Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Cassville, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 24Number of bridges
  • 180ft / 54.6mTotal length
  • $6,017,000Total costs
  • 120,545Total average daily traffic
  • 13,920Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Cassville
  • No street view available for this location

New bridges in Cassville, WV - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11920-1929
  • 11950-1959
  • 41960-1969
  • 51970-1979
  • 61980-1989
  • 31990-1999
  • 22000-2009
  • 12010-2019
Average Bridge Daily Traffic in Cassville, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 45.5%Good
  • 18.2%Satisfactory
  • 36.4%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Very good
  • 61.1%Good
  • 11.1%Satisfactory
  • 11.1%Fair
  • 5.6%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Very good
  • 27.8%Good
  • 16.7%Satisfactory
  • 33.3%Fair
  • 11.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 35.3%Very good
  • 17.6%Good
  • 23.5%Satisfactory
  • 23.5%Fair
Find on map >>   Show street view

Structure Number: 31A015,  Location: 0.01 MI WEST US ROUTE 19 (Lat: 39.668600,  Lng: -80.029700),  Route carried "on" structure: State highway 700,  Year Built: 1921,  Status: Posted for load,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 6,200 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,000 (year 2041),  Features Intersected: GUSTON RUN,  Facility Carried by Structure: WV ROUTE 7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.627,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $268,000,  Roadway Improvement Cost: $199,000,  Total Project Cost: $742,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 31A091,  Location: 0.07 MI SOUTH WV RT 7 (Lat: 39.679800,  Lng: -80.108500),  Route carried "on" structure: County highway 3700,  Year Built: 1989,  Status: Open,  Structure Length: 1.54m (5.05ft),  Average Daily Traffic: 500 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 775 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: DOLLS RUN,  Facility Carried by Structure: MONONGALIA CR 37
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.903,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A1,  Location: 0.01 MI NORTH MGL CO 43/9 (Lat: 39.666100,  Lng: -80.063100),  Route carried "on" structure: County highway 4300,  Year Built: 1981,  Status: Open,  Structure Length: 0.84m (2.76ft),  Average Daily Traffic: 800 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,100 (year 0020),  Design Load: HS 20,  Features Intersected: SCOTTS RUN,  Facility Carried by Structure: MONO CO RT 43
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.727,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $298,000,  Roadway Improvement Cost: $237,000,  Total Project Cost: $583,000 ( Estimate for 2022),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 31A103,  Location: 0.25 MI NORTH WV RT 7 (Lat: 39.666200,  Lng: -80.063100),  Route carried "on" structure: County highway 4300,  Year Built: 1988,  Status: Open,  Structure Length: 0.87m (2.85ft),  Average Daily Traffic: 800 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,240 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: BRANCH OF SCOTTS RUN,  Facility Carried by Structure: MONO CO RT 43
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.049,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Superstructure: Good,  Substructure: Poor,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 68.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $238,000,  Roadway Improvement Cost: $193,000,  Total Project Cost: $454,000 ( Estimate for 2022),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A133,  Location: 0.23 MI SOUTH CO RT 54 (Lat: 39.678600,  Lng: -80.023700),  Route carried "on" structure: County highway 5000,  Year Built: 1987,  Status: Open,  Structure Length: 0.84m (2.76ft),  Average Daily Traffic: 800 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,250 (year 2041),  Design Load: HS 20,  Features Intersected: WADES RUN,  Facility Carried by Structure: MONONGALIA CR 50
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.690,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A134,  Location: 0.04 MI SOUTH CO RT 54 (Lat: 39.682131,  Lng: -80.025069),  Route carried "on" structure: County highway 5000,  Year Built: 1989,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 800 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,100 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: WADES RUN,  Facility Carried by Structure: MON CO RT 50
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.996,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 71.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $178,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $328,000 ( Estimate for 2020),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A157,  Location: 0.34 MI SOUTH CO RT 54 (Lat: 39.678600,  Lng: -80.023700),  Route carried "on" structure: County highway 5000,  Year Built: 1989,  Status: Open,  Structure Length: 1.14m (3.74ft),  Average Daily Traffic: 800 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,240 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: WADES RUN,  Facility Carried by Structure: MONONGALIA CR 50
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.513,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $334,000,  Roadway Improvement Cost: $281,000,  Total Project Cost: $344,000 ( Estimate for 2022),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A175,  Location: 1.10 MI NORTH CO RT 19/24 (Lat: 39.666781,  Lng: -80.021611),  Route carried "on" structure: Interstate 7900,  Year Built: 1972,  Status: Open,  Structure Length: 12.77m (41.90ft),  Average Daily Traffic: 17,800 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 25,450 (year 2041),  Design Load: HS 20,  Features Intersected: Scotts Run & US 19 (F),  Facility Carried by Structure: INTERSTATE 79 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 251.009,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 40.5m (132.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.77m (41.90ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $1,121,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $1,349,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 31A176,  Location: 3.40 MI NORTH CO RT 19/24 (Lat: 39.692439,  Lng: -80.042750),  Route carried "on" structure: Interstate 7900,  Year Built: 1967,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 13,850 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 19,805 (year 2041),  Design Load: HS 20,  Features Intersected: US 19,  Facility Carried by Structure: INTERSTATE 79 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 254.711,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 26.1m (85.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 31A221,  Location: 1.10 MI NORTH CO RT 19/24 (Lat: 39.666869,  Lng: -80.021211),  Route carried "on" structure: Interstate 7900,  Year Built: 1972,  Status: Open,  Structure Length: 12.31m (40.39ft),  Average Daily Traffic: 22,050 (year 2018),  Truck Traffic: 18%,  Average Future Daily Traffic: 30,000 (year 2038),  Design Load: HS 20,  Features Intersected: Scotts Run & US 19 (F),  Facility Carried by Structure: INTERSTATE 79 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 251.009,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 36.0m (118.1ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.31m (40.39ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $1,114,000,  Roadway Improvement Cost: $117,000,  Total Project Cost: $1,353,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 31A223,  Location: 3.40 MI NORTH CO RT 19/24 (Lat: 39.692631,  Lng: -80.042561),  Route carried "on" structure: Interstate 7900,  Year Built: 1967,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 13,850 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 19,805 (year 2041),  Design Load: HS 20,  Features Intersected: US 19,  Facility Carried by Structure: INTERSTATE 79 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 254.711,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 26.1m (85.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.82m (19.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $568,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $864,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 31A266,  Location: 0.01 MI NORTH US ROUTE 19 (Lat: 39.674519,  Lng: -80.035150),  Route carried "on" structure: County highway 5002,  Year Built: 1955,  Status: Open,  Structure Length: 0.80m (2.62ft),  Average Daily Traffic: 10 (year 2019),  Average Future Daily Traffic: 14 (year 2041),  Features Intersected: GUSTON RUN,  Facility Carried by Structure: MON CO Rt 50/2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.3m (20.7ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 31A269,  Location: 0.05 MI SOUTH WV RT 7 (Lat: 39.667400,  Lng: -80.050750),  Route carried "on" structure: County highway 752,  Year Built: 1996,  Status: Open,  Structure Length: 1.27m (4.17ft),  Average Daily Traffic: 50 (year 2019),  Average Future Daily Traffic: 70 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: SCOTTS RUN,  Facility Carried by Structure: MONONGALIA CR 7/52
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.7m (15.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A274,  Location: 0.01 MI EAST CO RT 7/53 (Lat: 39.667100,  Lng: -80.035481),  Route carried "on" structure: County highway 718,  Year Built: 1999,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 200 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 310 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: SCOTTS RUN,  Facility Carried by Structure: MON CO RT 7/18
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.221,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A275,  Location: 0.01 MI EAST MON CO 7/27 (Lat: 39.688081,  Lng: -80.110639),  Route carried "on" structure: State highway 700,  Year Built: 1999,  Status: Open,  Structure Length: 1.48m (4.86ft),  Average Daily Traffic: 3,900 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,030 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: DOLLS RUN,  Facility Carried by Structure: WV 7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.341,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A294,  Location: 0.09 MI WEST MGL CO 43 (Lat: 39.622231,  Lng: -80.050189),  Route carried "on" structure: County highway 4304,  Year Built: 1973,  Status: Open,  Structure Length: 0.89m (2.92ft),  Average Daily Traffic: 10 (year 2019),  Average Future Daily Traffic: 15 (year 2041),  Features Intersected: DENTS RUN,  Facility Carried by Structure: MGL CO ROUTE 43
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.929,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.9m (29.2ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 31A298,  Location: 0.01 MI WEST CO RT 37 (Lat: 39.672400,  Lng: -80.117711),  Route carried "on" structure: County highway 3702,  Year Built: 2006,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 50 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 70 (year 2041),  Design Load: HL 93,  Features Intersected: PEDLAR RUN,  Facility Carried by Structure: MGL CO RT 37/2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A31,  Location: 0.06 MI WEST MGL CO 7/27 (Lat: 39.685650,  Lng: -80.109439),  Route carried "on" structure: State highway 700,  Year Built: 2008,  Status: Open,  Structure Length: 2.39m (7.84ft),  Average Daily Traffic: 3,900 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,300 (year 2038),  Design Load: HL 93,  Features Intersected: DOLLS RUN,  Facility Carried by Structure: WV ROUTE 7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.615,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A328,  Location: 0.16 mi E of Mgl Co 43 (Lat: 39.664669,  Lng: -80.060119),  Route carried "on" structure: State highway 7,  Year Built: 2015,  Status: Open,  Structure Length: 2.15m (7.05ft),  Average Daily Traffic: 3,750 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,100 (year 2036),  Design Load: HL 93,  Features Intersected: Scotts Run
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.859,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A027,  Location: 0.16 MI SOUTH WV RT 7 (Lat: 39.664181,  Lng: -80.070481),  Route carried "under" structure: County highway 716,  Year Built: 1914,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2019),  Features Intersected: NORFOLK SOUTHERN RR,  Facility Carried by Structure: NORFOLK SOUTHERN
Minimum Vertical Clearance: 3.61m (11.84ft),  Kilometerpoint: 0.257,  Lanes under structure: 2,  Length of Maximum Span: 6.2m (20.3ft)

Find on map >>   Show street view

Structure Number: 31A175,  Location: 1.10 MI NORTH CO RT 19/24 (Lat: 39.666781,  Lng: -80.021611),  Route carried "under" structure: US 1900,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 10,800 (year 0018),  Truck Traffic: 4%,  Features Intersected: Scotts Run & US 19 (F),  Facility Carried by Structure: INTERSTATE 79 SB
Minimum Vertical Clearance: 6.76m (22.18ft),  Kilometerpoint: 25.894,  Lanes on structure: 2,  Lanes under structure: 2,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: 31A176,  Location: 3.40 MI NORTH CO RT 19/24 (Lat: 39.692439,  Lng: -80.042750),  Route carried "under" structure: US 1900,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 3,600 (year 0018),  Truck Traffic: 4%,  Features Intersected: US 19,  Facility Carried by Structure: INTERSTATE 79 SB
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 29.837,  Lanes on structure: 2,  Lanes under structure: 2,  Length of Maximum Span: 26.1m (85.6ft)

Find on map >>   Show street view

Structure Number: 31A221,  Location: 1.10 MI NORTH CO RT 19/24 (Lat: 39.666869,  Lng: -80.021211),  Route carried "under" structure: US 1900,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 11,575 (year 0016),  Truck Traffic: 4%,  Features Intersected: Scotts Run & US 19 (F),  Facility Carried by Structure: INTERSTATE 79 NB
Minimum Vertical Clearance: 6.50m (21.33ft),  Kilometerpoint: 25.894,  Lanes on structure: 2,  Lanes under structure: 2,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: 31A223,  Location: 3.40 MI NORTH CO RT 19/24 (Lat: 39.692631,  Lng: -80.042561),  Route carried "under" structure: US 1900,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 4,350 (year 0016),  Truck Traffic: 4%,  Features Intersected: US 19,  Facility Carried by Structure: INTERSTATE 79 NB
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 29.837,  Lanes on structure: 2,  Lanes under structure: 2,  Length of Maximum Span: 26.1m (85.6ft)

Discuss Cassville, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.