Bridge Statistics for Cameron, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 20Number of bridges
  • 118ft / 36.1mTotal length
  • $11,696,000Total costs
  • 40,450Total average daily traffic
  • 10,407Total average daily truck traffic
  • 64,304Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Cameron
  • No street view available for this location

New bridges in Cameron, OK - historical statistics
  • New bridges - historical statistics
  • 71930-1939
  • 11940-1949
  • 11950-1959
  • 11960-1969
  • 91990-1999
  • 12000-2009
Reconstructed bridges in Cameron, OK - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 11970-1979
  • 11980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Cameron, OK
Average Bridge Truck Traffic in Cameron, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.3%Very good
  • 58.3%Good
  • 25.0%Satisfactory
  • 8.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 50.0%Very good
  • 16.7%Good
  • 33.3%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.7%Very good
  • 50.0%Good
  • 8.3%Satisfactory
  • 16.7%Fair
  • 8.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 26.3%Very good
  • 21.1%Good
  • 26.3%Satisfactory
  • 26.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Good
  • 50.0%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 5344,  Location: 2.1N 1W OF CAMERON (Lat: 35.163783,  Lng: -94.553225),  Route carried "on" structure: County highway 4017C,  Year Built: 1937,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 320 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.908,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.63m (11.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $185,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $294,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 602,  Location: 1.2E OF HOWE (Lat: 34.949550,  Lng: -94.613964),  Route carried "on" structure: County highway E1425,  Year Built: 1938,  Status: Posted for load,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: H 10,  Features Intersected: MORRIS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 21.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 12.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.17m (10.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $81,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6041,  Location: 2.4 MI N US 69A (Lat: 36.977278,  Lng: -94.830814),  Route carried "on" structure: US 69,  Year Built: 1938,  Year Reconstructed: 1960,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,400 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 3,840 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.734,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 6305,  Location: 2.5 MI W GRADY C/L (Lat: 35.072414,  Lng: -98.132533),  Route carried "on" structure: US 62,  Year Built: 1938,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 2,750 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 4,400 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.588,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 47.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 6308,  Location: 1 W JEFFERSON C/L (Lat: 34.159167,  Lng: -98.159444),  Route carried "on" structure: US 70,  Year Built: 1938,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,200 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,920 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.306,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 47.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 6309,  Location: CADDO-GRADY C/L (Lat: 35.083128,  Lng: -98.093111),  Route carried "on" structure: US 62,  Year Built: 1938,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 6,300 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 10,080 (year 2040),  Design Load: H 20,  Features Intersected: MERIDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.336,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 20.6m (67.6ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 48.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 631,  Location: 18.5 NW JCT US 69 (Lat: 35.174000,  Lng: -95.696878),  Route carried "on" structure: State highway 113,  Year Built: 1938,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 900 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,440 (year 2040),  Design Load: H 15,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.394,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.34m (10.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $660,000,  Total Project Cost: $1,120,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 758,  Location: 1.6 S 0.5 W CAMERON (Lat: 35.112261,  Lng: -94.540256),  Route carried "on" structure: County highway 4031,  Year Built: 1940,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 550 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 880 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: 4068C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.505,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.79m (9.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 14331,  Location: 12.7 MI N OKLA. C/L (Lat: 35.903144,  Lng: -97.393769),  Route carried "on" structure: Interstate 35,  Year Built: 1959,  Status: Open,  Structure Length: 1.42m (4.66ft),  Average Daily Traffic: 18,300 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 29,280 (year 2040),  Design Load: HS 20,  Features Intersected: PIN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.337,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $462,000,  Roadway Improvement Cost: $763,000,  Total Project Cost: $1,295,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 22613,  Location: 2.1 MI W OF MT. PARK (Lat: 34.695847,  Lng: -98.983694),  Route carried "on" structure: County highway 3804,  Year Built: 1990,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: WEST OTTER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.42m (21.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $328,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $524,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 22615,  Location: 6N&2.5E OF JCT SH7&SH65 (Lat: 34.681167,  Lng: -98.167914),  Route carried "on" structure: County highway 1625,  Year Built: 1990,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 90 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 144 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: FAS 1624C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.414,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.30m (20.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $322,000,  Roadway Improvement Cost: $177,000,  Total Project Cost: $514,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 22617,  Location: 2. S .3 W OF US 60 (Lat: 36.698994,  Lng: -95.940669),  Route carried "on" structure: County highway E0220,  Year Built: 1990,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 360 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: RICE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Inventory Rating: 65.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.30m (20.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $322,000,  Roadway Improvement Cost: $177,000,  Total Project Cost: $514,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 22618,  Location: 0.8 MI SE JCT U.S. 60 (Lat: 36.135969,  Lng: -98.915650),  Route carried "on" structure: US 270,  Year Built: 1990,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 4,500 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 7,200 (year 2040),  Design Load: HL 93,  Features Intersected: CHEYENNE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.239,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.23m (20.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $533,000,  Roadway Improvement Cost: $879,000,  Total Project Cost: $1,492,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2309,  Location: 2S 1.2E OF ISABELLA (Lat: 36.202800,  Lng: -98.314589),  Route carried "on" structure: County highway E0560,  Year Built: 1991,  Status: Posted for load,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 80 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.9m (19.4ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $134,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23351,  Location: 2.8 S; 0.5 W CAMERON (Lat: 35.094739,  Lng: -94.540322),  Route carried "on" structure: County highway 4031,  Year Built: 1992,  Status: Open,  Structure Length: 0.99m (3.25ft),  Average Daily Traffic: 550 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 880 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: 4068C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.414,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Channel: Very good,  Culverts: Fair,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.72m (8.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 23352,  Location: 3.6 S; 0.5 W CAMERON (Lat: 35.084114,  Lng: -94.540347),  Route carried "on" structure: County highway 4031,  Year Built: 1992,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 550 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 880 (year 2040),  Design Load: HS 20,  Features Intersected: GAP CREEK,  Facility Carried by Structure: 4068C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.23m (20.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $318,000,  Roadway Improvement Cost: $175,000,  Total Project Cost: $508,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 24558,  Location: 1.7 S; 0.5 W CAMERON (Lat: 35.109511,  Lng: -94.540278),  Route carried "on" structure: County highway 4031,  Year Built: 1994,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 550 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 880 (year 2040),  Design Load: HS 20,  Features Intersected: RIDDLE CREEK,  Facility Carried by Structure: 4068C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.183,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Inventory Rating: 42.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.23m (20.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $318,000,  Roadway Improvement Cost: $175,000,  Total Project Cost: $508,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 25069,  Location: 1.5 MI S OF US 75 (Lat: 36.880461,  Lng: -95.917047),  Route carried "on" structure: County highway N3980,  Year Built: 1995,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: BRUSH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 87.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.43m (17.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $277,000,  Roadway Improvement Cost: $152,000,  Total Project Cost: $442,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 27041,  Location: 3.6 S; 1.6 E CAMERON (Lat: 35.083750,  Lng: -94.505111),  Route carried "on" structure: County highway 4024C,  Year Built: 2004,  Status: Open,  Structure Length: 4.04m (13.25ft),  Average Daily Traffic: 300 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 480 (year 2040),  Design Load: HS 20,  Features Intersected: GAP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.44m (14.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $490,000,  Roadway Improvement Cost: $245,000,  Total Project Cost: $784,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 31917,  Location: .5N OF CAMERON (Lat: 35.146994,  Lng: -94.522644),  Route carried "on" structure: County highway N4800,  Year Built: 1968,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 600 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 960 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.9m (9.5ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Total Project Cost: $225,000
Discuss Cameron, Oklahoma (OK) on our hugely popular Oklahoma forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.