Bridge Statistics for Chelmsford, Massachusetts (MA) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Chelmsford, MA, Massachusetts, Massachusetts forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 59 Total length: 287 meters (942ft) Total costs: $45,096,000 Total average daily traffic: 3,097,773 Total average daily truck traffic: 274,418 National Bridge Inventory (NBI) Registered Bridges for Chelmsford
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Bridge Condition - Culverts Find on map >>
Structure Number: C080452GDMHDNBI, Location: 1.4 MI NW DRUM HILL (Lat: 42.627533, Lng: -71.392578), Route carried "on" structure: US 3, Year Built: 1959, Status: Open, Structure Length: 0.88m (2.89ft), Average Daily Traffic: 86,100 (year 2007), Truck Traffic: 15%, Average Future Daily Traffic: 135,978 (year 2028), Design Load: H 20, Features Intersected: WATER MOORES CANAL Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 132.928, Lanes on structure: 6, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 22 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 4.3m (14.1ft) Condition: Channel: Good, Culverts: Good, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.00m (6.56ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: March 2007, Underwater Inspection Date: April 2003, Bridge Improvement Cost: $695,000, Roadway Improvement Cost: $70,000, Total Project Cost: $1,043,000 ( Estimate for 2006), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: C080466G6MHDNBI, Location: 2 MI. NW DRUM HILL (Lat: 42.629875, Lng: -71.402469), Route carried "on" structure: US 3, Year Built: 2004, Status: Open, Structure Length: 3.27m (10.73ft), Average Daily Traffic: 62,100 (year 2007), Truck Traffic: 15%, Average Future Daily Traffic: 98,075 (year 2028), Design Load: HS 25, Features Intersected: HWY MAIN ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 137.502, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 23.5m (77.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 31.5m (103.3ft), Curb-To-Curb Width: 23.5m (77.1ft), Out-to-Out Width: 24.5m (80.4ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Very good, Operating Rating: 92.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 55.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: C080466G8MHDNBI, Location: 2 MI. NW DRUM HILL (Lat: 42.629708, Lng: -71.402603), Route carried "on" structure: US 3, Year Built: 2004, Status: Open, Structure Length: 3.27m (10.73ft), Average Daily Traffic: 62,100 (year 2007), Truck Traffic: 15%, Average Future Daily Traffic: 98,075 (year 2028), Design Load: HS 25, Features Intersected: HWY MAIN ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 137.502, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 24.5m (80.4ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 31.5m (103.3ft), Curb-To-Curb Width: 24.5m (80.4ft), Out-to-Out Width: 25.5m (83.7ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Very good, Operating Rating: 85.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 51.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: C0804785VMHDNBI, Location: RTE 3 AT RTE 40 (Lat: 42.631753, Lng: -71.405692), Route carried "on" structure: US 3, Year Built: 2004, Status: Open, Structure Length: 4.14m (13.58ft), Average Daily Traffic: 45,700 (year 2007), Truck Traffic: 25%, Average Future Daily Traffic: 72,174 (year 2028), Design Load: HS 25, Features Intersected: ST 40 GROTON RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 138.303, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 29.1m (95.5ft), Skew: 11 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 38.9m (127.6ft), Curb-To-Curb Width: 29.1m (95.5ft), Out-to-Out Width: 30.1m (98.8ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Very good, Inventory Rating: 61.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: C0804785WMHDNBI, Location: RTE 3 AT RTE 40 (Lat: 42.631672, Lng: -71.405950), Route carried "on" structure: US 3, Year Built: 2004, Status: Open, Structure Length: 4.14m (13.58ft), Average Daily Traffic: 45,700 (year 2007), Truck Traffic: 25%, Average Future Daily Traffic: 72,174 (year 2028), Design Load: HS 25, Features Intersected: ST 40 GROTON RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 138.303, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 22.9m (75.1ft), Skew: 31 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 40.2m (131.9ft), Curb-To-Curb Width: 22.9m (75.1ft), Out-to-Out Width: 23.9m (78.4ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 97.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 58.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: C080482LPMHDNBI, Location: 0.25 MI N RT 110 & HUNT (Lat: 42.590833, Lng: -71.378997), Route carried "on" structure: City street , Year Built: 1961, Status: Open, Structure Length: 9.14m (29.99ft), Average Daily Traffic: 5,172 (year 2007), Truck Traffic: 4%, Average Future Daily Traffic: 8,168 (year 2028), Design Load: HS 20, Features Intersected: I 495, Facility Carried by Structure: HWY HUNT RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 2 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 24.1m (79.1ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 15.1m (49.5ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 49.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 29.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 9.20m (30.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $2,480,000, Roadway Improvement Cost: $249,000, Total Project Cost: $3,721,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: C080362LQMHDNBI, Location: 0.75 MI W RT 110 (Lat: 42.600000, Lng: -71.366667), Route carried "under" structure: Interstate 495, Year Built: 1961, Structure Length: 11.89m (39.01ft), Average Daily Traffic: 93,700 (year 0 ), Features Intersected: I 495 NB, Facility Carried by Structure: HWY WESTFORD ST Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.6m (74.1ft) Find on map >>
Structure Number: C080362LQMHDNBI, Location: 0.75 MI W RT 110 (Lat: 42.600000, Lng: -71.366667), Route carried "under" structure: Interstate 495, Year Built: 1961, Structure Length: 11.89m (39.01ft), Average Daily Traffic: 93,700 (year 0 ), Features Intersected: I 495 SB, Facility Carried by Structure: HWY WESTFORD ST Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.6m (74.1ft) Find on map >>
Structure Number: C080372K7MHDNBI, Location: RT 4 AT RT 495 (Lat: 42.600000, Lng: -71.350000), Route carried "under" structure: Interstate 495, Year Built: 1961, Structure Length: 4.75m (15.58ft), Average Daily Traffic: 22,051 (year 0 ), Features Intersected: I 495 NB, Facility Carried by Structure: ST 4 Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.3m (73.2ft) Find on map >>
Structure Number: C080372K7MHDNBI, Location: RT 4 AT RT 495 (Lat: 42.600000, Lng: -71.350000), Route carried "under" structure: Interstate 495, Year Built: 1961, Structure Length: 4.75m (15.58ft), Average Daily Traffic: 22,050 (year 0 ), Features Intersected: I 495 SB, Facility Carried by Structure: ST 4 Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.3m (73.2ft) Find on map >>
Structure Number: C080382LVMHDNBI, Location: 1 MI E RT 3 (Lat: 42.616667, Lng: -71.300000), Route carried "under" structure: Interstate 495, Year Built: 1962, Structure Length: 7.50m (24.61ft), Average Daily Traffic: 83,050 (year 0 ), Features Intersected: I 495 NB, Facility Carried by Structure: HWY CARLISLE ST Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 14.532, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.7m (81.0ft) Find on map >>
Structure Number: C080382LVMHDNBI, Location: 1 MI E RT 3 (Lat: 42.616667, Lng: -71.300000), Route carried "under" structure: Interstate 495, Year Built: 1962, Structure Length: 7.50m (24.61ft), Average Daily Traffic: 83,050 (year 0 ), Features Intersected: I 495 SB, Facility Carried by Structure: HWY CARLISLE ST Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 14.532, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.7m (81.0ft) Find on map >>
Structure Number: C080392DHMHDNBI, Location: 1.25 MI W RT495/RT3 (Lat: 42.616667, Lng: -71.300000), Route carried "under" structure: Interstate 495, Year Built: 1962, Structure Length: 8.14m (26.71ft), Average Daily Traffic: 93,700 (year 0 ), Features Intersected: I 495 NB, Facility Carried by Structure: ST 3 A GORHAM ST Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 23.2m (76.1ft) Find on map >>
Structure Number: C080392DHMHDNBI, Location: 1.25 MI W RT495/RT3 (Lat: 42.616667, Lng: -71.300000), Route carried "under" structure: Interstate 495, Year Built: 1962, Structure Length: 8.14m (26.71ft), Average Daily Traffic: 93,700 (year 0 ), Features Intersected: I 495 SB, Facility Carried by Structure: ST 3 A GORHAM ST Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 23.2m (76.1ft) Find on map >>
Structure Number: C080482LPMHDNBI, Location: 0.25 MI N RT 110 & HUNT (Lat: 42.583333, Lng: -71.383333), Route carried "under" structure: Interstate 495, Year Built: 1961, Structure Length: 9.14m (29.99ft), Average Daily Traffic: 87,300 (year 0 ), Features Intersected: I 495 NB, Facility Carried by Structure: HWY HUNT RD Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.6m (74.1ft) Find on map >>
Structure Number: C080482LPMHDNBI, Location: 0.25 MI N RT 110 & HUNT (Lat: 42.583333, Lng: -71.383333), Route carried "under" structure: Interstate 495, Year Built: 1961, Structure Length: 9.14m (29.99ft), Average Daily Traffic: 87,300 (year 0 ), Features Intersected: I 495 SB, Facility Carried by Structure: HWY HUNT RD Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.6m (74.1ft) Discuss this city on our hugely popular Massachusetts forum Back to: Chelmsford, MA, Massachusetts, All US cities.
|
![]() |