National Bridge Inventory (NBI) Statistics
Number of bridges: 39
Total length: 176 meters (577ft)
Total costs: $18,327,000
Total average daily traffic: 322,458
Total average daily truck traffic: 71,189
National Bridge Inventory (NBI) Registered Bridges for Cedar City

New bridges - Historical Statistics

  • 1950-1959: 1
  • 1960-1969: 32
  • 1970-1979: 1
  • 1980-1989: 1
  • 1990-1999: 1
  • 2000-2009: 3

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 21001F,  Location: WEST SIDE of CEDAR CITY (Lat: 37.694556,  Lng: -113.073944),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 2.89m (9.48ft),  Average Daily Traffic: 2,300 (year 2008),  Truck Traffic: 30%,  Average Future Daily Traffic: 2,773 (year 2028),  Design Load: HS 20,  Features Intersected: COAL CREEK,  Facility Carried by Structure: CITY STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $256,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $423,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 21002F,  Location: 1 MILE NW. of CEDAR CITY (Lat: 37.699389,  Lng: -113.078719),  Route carried "on" structure: City street ,  Year Built: 1969,  Status: Open,  Structure Length: 3.34m (10.96ft),  Average Daily Traffic: 2,000 (year 2004),  Truck Traffic: 80%,  Average Future Daily Traffic: 2,430 (year 2024),  Design Load: HS 20,  Features Intersected: COAL CREEK,  Facility Carried by Structure: CITY STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.4m (103.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Poor,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $264,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $435,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 21017C,  Location: 200 E.200 NO.-CEDAR CITY (Lat: 37.681583,  Lng: -113.058303),  Route carried "on" structure: City street ,  Year Built: 1998,  Status: Open,  Structure Length: 4.07m (13.35ft),  Average Daily Traffic: 815 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 990 (year 2022),  Design Load: HS 20,  Features Intersected: COAL CREEK,  Facility Carried by Structure: 200 EAST STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.0m (29.5ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.1m (125.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.6m (44.6ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $587,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $969,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: C 565,  Location: IN CEDAR CITY (Lat: 37.677000,  Lng: -113.080278),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 7.28m (23.88ft),  Average Daily Traffic: 950 (year 2002),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,154 (year 2022),  Design Load: HS 20,  Features Intersected: I-15 (SR-15) NBL & SBL,  Facility Carried by Structure: CENTER STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 94.291,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.7m (117.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 35.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.30m (27.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $675,000,  Roadway Improvement Cost: $68,000,  Total Project Cost: $1,115,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: C 821,  Location: NORTH CEDAR INTERCHANGE (Lat: 37.726667,  Lng: -113.046667),  Route carried "on" structure: State highway 130,  Year Built: 2002,  Status: Open,  Structure Length: 7.34m (24.08ft),  Average Daily Traffic: 8,840 (year 2002),  Truck Traffic: 3%,  Average Future Daily Traffic: 10,741 (year 2022),  Design Load: HS 20,  Features Intersected: I-15 (SR-15)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.873,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.0m (124.7ft),  Curb-To-Curb Width: 25.6m (84.0ft),  Out-to-Out Width: 26.7m (87.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: D 546,  Location: IN CEDAR CITY (Lat: 37.686389,  Lng: -113.061775),  Route carried "on" structure: State highway 130,  Year Built: 1951,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 21,145 (year 2002),  Truck Traffic: 2%,  Average Future Daily Traffic: 25,691 (year 2022),  Design Load: HS 20,  Features Intersected: COAL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.643,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 25.8m (84.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.30m (10.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $544,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $897,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: D 761,  Location: 1 MI. NO. CEDAR CITY INT. (Lat: 37.694972,  Lng: -113.077556),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 6.43m (21.10ft),  Average Daily Traffic: 2,000 (year 2002),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,430 (year 2022),  Design Load: HS 20,  Features Intersected: I-15 (SR-15) NBL & SBL,  Facility Carried by Structure: Kitty Hawk 400 W.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 96.287,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 7.50m (24.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $504,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $831,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: E1476,  Location: 1 MI.NO.CEDAR CITY INTER. (Lat: 37.693500,  Lng: -113.077444),  Route carried "on" structure: Interstate 15,  Year Built: 1968,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 21,423 (year 2002),  Truck Traffic: 28%,  Average Future Daily Traffic: 26,029 (year 2022),  Design Load: HS 20,  Features Intersected: COAL CREEK OVERFLOW CHAN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 96.163,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 22 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 40.2m (131.9ft),  Out-to-Out Width: 48.8m (160.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $475,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $785,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: E2481,  Location: 1.5MI.W.of I-15,CEDAR CIT (Lat: 37.683333,  Lng: -113.116667),  Route carried "on" structure: State highway 56,  Year Built: 2004,  Status: Open,  Structure Length: 1.61m (5.28ft),  Average Daily Traffic: 5,185 (year 2002),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,300 (year 2022),  Design Load: HS 20,  Features Intersected: COAL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 94.360,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 25.7m (84.3ft),  Skew: 25 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.2m (23.6ft),  Curb or Sidewalk Widths: Left: 5.4m (17.7ft),  Right: 0.0m,  Curb-To-Curb Width: 25.7m (84.3ft),  Out-to-Out Width: 44.9m (147.3ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007
Find on map >>

Structure Number: F 255,  Location: IN CEDAR CITY (Lat: 37.666694,  Lng: -113.080028),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 1,000 (year 2002),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,215 (year 2022),  Design Load: HS 20,  Features Intersected: I-15 (SR-15),  Facility Carried by Structure: 600 SOUTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 93.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.90m (22.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $560,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $924,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: F 542,  Location: 450 EAST CENTER ST. CEDAR (Lat: 37.677333,  Lng: -113.054136),  Route carried "on" structure: State highway 14,  Year Built: 1988,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 4,352 (year 2002),  Truck Traffic: 8%,  Average Future Daily Traffic: 5,288 (year 2022),  Design Load: HS 20,  Features Intersected: COAL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.665,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 21 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 24.8m (81.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $517,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $854,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1D 762,  Location: NORTH of CEDAR CITY (Lat: 37.721389,  Lng: -113.059167),  Route carried "on" structure: Interstate 15,  Year Built: 1965,  Status: Open,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 9,920 (year 2002),  Truck Traffic: 26%,  Average Future Daily Traffic: 12,053 (year 2022),  Design Load: HS 20,  Features Intersected: NICHOLS CANYON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 99.626,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.20m (17.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $774,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 1D 788,  Location: 2.2 MI.NO.CEDAR CITY INT. (Lat: 37.711556,  Lng: -113.067806),  Route carried "on" structure: Interstate 15,  Year Built: 1968,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 10,712 (year 2002),  Truck Traffic: 26%,  Average Future Daily Traffic: 13,015 (year 2022),  Design Load: HS 20,  Features Intersected: COUNTY ROAD-NO. FIELD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 98.305,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 76.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $312,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $515,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 1F 117,  Location: 0.7 MI.NO.CEDAR CITY INT. (Lat: 37.686056,  Lng: -113.080056),  Route carried "on" structure: Interstate 15,  Year Built: 1968,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 5.46m (17.91ft),  Average Daily Traffic: 10,713 (year 2002),  Truck Traffic: 26%,  Average Future Daily Traffic: 13,016 (year 2022),  Design Load: HS 20,  Features Intersected: 560 NORTH STREET & UPRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 95.355,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 15.6m (51.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.50m (21.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $744,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $1,227,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 1F 119,  Location: CEDAR CITY INTERCHANGE (Lat: 37.680639,  Lng: -113.079528),  Route carried "on" structure: Interstate 15,  Year Built: 1968,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 5.27m (17.29ft),  Average Daily Traffic: 10,712 (year 2002),  Truck Traffic: 26%,  Average Future Daily Traffic: 13,015 (year 2022),  Design Load: HS 20,  Features Intersected: SR-56,200 NORTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 94.689,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 16.3m (53.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.30m (20.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $722,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $1,191,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 1F 12,  Location: 1.1 MI.NO.CEDAR CITY INT. (Lat: 37.697583,  Lng: -113.076472),  Route carried "on" structure: Interstate 15,  Year Built: 1968,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 10,712 (year 2002),  Truck Traffic: 26%,  Average Future Daily Traffic: 13,015 (year 2022),  Design Load: HS 20,  Features Intersected: COAL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 96.519,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.90m (16.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $447,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $738,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 1F 181,  Location: SOUTH CEDAR CITY INTCHG. (Lat: 37.654250,  Lng: -113.082192),  Route carried "on" structure: Interstate 15,  Year Built: 1967,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 10,270 (year 2002),  Truck Traffic: 26%,  Average Future Daily Traffic: 12,478 (year 2022),  Design Load: HS 20,  Features Intersected: CITY ST. & INT. X-ROAD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 91.757,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $324,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $534,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 3C 502,  Location: SO CEDAR CITY INTERCHANGE (Lat: 37.674139,  Lng: -113.083500),  Route carried "on" structure: Ramp State highway 130,  Year Built: 1967,  Status: Open,  Structure Length: 8.23m (27.00ft),  Average Daily Traffic: 4,278 (year 2002),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,198 (year 2022),  Design Load: HS 20,  Features Intersected: I-15 (SR-15) NBL & SBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.20m (30.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $841,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $1,388,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 3D 762,  Location: NORTH of CEDAR CITY (Lat: 37.721972,  Lng: -113.059083),  Route carried "on" structure: Interstate 15,  Year Built: 1965,  Status: Open,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 10,712 (year 2002),  Truck Traffic: 30%,  Average Future Daily Traffic: 13,015 (year 2022),  Design Load: HS 20,  Features Intersected: NICHOLS CANYON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 99.644,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.20m (17.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $774,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 3D 788,  Location: 2.2 MI NO CEDAR CITY INT. (Lat: 37.694972,  Lng: -113.063139),  Route carried "on" structure: Interstate 15,  Year Built: 1968,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 10,713 (year 2002),  Truck Traffic: 30%,  Average Future Daily Traffic: 13,016 (year 2022),  Design Load: HS 20,  Features Intersected: CITY ROAD TO NO. FIELDS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 98.305,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $312,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $515,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 3F 117,  Location: 0.7 MI.NO.CEDAR CITY INT. (Lat: 37.687000,  Lng: -113.079250),  Route carried "on" structure: Interstate 15,  Year Built: 1968,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 5.46m (17.91ft),  Average Daily Traffic: 10,712 (year 2002),  Truck Traffic: 30%,  Average Future Daily Traffic: 13,015 (year 2022),  Design Load: HS 20,  Features Intersected: 560 NORTH STREET & UPRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 95.350,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.50m (21.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $591,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $975,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 3F 119,  Location: CEDAR CITY INTERCHANGE (Lat: 37.681111,  Lng: -113.079969),  Route carried "on" structure: Interstate 15,  Year Built: 1968,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 5.27m (17.29ft),  Average Daily Traffic: 10,490 (year 2002),  Truck Traffic: 30%,  Average Future Daily Traffic: 12,745 (year 2022),  Design Load: HS 20,  Features Intersected: SR-56,200 NORTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 94.689,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 16.3m (53.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.30m (20.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $722,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $1,191,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 3F 12,  Location: 1.1 MI.NO.CEDAR CITY INT. (Lat: 37.697583,  Lng: -113.076472),  Route carried "on" structure: Interstate 15,  Year Built: 1968,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 10,712 (year 2002),  Truck Traffic: 30%,  Average Future Daily Traffic: 13,015 (year 2022),  Design Load: HS 20,  Features Intersected: COAL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 96.541,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.90m (16.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $447,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $738,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 3F 181,  Location: SO.CEDAR CITY INTCHG. (Lat: 37.677556,  Lng: -113.053694),  Route carried "on" structure: Interstate 15,  Year Built: 1967,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 10,270 (year 2002),  Truck Traffic: 30%,  Average Future Daily Traffic: 12,478 (year 2022),  Design Load: HS 20,  Features Intersected: CITY ST. , INT. X-ROAD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 91.757,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $324,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $534,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: C 565,  Location: IN CEDAR CITY (Lat: 37.677000,  Lng: -113.080278),  Route carried "under" structure: Interstate 15,  Year Built: 1968,  Structure Length: 7.28m (23.88ft),  Average Daily Traffic: 20,540 (year 2002),  Truck Traffic: 28%,  Features Intersected: I-15 (SR-15) NBL & SBL,  Facility Carried by Structure: CENTER STREET
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 94.291,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.7m (117.1ft)

Find on map >>

Structure Number: C 821,  Location: NORTH CEDAR INTERCHANGE (Lat: 37.726667,  Lng: -113.046667),  Route carried "under" structure: Interstate 15,  Year Built: 2002,  Structure Length: 7.34m (24.08ft),  Average Daily Traffic: 21,453 (year 2002),  Truck Traffic: 19%,  Features Intersected: I-15 (SR-15),  Facility Carried by Structure: SR-130, INT.X-ROAD
Minimum Vertical Clearance: 0.60m (1.97ft),  Kilometerpoint: 100.579,  Lanes on structure: 4,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.0m (124.7ft)

Find on map >>

Structure Number: D 761,  Location: 1 MI. NO. CEDAR CITY INT. (Lat: 37.694972,  Lng: -113.077556),  Route carried "under" structure: Interstate 15,  Year Built: 1968,  Structure Length: 6.43m (21.10ft),  Average Daily Traffic: 21,423 (year 2002),  Truck Traffic: 28%,  Features Intersected: I-15 (SR-15) NBL & SBL,  Facility Carried by Structure: Kitty Hawk 400 W.
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 96.411,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>

Structure Number: F 255,  Location: IN CEDAR CITY (Lat: 37.666694,  Lng: -113.080028),  Route carried "under" structure: Interstate 15,  Year Built: 1968,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 20,540 (year 2002),  Truck Traffic: 28%,  Features Intersected: I-15 (SR-15),  Facility Carried by Structure: 600 SOUTH STREET
Minimum Vertical Clearance: 6.53m (21.42ft),  Kilometerpoint: 93.139,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>

Structure Number: 1D 762,  Location: NORTH of CEDAR CITY (Lat: 37.721389,  Lng: -113.059167),  Route carried "under" structure: City street ,  Year Built: 1965,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 1,000 (year 2002),  Truck Traffic: 2%,  Features Intersected: NICHOLS CANYON ROAD,  Facility Carried by Structure: I-15 (SR-15) NBL
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 16.2m (53.1ft)

Find on map >>

Structure Number: 1D 788,  Location: 2.2 MI.NO.CEDAR CITY INT. (Lat: 37.711556,  Lng: -113.067806),  Route carried "under" structure: City street ,  Year Built: 1968,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 500 (year 2002),  Truck Traffic: 5%,  Features Intersected: COUNTY ROAD-NO. FIELD,  Facility Carried by Structure: I-15 (SR-15) NBL
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 10.4m (34.1ft)

Find on map >>

Structure Number: 1F 117,  Location: 0.7 MI.NO.CEDAR CITY INT. (Lat: 37.686056,  Lng: -113.080056),  Route carried "under" structure: City street ,  Year Built: 1968,  Structure Length: 5.46m (17.91ft),  Average Daily Traffic: 150 (year 2002),  Truck Traffic: 10%,  Features Intersected: 560 NORTH STREET & UPRR,  Facility Carried by Structure: I-15 (SR-15) NBL
Minimum Vertical Clearance: 7.21m (23.65ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>

Structure Number: 1F 119,  Location: CEDAR CITY INTERCHANGE (Lat: 37.680639,  Lng: -113.079528),  Route carried "under" structure: State highway 56,  Year Built: 1968,  Structure Length: 5.27m (17.29ft),  Average Daily Traffic: 7,727 (year 2002),  Truck Traffic: 3%,  Features Intersected: SR-56,200 NORTH STREET,  Facility Carried by Structure: I-15 (SR-15) NBL
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 97.151,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>

Structure Number: 1F 181,  Location: SOUTH CEDAR CITY INTCHG. (Lat: 37.654250,  Lng: -113.082192),  Route carried "under" structure: City street ,  Year Built: 1967,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 4,000 (year 2002),  Truck Traffic: 10%,  Features Intersected: CITY ST. & INT. X-ROAD.,  Facility Carried by Structure: I-15 (SR-15) NBL
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>

Structure Number: 3C 502,  Location: SO CEDAR CITY INTERCHANGE (Lat: 37.674139,  Lng: -113.083500),  Route carried "under" structure: Interstate 15,  Year Built: 1967,  Structure Length: 8.23m (27.00ft),  Average Daily Traffic: 10,214 (year 2002),  Truck Traffic: 26%,  Features Intersected: I-15 (SR-15) NBL & SBL,  Facility Carried by Structure: SR-130 SBL ONLY
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 9.139,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>

Structure Number: 3D 762,  Location: NORTH of CEDAR CITY (Lat: 37.721972,  Lng: -113.059083),  Route carried "under" structure: City street ,  Year Built: 1965,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 2,000 (year 2002),  Truck Traffic: 2%,  Features Intersected: NICHOLS CANYON ROAD,  Facility Carried by Structure: I-15 (SR-15) SBL
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 16.2m (53.1ft)

Find on map >>

Structure Number: 3D 788,  Location: 2.2 MI NO CEDAR CITY INT. (Lat: 37.694972,  Lng: -113.063139),  Route carried "under" structure: County highway ,  Year Built: 1968,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 100 (year 2002),  Truck Traffic: 5%,  Features Intersected: CITY ROAD TO NO. FIELDS,  Facility Carried by Structure: I-15 (SR-15) SBL
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 10.4m (34.1ft)

Find on map >>

Structure Number: 3F 117,  Location: 0.7 MI.NO.CEDAR CITY INT. (Lat: 37.687000,  Lng: -113.079250),  Route carried "under" structure: City street ,  Year Built: 1968,  Structure Length: 5.46m (17.91ft),  Average Daily Traffic: 150 (year 2002),  Truck Traffic: 10%,  Features Intersected: 560 NORTH STREET & UPRR,  Facility Carried by Structure: I-15 (SR-15) SBL
Minimum Vertical Clearance: 7.21m (23.65ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>

Structure Number: 3F 119,  Location: CEDAR CITY INTERCHANGE (Lat: 37.681111,  Lng: -113.079969),  Route carried "under" structure: State highway 56,  Year Built: 1968,  Structure Length: 5.27m (17.29ft),  Average Daily Traffic: 7,725 (year 2002),  Truck Traffic: 3%,  Features Intersected: SR-56,200 NORTH STREET,  Facility Carried by Structure: I-15 (SR-15) SBL
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 97.185,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>

Structure Number: 3F 181,  Location: SO.CEDAR CITY INTCHG. (Lat: 37.677556,  Lng: -113.053694),  Route carried "under" structure: City street ,  Year Built: 1967,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 4,000 (year 2002),  Truck Traffic: 10%,  Features Intersected: CITY ST. , INT. X-ROAD.,  Facility Carried by Structure: I-15 (SR-15) SBL
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.3m (83.0ft)

Discuss this city on our hugely popular Utah forum

Back to: Cedar City, UT, Utah, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.