.7m (67.9ft)

Discuss this city on our hugely popular Alabama forum

Back to: Calera, AL, Alabama, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.