Bridge Statistics for Chehalis, Washington (WA) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Chehalis, WA, Washington, Washington forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 16 Total length: 94 meters (308ft) Total costs: $1,267,000 Total average daily traffic: 425,751 Total average daily truck traffic: 87,693 National Bridge Inventory (NBI) Registered Bridges for Chehalis
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 4337A, Location: 0.4 N JCT SR 6 (Lat: 46.666667, Lng: -122.980000), Route carried "on" structure: City street 5, Year Built: 1953, Status: Open, Structure Length: 5.00m (16.40ft), Average Daily Traffic: 2,020 (year 2002), Truck Traffic: 2%, Average Future Daily Traffic: 2,060 , Design Load: HS 15, Features Intersected: I-5, Facility Carried by Structure: WEST ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 126.150, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 9.8m (32.2ft), Skew: 1 degrees, Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 4, Length of Maximum Span: 14.0m (45.9ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 0.9m (3.0ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 10.5m (34.4ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $50,000, Roadway Improvement Cost: $5,000, Total Project Cost: $75,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 5668B, Location: 1.2 N JCT SR 6 (Lat: 46.675478, Lng: -122.975664), Route carried "on" structure: City street 5, Year Built: 1958, Status: Open, Structure Length: 5.64m (18.50ft), Average Daily Traffic: 14,533 (year 2002), Truck Traffic: 2%, Average Future Daily Traffic: 14,824 , Design Load: HS 20, Features Intersected: I-5, Facility Carried by Structure: CHAMBER WAY Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 127.240, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 15.8m (51.8ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 0.9m (3.0ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 10.4m (34.1ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 60.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2008, Bridge Improvement Cost: $61,000, Roadway Improvement Cost: $6,000, Total Project Cost: $92,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 10134A, Location: 6.3 E JCT SR 603 (Lat: 46.659139, Lng: -122.978667), Route carried "on" structure: Ramp State highway 6, Year Built: 1976, Status: Open, Structure Length: 4.60m (15.09ft), Average Daily Traffic: 1,255 (year 2002), Truck Traffic: 10%, Average Future Daily Traffic: 1,268 , Design Load: HS 20+Mod, Features Intersected: DILLENBAUGH CR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 82.590, Lanes on structure: 1, Owner: State Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 18.3m (60.0ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 8.8m (28.9ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 43.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 25.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2008, Bridge Improvement Cost: $38,000, Roadway Improvement Cost: $4,000, Total Project Cost: $57,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 10134B, Location: 6.8 N JCT SR 508 (Lat: 46.660000, Lng: -122.976667), Route carried "on" structure: Ramp Interstate 5, Year Built: 1976, Status: Open, Structure Length: 4.15m (13.62ft), Average Daily Traffic: 2,448 (year 2002), Truck Traffic: 2%, Average Future Daily Traffic: 2,546 (year 2022), Design Load: HS 20+Mod, Features Intersected: DILLENBAUGH CR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 125.440, Lanes on structure: 1, Owner: State Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 18.3m (60.0ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 8.8m (28.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Satisfactory, Operating Rating: 81.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 47.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present desirable criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 48 months, Inspection Date: July 2005, Bridge Improvement Cost: $35,000, Roadway Improvement Cost: $4,000, Total Project Cost: $53,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 11336A, Location: 6.5 N JCT SR 508 (Lat: 46.655000, Lng: -122.975000), Route carried "on" structure: Interstate 5, Year Built: 1953, Status: Open, Structure Length: 6.07m (19.91ft), Average Daily Traffic: 63,560 (year 2006), Truck Traffic: 22%, Average Future Daily Traffic: 97,800 (year 2026), Design Load: HS 20, Features Intersected: CW RY Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 124.710, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 24.4m (80.1ft), Skew: 30 degrees, Material/Design: Concrete continuous, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 19.8m (65.0ft), Curb-To-Curb Width: 24.5m (80.4ft), Out-to-Out Width: 25.9m (85.0ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2008, Bridge Improvement Cost: $132,000, Roadway Improvement Cost: $13,000, Total Project Cost: $198,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 11430A, Location: 6.8 N JCT SR 508 (Lat: 46.660486, Lng: -122.978333), Route carried "on" structure: Interstate 5, Year Built: 1952, Year Reconstructed: 1979, Status: Open, Structure Length: 4.94m (16.21ft), Average Daily Traffic: 56,912 (year 2006), Truck Traffic: 22%, Average Future Daily Traffic: 87,600 (year 2026), Design Load: HS 20+Mod, Features Intersected: DILLENBAUGH CRK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 125.240, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 30 degrees, Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 8, Length of Maximum Span: 6.7m (22.0ft), Curb-To-Curb Width: 24.7m (81.0ft), Out-to-Out Width: 25.6m (84.0ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Very good, Operating Rating: 49.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 28.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $114,000, Roadway Improvement Cost: $11,000, Total Project Cost: $171,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 11430B, Location: 26.7 E PACIFIC CO (Lat: 46.660000, Lng: -122.976667), Route carried "on" structure: State highway 6, Year Built: 1980, Status: Open, Structure Length: 6.52m (21.39ft), Average Daily Traffic: 13,444 (year 2006), Truck Traffic: 9%, Average Future Daily Traffic: 21,600 (year 2026), Design Load: HS 20+Mod, Features Intersected: I-5 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 82.590, Lanes on structure: 4, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 18.9m (62.0ft), Skew: 1 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 32.6m (107.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 2.3m (7.5ft), Curb-To-Curb Width: 18.6m (61.0ft), Out-to-Out Width: 21.8m (71.5ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 53.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 31.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: December 2007, Bridge Improvement Cost: $114,000, Roadway Improvement Cost: $11,000, Total Project Cost: $171,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 12597A, Location: 6.1 N JCT SR 508 (Lat: 46.651667, Lng: -122.971667), Route carried "on" structure: Interstate 5, Year Built: 1954, Year Reconstructed: 1986, Status: Open, Structure Length: 16.37m (53.71ft), Average Daily Traffic: 63,560 (year 2006), Truck Traffic: 22%, Average Future Daily Traffic: 97,800 (year 2026), Design Load: HS 20+Mod, Features Intersected: NP RY & DILLENBAUGH CR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 124.090, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Skew: 35 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 8, Length of Maximum Span: 28.3m (92.8ft), Curb-To-Curb Width: 24.7m (81.0ft), Out-to-Out Width: 25.8m (84.6ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Very good, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: June 2008, Bridge Improvement Cost: $300,000, Roadway Improvement Cost: $30,000, Total Project Cost: $450,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 85257, Location: 0.1 W OF NE KRESKY (Lat: 46.681667, Lng: -122.955000), Route carried "on" structure: Alternate City street 600, Year Built: 1971, Status: Open, Structure Length: 1.83m (6.00ft), Average Daily Traffic: 1,553 (year 2002), Truck Traffic: 5%, Average Future Daily Traffic: 2,300 , Design Load: H 15, Features Intersected: SALZER CREEK, Facility Carried by Structure: NE EXHIBITOR RD. Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.030, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 3, Length of Maximum Span: 6.1m (20.0ft), Curb-To-Curb Width: 10.1m (33.1ft), Out-to-Out Width: 11.5m (37.7ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 37.8 metric tons, Inventory Rating: 24.3 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2008, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 85337, Location: 0.1 N OF NE HAMPE (Lat: 46.680000, Lng: -122.963333), Route carried "on" structure: Alternate City street 300, Year Built: 1936, Year Reconstructed: 1974, Status: Open, Structure Length: 4.72m (15.49ft), Average Daily Traffic: 11,436 (year 2002), Truck Traffic: 5%, Average Future Daily Traffic: 23,000 , Design Load: H 15, Features Intersected: SALZER CREEK, Facility Carried by Structure: N NATIONAL AVE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.090, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 11.3m (37.1ft), Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 8, Length of Maximum Span: 6.1m (20.0ft), Curb-To-Curb Width: 10.7m (35.1ft), Out-to-Out Width: 11.9m (39.0ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Very good, Operating Rating: 37.8 metric tons, Inventory Rating: 24.3 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2008, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 85338, Location: 0.4 N OF NE HAMPE (Lat: 46.693333, Lng: -122.955000), Route carried "on" structure: Alternate City street 400, Year Built: 1964, Status: Open, Structure Length: 1.28m (4.20ft), Average Daily Traffic: 7,707 (year 2002), Truck Traffic: 5%, Average Future Daily Traffic: 25,000 , Features Intersected: SALZER CREEK, Facility Carried by Structure: NE KRESKY RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.570, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 8.8m (28.9ft), Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 2, Length of Maximum Span: 7.3m (24.0ft), Curb-To-Curb Width: 8.6m (28.2ft), Out-to-Out Width: 9.2m (30.2ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Very good, Operating Rating: 37.8 metric tons, Inventory Rating: 24.3 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2008, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 85516, Location: 0.1 E OF INTERSTATE 5 (Lat: 46.673750, Lng: -122.971528), Route carried "on" structure: City street 500, Year Built: 1952, Status: Open, Structure Length: 11.46m (37.60ft), Average Daily Traffic: 11,000 (year 1996), Truck Traffic: 5%, Average Future Daily Traffic: 17,000 , Features Intersected: BN RR & N NAT'L AVE, Facility Carried by Structure: CHAMBER WAY Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.450, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 6, Length of Maximum Span: 36.3m (119.1ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 0.9m (3.0ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 11.0m (36.1ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 46.8 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR), Inventory Rating: 27.9 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: December 2006, Critical Feature Inspection Date: December 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 86159, Location: RIVERSIDE DRIVE (Lat: 46.658333, Lng: -122.975000), Route carried "on" structure: City street 190, Year Built: 1952, Status: Open, Structure Length: 4.97m (16.31ft), Average Daily Traffic: 3,841 (year 2002), Truck Traffic: 7%, Average Future Daily Traffic: 6,700 , Design Load: H 15, Features Intersected: DILLENBAUGH CREEK, Facility Carried by Structure: RIVERSIDE DR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.130, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 8, Length of Maximum Span: 6.7m (22.0ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 0.9m (3.0ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 10.4m (34.1ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Good, Channel: Satisfactory, Operating Rating: 38.7 metric tons, Inventory Rating: 24.3 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2008, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 4337A, Location: 0.4 N JCT SR 6 (Lat: 46.666667, Lng: -122.980000), Route carried "under" structure: Interstate 5, Year Built: 1953, Structure Length: 5.00m (16.40ft), Average Daily Traffic: 62,691 (year 2002), Truck Traffic: 30%, Features Intersected: I-5, Facility Carried by Structure: WEST ST Minimum Vertical Clearance: 5.89m (19.32ft), Kilometerpoint: 12.615, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Slab, Length of Maximum Span: 14.0m (45.9ft) Find on map >>
Structure Number: 5668B, Location: 1.2 N JCT SR 6 (Lat: 46.675478, Lng: -122.975664), Route carried "under" structure: Interstate 5, Year Built: 1958, Structure Length: 5.64m (18.50ft), Average Daily Traffic: 55,791 (year 2002), Truck Traffic: 30%, Features Intersected: I-5, Facility Carried by Structure: CHAMBER WAY Minimum Vertical Clearance: 4.78m (15.68ft), Kilometerpoint: 12.724, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 15.8m (51.8ft) Find on map >>
Structure Number: 11430B, Location: 6.9 N JCT SR 508 (Lat: 46.660000, Lng: -122.976667), Route carried "under" structure: Interstate 5, Year Built: 1980, Structure Length: 6.52m (21.39ft), Average Daily Traffic: 54,000 (year 2002), Truck Traffic: 15%, Features Intersected: I-5, Facility Carried by Structure: SR 6 Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 12.545, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.6m (107.0ft) Discuss this city on our hugely popular Washington forum Back to: Chehalis, WA, Washington, All US cities.
|
![]() |