![]() |
Bridge Statistics for Chicago Heights, Illinois (IL) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Chicago Heights, IL, Illinois, Illinois forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 12 Total length: 21 meters (69ft) Total costs: $781,000 Total average daily traffic: 163,868 Total average daily truck traffic: 14,253 National Bridge Inventory (NBI) Registered Bridges for Chicago Heights
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 16091904522, Location: 0.5 M E IL 1 (Lat: 41.520700, Lng: -87.625697), Route carried "on" structure: Other road 1631, Year Built: 1958, Status: Open, Structure Length: 1.33m (4.36ft), Average Daily Traffic: 20,000 (year 2006), Truck Traffic: 9%, Average Future Daily Traffic: 21,195 (year 2021), Design Load: H 20, Features Intersected: THORN CREEK, Facility Carried by Structure: JOE ORR RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.039, Lanes on structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.8m (42.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 13.7m (44.9ft), Out-to-Out Width: 17.7m (58.1ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Good, Channel: Satisfactory, Operating Rating: 62.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 40.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.07m (6.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $339,000, Roadway Improvement Cost: $34,000, Total Project Cost: $509,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 16250313672, Location: 2 M W IL 394 (Lat: 41.506217, Lng: -87.613303), Route carried "on" structure: US 30, Year Built: 1982, Status: Open, Structure Length: 0.98m (3.22ft), Average Daily Traffic: 16,900 (year 2007), Truck Traffic: 16%, Average Future Daily Traffic: 25,245 (year 2021), Design Load: HS 20, Features Intersected: THIRD CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 237.376, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.1m (29.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.5m (4.9ft), Curb-To-Curb Width: 16.5m (54.1ft), Out-to-Out Width: 18.8m (61.7ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Channel: Fair, Operating Rating: 64.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: March 2007, Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 16253717869, Location: 0.2 M W OF IL 1 (Lat: 41.506072, Lng: -87.644517), Route carried "on" structure: US 30, Year Built: 1986, Status: Open, Structure Length: 1.96m (6.43ft), Average Daily Traffic: 24,900 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 33,885 (year 2021), Design Load: HS 20, Features Intersected: THORN CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 234.737, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 16.8m (55.1ft), Skew: 1 degrees, Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 3, Length of Maximum Span: 7.3m (24.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 16.8m (55.1ft), Out-to-Out Width: 20.4m (66.9ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Good, Channel: Satisfactory, Operating Rating: 56.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 16254517871, Location: 0.6 M N OF US 30 (Lat: 41.513525, Lng: -87.635586), Route carried "on" structure: Other road 2886, Year Built: 1986, Status: Open, Structure Length: 2.87m (9.42ft), Average Daily Traffic: 10,100 (year 2006), Truck Traffic: 8%, Average Future Daily Traffic: 13,811 (year 2021), Features Intersected: THORN CREEK, Facility Carried by Structure: IL 1 (HALSTED ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.177, Lanes on structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Skew: 3 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 28.0m (91.9ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 16.5m (54.1ft), Out-to-Out Width: 20.4m (66.9ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Channel: Good, Operating Rating: 80.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 37.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 36 months, Inspection Date: October 2005, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 16254620694, Location: 0.5 M N OF US 30 (Lat: 41.509297, Lng: -87.641492), Route carried "on" structure: State highway 1, Year Built: 1987, Status: Open, Structure Length: 2.54m (8.33ft), Average Daily Traffic: 21,600 (year 2007), Truck Traffic: 4%, Average Future Daily Traffic: 34,020 (year 2021), Design Load: HS 20, Features Intersected: THORN CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 496.956, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.8m (51.8ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 24.1m (79.1ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 15.8m (51.8ft), Out-to-Out Width: 19.5m (64.0ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Very good, Channel: Satisfactory, Operating Rating: 89.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 54.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 36 months, Inspection Date: June 2005, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 16308704532, Location: 0.1 M S MAIN P2 (Lat: 41.542122, Lng: -87.611539), Route carried "on" structure: Other road 2916, Year Built: 1953, Status: Open, Structure Length: 1.74m (5.71ft), Average Daily Traffic: 2,750 (year 2006), Truck Traffic: 13%, Average Future Daily Traffic: 5,400 (year 2021), Design Load: HS 20, Features Intersected: DEER CREEK, Facility Carried by Structure: STATE ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.145, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 16.2m (53.1ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 1.2m (3.9ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 11.0m (36.1ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Channel: Very good, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.44m (8.01ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Bridge Improvement Cost: $181,000, Roadway Improvement Cost: $18,000, Total Project Cost: $272,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 16322401084, Location: 0.7M.S.OF US-30 (Lat: 41.494731, Lng: -87.616203), Route carried "on" structure: Other road 2916, Year Built: 1987, Status: Open, Structure Length: 0.73m (2.40ft), Average Daily Traffic: 7,000 (year 2006), Truck Traffic: 17%, Average Future Daily Traffic: 11,610 (year 2021), Design Load: HS 20, Features Intersected: THIRD CREEK, Facility Carried by Structure: STATE ST. Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.487, Lanes on structure: 4, Owner: County Highway Agency, Approaching Roadway Width: 19.5m (64.0ft), Skew: 23 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.4m (11.2ft), Curb-To-Curb Width: 19.5m (64.0ft), Out-to-Out Width: 27.0m (88.6ft) Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 48 months, Inspection Date: October 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 16640027703, Location: 0.5 M E ASHLND P2 (Lat: 41.502311, Lng: -87.647022), Route carried "on" structure: City street 4330, Year Built: 1926, Status: Open, Structure Length: 1.16m (3.81ft), Average Daily Traffic: 309 (year 1998), Average Future Daily Traffic: 371 (year 2020), Features Intersected: THORN CREEK, Facility Carried by Structure: 15TH ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.816, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 10.4m (34.1ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.7m (35.1ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 14.6m (47.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Very good, Channel: Good, Operating Rating: 33.3 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 24.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 16675527704, Location: 0.5 M E ASHLAND AVE (Lat: 41.501356, Lng: -87.647764), Route carried "on" structure: City street 4370, Year Built: 1926, Year Reconstructed: 1993, Status: Open, Structure Length: 1.16m (3.81ft), Average Daily Traffic: 8,009 (year 2002), Truck Traffic: 1%, Average Future Daily Traffic: 6,609 (year 2020), Design Load: HS 20, Features Intersected: THORN CREEK, Facility Carried by Structure: 16TH STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.301, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.7m (35.1ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 12.8m (42.0ft) Condition: Deck: Good, Superstructure: Fair, Substructure: Good, Channel: Very good, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 16027822999, Location: 2.8 M W ILL 394 P2 (Lat: 41.506161, Lng: -87.633644), Route carried "under" structure: US 30, Year Built: 1900, Structure Length: 2.19m (7.19ft), Average Daily Traffic: 17,400 (year 2007), Truck Traffic: 9%, Features Intersected: US 30 (LINCOLN HWY), Facility Carried by Structure: UP (CSXT) SOO RR Minimum Vertical Clearance: 4.29m (14.07ft), Kilometerpoint: 23.567, Lanes under structure: 4, Material/Design: Concrete, Length of Maximum Span: 21.3m (69.9ft) Find on map >>
Structure Number: 16092023568, Location: 2.2 M W ILL 394 P2 (Lat: 41.520719, Lng: -87.623022), Route carried "under" structure: Other road 1631, Year Built: 1958, Structure Length: 2.13m (6.99ft), Average Daily Traffic: 10,000 (year 2006), Truck Traffic: 9%, Features Intersected: JOE ORR RD, Facility Carried by Structure: UP (CSXT) SOO RR Minimum Vertical Clearance: 4.34m (14.24ft), Kilometerpoint: 4.264, Lanes under structure: 2, Material/Design: Steel, Length of Maximum Span: 21.0m (68.9ft) Find on map >>
Structure Number: 16675617872, Location: .5M W.OFHALSTED ST. (Lat: 41.506028, Lng: -87.651344), Route carried "under" structure: US 30, Year Built: 1986, Structure Length: 2.85m (9.35ft), Average Daily Traffic: 24,900 (year 2007), Truck Traffic: 8%, Features Intersected: LINCOLN HWY/US 30, Facility Carried by Structure: PEDESTRIAN OVRPASS Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 234.174, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.0m (91.9ft) Discuss this city on our hugely popular Illinois forum Back to: Chicago Heights, IL, Illinois, All US cities.
|
![]() |