U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Campton, New Hampshire (NH) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Campton, NH, New Hampshire, New Hampshire forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 37
Total length: 119 meters (390ft)
Total costs: $55,500,000
Total average daily traffic: 138,550
Total average daily truck traffic: 12,801
Total future (year 2026) average daily traffic: 205,055
National Bridge Inventory (NBI) Registered Bridges for Campton

New bridges - Historical Statistics

  • Before 1900: 2
  • 1900-1909: 1
  • 1910-1919: 0
  • 1920-1929: 5
  • 1930-1939: 5
  • 1940-1949: 1
  • 1950-1959: 1
  • 1960-1969: 15
  • 1970-1979: 4
  • 1980-1989: 1
  • 1990-1999: 0
  • 2000-2009: 2

Reconstructed bridges - Historical Statistics

  • 1960-1969: 3
  • 1970-1979: 0
  • 1980-1989: 2
  • 1990-1999: 14

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 35004700107,  Location: 0.01 MI RUMNEY TL (Lat: 43.829817,  Lng: -71.734875),  Route carried "on" structure: Other road ,  Year Built: 1978,  Status: Open,  Structure Length: 0.36m (1.18ft),  Average Daily Traffic: 300 (year 1984),  Truck Traffic: 4%,  Average Future Daily Traffic: 444 (year 2027),  Features Intersected: AVERY BROOK,  Facility Carried by Structure: BOG ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 3.6m (11.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 12.7 metric tons,  Inventory Rating: 10.0 metric tons,  Structural Evaluation: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.36m (1.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008)
Find on map >>

Structure Number: 35008000078,  Location: 2.6 MI FROM PLYMOUTH TL (Lat: 43.811111,  Lng: -71.703369),  Route carried "on" structure: Other road ,  Year Built: 1960,  Status: Open,  Structure Length: 0.43m (1.41ft),  Average Daily Traffic: 200 (year 1984),  Truck Traffic: 4%,  Average Future Daily Traffic: 296 (year 2027),  Features Intersected: BOG BROOK,  Facility Carried by Structure: BEECH HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.026,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Fair,  Culverts: Serious,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.43m (1.41ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008)
Find on map >>

Structure Number: 35008200147,  Location: 1.4 MI ELLSWORTH TL (Lat: 43.861403,  Lng: -71.702181),  Route carried "on" structure: State highway ,  Year Built: 1933,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 1,000 (year 2005),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,480 (year 2026),  Design Load: H 15,  Features Intersected: GREAT BROOK,  Facility Carried by Structure: ELLSWORTH HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.301,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.61m (2.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35010200061,  Location: 1.3 MI S JCT BLAIR ROAD (Lat: 43.798331,  Lng: -71.678014),  Route carried "on" structure: Other road ,  Year Built: 1950,  Year Reconstructed: 1968,  Status: Open,  Structure Length: 0.49m (1.61ft),  Features Intersected: BOG BROOK,  Facility Carried by Structure: BEAVERBROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 44.5 metric tons,  Inventory Rating: 26.3 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.49m (1.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008)
Find on map >>

Structure Number: 35010400059,  Location: 1.1 MI FROM PLYMOUTH T.L. (Lat: 43.798306,  Lng: -71.677592),  Route carried "on" structure: Interstate 93,  Year Built: 1968,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 9,000 (year 2005),  Truck Traffic: 9%,  Average Future Daily Traffic: 13,320 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: BOG BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.835,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.63m (15.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35010500058,  Location: 1.1 MI FROM PLYMOUTH TL (Lat: 43.798117,  Lng: -71.676500),  Route carried "on" structure: Interstate 93,  Year Built: 1963,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 9,000 (year 2005),  Truck Traffic: 9%,  Average Future Daily Traffic: 13,320 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: BOG BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.802,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.63m (15.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35010800058,  Location: 1.2 MI FROM PLYMOUTH TL (Lat: 43.798200,  Lng: -71.673675),  Route carried "on" structure: US 3,  Year Built: 1929,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,500 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,220 (year 2026),  Design Load: H 15,  Features Intersected: BOG BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.012,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35011200079,  Location: 2.1 MI FROM PLYMOUTH TL (Lat: 43.811575,  Lng: -71.670758),  Route carried "on" structure: Interstate 93,  Year Built: 1967,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 9,000 (year 2005),  Truck Traffic: 9%,  Average Future Daily Traffic: 13,320 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: BLAIR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.444,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.0m (39.4ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35011200116,  Location: .4 MI FROM OLD DW HWY (Lat: 43.841683,  Lng: -71.670169),  Route carried "on" structure: Other road ,  Year Built: 2002,  Status: Open,  Structure Length: 0.46m (1.51ft),  Average Daily Traffic: 60 (year 1985),  Average Future Daily Traffic: 89 (year 2027),  Features Intersected: CONNOR BROOK,  Facility Carried by Structure: MICLON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Skew: 3 degrees,  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 25.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.46m (1.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008)
Find on map >>

Structure Number: 35011300078,  Location: 2.1 MI FROM PLYMOUTH T.L. (Lat: 43.811325,  Lng: -71.670058),  Route carried "on" structure: Interstate 93,  Year Built: 1963,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 9,000 (year 2005),  Truck Traffic: 9%,  Average Future Daily Traffic: 13,320 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: BLAIR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.380,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 13.9m (45.6ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35011400121,  Location: .1 MI FROM OLD DW HWY (Lat: 43.843097,  Lng: -71.668989),  Route carried "on" structure: Other road ,  Year Built: 2002,  Status: Open,  Structure Length: 0.52m (1.71ft),  Average Daily Traffic: 60 (year 1985),  Average Future Daily Traffic: 89 (year 2027),  Features Intersected: CONNOR BROOK,  Facility Carried by Structure: MICLON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.821,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 3.8m (12.5ft),  Skew: 3 degrees,  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.2m (17.1ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 0.52m (1.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008)
Find on map >>

Structure Number: 35011500126,  Location: 3.6 MI ELLSWORTH TL (Lat: 43.846272,  Lng: -71.667364),  Route carried "on" structure: State highway ,  Year Built: 1934,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,000 (year 2005),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,480 (year 2026),  Design Load: H 10,  Features Intersected: CONNOR BROOK,  Facility Carried by Structure: ELLSWORTH HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.761,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35011700076,  Location: .15 MI E JCT US 3 (Lat: 43.810092,  Lng: -71.665511),  Route carried "on" structure: State highway ,  Year Built: 1869,  Status: Posted for load,  Structure Length: 8.78m (28.81ft),  Average Daily Traffic: 1,000 (year 2002),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,480 (year 2026),  Features Intersected: PEMIGEWASSET RIVER,  Facility Carried by Structure: BLAIR ROAD
Minimum Vertical Clearance: 3.66m (12.01ft),  Kilometerpoint: 0.531,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 43.0m (141.1ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 4.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 2.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 8.78m (28.81ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: June 2008,  Other Special Inspection Date: June 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 35011700126,  Location: 100 FEET SOUTH JCT US 3 (Lat: 43.847075,  Lng: -71.665306),  Route carried "on" structure: State highway ,  Year Built: 1900,  Year Reconstructed: 1973,  Status: Open,  Structure Length: 0.58m (1.90ft),  Average Daily Traffic: 770 (year 2005),  Average Future Daily Traffic: 1,140 (year 2026),  Features Intersected: CONNOR BROOK,  Facility Carried by Structure: DAN WEB ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.58m (1.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35011700135,  Location: 0.6 MI FROM THORNTON TL (Lat: 43.851347,  Lng: -71.666839),  Route carried "on" structure: US 3,  Year Built: 1927,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 1,200 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,776 (year 2026),  Design Load: H 15,  Features Intersected: WEST BRANCH BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.77m (9.09ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Critical Feature Inspection Date: July 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35011700137,  Location: 5.7 MI N PLYMOUTH TL (Lat: 43.852019,  Lng: -71.666750),  Route carried "on" structure: US 3,  Year Built: 1935,  Status: Open,  Structure Length: 0.37m (1.21ft),  Average Daily Traffic: 1,200 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,776 (year 2026),  Design Load: H 15,  Features Intersected: MILL POND BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.37m (1.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35011800126,  Location: 5.3 MI N PLYMOUTH TL (Lat: 43.847078,  Lng: -71.665019),  Route carried "on" structure: US 3,  Year Built: 1934,  Status: Open,  Structure Length: 0.55m (1.80ft),  Average Daily Traffic: 1,200 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,776 (year 2026),  Design Load: H 15,  Features Intersected: CONNOR BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.725,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.55m (1.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35012100087,  Location: 2.6 MI PLYMOUTH T.L. (Lat: 43.817269,  Lng: -71.662600),  Route carried "on" structure: Interstate 93,  Year Built: 1969,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 16.98m (55.71ft),  Average Daily Traffic: 8,000 (year 2004),  Truck Traffic: 10%,  Average Future Daily Traffic: 11,840 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: US 3,PEMIGEWASSET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.329,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.8m (38.7ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 44.8m (147.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.98m (55.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35012100088,  Location: 2.7 MI PLYMOUTH TL (Lat: 43.817908,  Lng: -71.662794),  Route carried "on" structure: Interstate 93,  Year Built: 1969,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 17.65m (57.91ft),  Average Daily Traffic: 8,000 (year 2004),  Truck Traffic: 9%,  Average Future Daily Traffic: 11,840 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: US 3,PEMIGEWASSET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.377,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 46.6m (152.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.65m (57.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35012400129,  Location: 0.2 MI E JCT US 3 (Lat: 43.848042,  Lng: -71.660258),  Route carried "on" structure: State highway 49,  Year Built: 1928,  Status: Open,  Structure Length: 6.61m (21.69ft),  Average Daily Traffic: 1,400 (year 1992),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,072 (year 2026),  Design Load: H 15,  Features Intersected: PEMIGEWASSET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.61m (21.69ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Critical Feature Inspection Date: April 2006,  Other Special Inspection Date: April 2006,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 3501270015,  Location: 0.3 MI THORNTON TL (Lat: 43.863589,  Lng: -71.657719),  Route carried "on" structure: Interstate 93,  Year Built: 1970,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 5.66m (18.57ft),  Average Daily Traffic: 6,000 (year 2004),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,880 (year 2026),  Design Load: HS 25,  Features Intersected: NHRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.042,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 56.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.66m (18.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 35012800148,  Location: 0.4 MI THORNTON TL (Lat: 43.863111,  Lng: -71.657561),  Route carried "on" structure: Interstate 93,  Year Built: 1970,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 5.70m (18.70ft),  Average Daily Traffic: 6,000 (year 2004),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,880 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: NHRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.010,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.70m (18.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 35013300115,  Location: 4.2 MI PLYMOUTH TL (Lat: 43.838806,  Lng: -71.651214),  Route carried "on" structure: Interstate 93,  Year Built: 1968,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 3.19m (10.47ft),  Average Daily Traffic: 8,000 (year 2004),  Truck Traffic: 10%,  Average Future Daily Traffic: 11,840 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: MAD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.904,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.0m (39.4ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.19m (10.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35013300144,  Location: 0.7 MI THORNTON TL (Lat: 43.859164,  Lng: -71.652292),  Route carried "on" structure: Interstate 93,  Year Built: 1968,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 2.39m (7.84ft),  Average Daily Traffic: 6,000 (year 2004),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,880 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: OWL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.399,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.39m (7.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35013300145,  Location: 0.7 MI THORNTON TL (Lat: 43.859528,  Lng: -71.652164),  Route carried "on" structure: Interstate 93,  Year Built: 1968,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 6,000 (year 2004),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,880 (year 2026),  Design Load: HS 25,  Features Intersected: OWL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.415,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 56.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 35013400115,  Location: 4.4 MI PLYMOUTH TL (Lat: 43.838681,  Lng: -71.650728),  Route carried "on" structure: Interstate 93,  Year Built: 1968,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 3.19m (10.47ft),  Average Daily Traffic: 8,000 (year 2004),  Truck Traffic: 10%,  Average Future Daily Traffic: 11,840 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: MAD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.856,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.19m (10.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 35013700122,  Location: 4.6 MI PLYMOUTH TL (Lat: 43.843781,  Lng: -71.646797),  Route carried "on" structure: Interstate 93,  Year Built: 1968,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 2.72m (8.92ft),  Average Daily Traffic: 9,000 (year 2005),  Truck Traffic: 10%,  Average Future Daily Traffic: 13,320 (year 2026),  Design Load: HS 25,  Features Intersected: NHRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.500,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Inventory Rating: 76.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.72m (8.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 35013700123,  Location: 4.7 MI PLYMOUTH TL (Lat: 43.844447,  Lng: -71.646850),  Route carried "on" structure: Interstate 93,  Year Built: 1968,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 2.73m (8.96ft),  Average Daily Traffic: 9,000 (year 2005),  Truck Traffic: 10%,  Average Future Daily Traffic: 13,320 (year 2026),  Design Load: HS 25,  Features Intersected: NHRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.856,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.7m (41.7ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Inventory Rating: 72.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.73m (8.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 35014000133,  Location: 0.7 MI THORNTON TL (Lat: 43.850797,  Lng: -71.645822),  Route carried "on" structure: Interstate 93,  Year Built: 1968,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 2.73m (8.96ft),  Average Daily Traffic: 6,000 (year 2005),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,880 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: NH 49
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.336,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.73m (8.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35014100133,  Location: 1.4MI FROM THORNTON TL (Lat: 43.850739,  Lng: -71.646317),  Route carried "on" structure: Interstate 93,  Year Built: 1968,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 6,000 (year 2004),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,880 (year 2026),  Design Load: HS 25,  Features Intersected: NH 49
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.304,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 56.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 35014400092,  Location: 3.5 MI N JCT RTE 3 (Lat: 43.817669,  Lng: -71.646392),  Route carried "on" structure: State highway 175,  Year Built: 1934,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 980 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,450 (year 2026),  Design Load: H 15,  Features Intersected: BEEBE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.263,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 40.8 metric tons,  Inventory Rating: 29.0 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.53m (8.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35015300092,  Location: 3.1 MI FROM HOLDERNESS T (Lat: 43.817308,  Lng: -71.637700),  Route carried "on" structure: Other road ,  Year Built: 1988,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 300 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 444 (year 2027),  Design Load: HS 25,  Features Intersected: BEEBE RIVER,  Facility Carried by Structure: PERCH POND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.037,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35015300147,  Location: 6.6 MI N JCT US 3 (Lat: 43.861733,  Lng: -71.632278),  Route carried "on" structure: State highway 175,  Year Built: 1927,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 2,000 (year 2005),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,960 (year 2026),  Design Load: H 15,  Features Intersected: MAD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.219,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.0m (3.3ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008)
Find on map >>

Structure Number: 35015400144,  Location: 6.2 MI N JCT US 3 (Lat: 43.856828,  Lng: -71.632931),  Route carried "on" structure: State highway 175,  Year Built: 1974,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 2,000 (year 2005),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,960 (year 2026),  Design Load: H 20,  Features Intersected: WINTER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.624,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35016300082,  Location: 80 FT FR PAGE&PERCH RD (Lat: 43.814436,  Lng: -71.621658),  Route carried "on" structure: Other road ,  Year Built: 1877,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 60 (year 1985),  Average Future Daily Traffic: 89 (year 2026),  Features Intersected: BEEBE RIVER,  Facility Carried by Structure: BUMP'S INTERVALE
Minimum Vertical Clearance: 3.45m (11.32ft),  Kilometerpoint: 0.032,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Wood or Timber,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 3.9m (12.8ft),  Out-to-Out Width: 4.2m (13.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Critical,  Channel: Fair,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 35017000075,  Location: 1.9 MI FR HOLDERNESS TL (Lat: 43.809639,  Lng: -71.614172),  Route carried "on" structure: Other road ,  Year Built: 1940,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 260 (year 2003),  Truck Traffic: 4%,  Average Future Daily Traffic: 385 (year 2027),  Features Intersected: RYAN BROOK,  Facility Carried by Structure: PERCH POND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.026,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 23.6 metric tons,  Inventory Rating: 17.2 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35018500086,  Location: 2.2MI FR NH ROUTE 175 (Lat: 43.817486,  Lng: -71.599092),  Route carried "on" structure: Other road ,  Year Built: 1920,  Status: Posted for load,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 60 (year 1985),  Average Future Daily Traffic: 89 (year 2027),  Features Intersected: BEEBE RIVER,  Facility Carried by Structure: EASTERN CORNER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.557,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 2.2m (7.2ft),  Out-to-Out Width: 3.8m (12.5ft)

Condition: Deck: Poor,  Superstructure: Critical,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: July 2008,  Critical Feature Inspection Date: July 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber

Discuss this city on our hugely popular New Hampshire forum

Back to: Campton, NH, New Hampshire, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.