![]() |
Bridge Statistics for Cicero, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Cicero, NY, New York, New York forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 36 Total length: 204 meters (669ft) Total costs: $83,111,000 Total average daily traffic: 730,045 Total average daily truck traffic: 120,324 National Bridge Inventory (NBI) Registered Bridges for Cicero
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 1021961, Location: JCT OF RTS I-81 SB + 31 (Lat: 43.175597, Lng: -76.116094), Route carried "on" structure: Interstate 81, Year Built: 1959, Status: Open, Structure Length: 4.96m (16.27ft), Average Daily Traffic: 25,619 (year 2007), Truck Traffic: 20%, Average Future Daily Traffic: 35,867 (year 2027), Design Load: HS 20, Features Intersected: RTE 31 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 12.928, Lanes on structure: 3, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.2m (49.9ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 23.1m (75.8ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 14.3m (46.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 73.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 43.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.96m (16.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $2,176,000, Roadway Improvement Cost: $1,262,000, Total Project Cost: $3,438,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 1021962, Location: JCT OF RTS I-81 NB + 31 (Lat: 43.175603, Lng: -76.115761), Route carried "on" structure: Interstate 81, Year Built: 1959, Status: Open, Structure Length: 4.96m (16.27ft), Average Daily Traffic: 25,619 (year 2007), Truck Traffic: 20%, Average Future Daily Traffic: 35,867 (year 2027), Design Load: HS 20, Features Intersected: RTE 31 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 12.928, Lanes on structure: 3, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 16.4m (53.8ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 23.1m (75.8ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 14.3m (46.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 73.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 43.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.96m (16.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $2,176,000, Roadway Improvement Cost: $1,262,000, Total Project Cost: $3,438,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 102197, Location: 0.1 MI E JCT RTS 31 & 298 (Lat: 43.154914, Lng: -75.971342), Route carried "on" structure: State highway 31, Year Built: 1999, Status: Open, Structure Length: 6.33m (20.77ft), Average Daily Traffic: 11,983 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 16,776 (year 2026), Design Load: HS 25, Features Intersected: CHITTENANGO CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.163, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 3, Length of Maximum Span: 20.4m (66.9ft), Curb or Sidewalk Widths: Left: 1.7m (5.6ft), Right: 1.7m (5.6ft), Curb-To-Curb Width: 12.1m (39.7ft), Out-to-Out Width: 16.3m (53.5ft) Condition: Deck: Good, Superstructure: Good, Substructure: Excellent, Channel: Good, Operating Rating: 74.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 44.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.33m (20.77ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Bridge Improvement Cost: $2,226,000, Roadway Improvement Cost: $1,291,000, Total Project Cost: $3,517,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 103169, Location: 1.6 MI NE JCT RTS I-81+11 (Lat: 43.123906, Lng: -76.124208), Route carried "on" structure: County highway , Year Built: 1959, Year Reconstructed: 1971, Status: Open, Structure Length: 9.84m (32.28ft), Average Daily Traffic: 16,939 (year 2005), Truck Traffic: 6%, Average Future Daily Traffic: 23,715 (year 2025), Design Load: HS 20, Features Intersected: RTE I81, Facility Carried by Structure: TAFT ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 19.5m (64.0ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 26.8m (87.9ft), Curb or Sidewalk Widths: Left: 1.4m (4.6ft), Right: 1.4m (4.6ft), Curb-To-Curb Width: 19.5m (64.0ft), Out-to-Out Width: 23.1m (75.8ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Operating Rating: 67.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 9.84m (32.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $4,910,000, Roadway Improvement Cost: $2,848,000, Total Project Cost: $7,758,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 1031711, Location: JCT OF RTS 481 SB & I-81 (Lat: 43.141467, Lng: -76.112644), Route carried "on" structure: Interstate 481, Year Built: 1986, Status: Open, Structure Length: 8.26m (27.10ft), Average Daily Traffic: 15,976 (year 2007), Truck Traffic: 20%, Average Future Daily Traffic: 22,366 (year 2027), Design Load: HS 20, Features Intersected: RTE I81 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 23.129, Lanes on structure: 3, Lanes under structure: 8, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Skew: 3 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 40.8m (133.9ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 14.4m (47.2ft), Out-to-Out Width: 15.3m (50.2ft) Condition: Deck: Good, Superstructure: Good, Substructure: Very good, Operating Rating: 77.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 46.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.26m (27.10ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $4,910,000, Roadway Improvement Cost: $2,848,000, Total Project Cost: $7,758,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 1031712, Location: JCT OF RTS 481 NB & I-81 (Lat: 43.141586, Lng: -76.112419), Route carried "on" structure: Interstate 481, Year Built: 1986, Status: Open, Structure Length: 8.26m (27.10ft), Average Daily Traffic: 15,976 (year 2007), Truck Traffic: 20%, Average Future Daily Traffic: 22,366 (year 2027), Design Load: HS 20, Features Intersected: RTE I81 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 23.129, Lanes on structure: 3, Lanes under structure: 8, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 13.1m (43.0ft), Skew: 3 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 40.8m (133.9ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 14.4m (47.2ft), Out-to-Out Width: 15.3m (50.2ft) Condition: Deck: Good, Superstructure: Good, Substructure: Very good, Operating Rating: 77.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 46.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.26m (27.10ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $4,910,000, Roadway Improvement Cost: $2,848,000, Total Project Cost: $7,758,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 103172, Location: .6 MI N JCT I81 & SH 481 (Lat: 43.149694, Lng: -76.109997), Route carried "on" structure: County highway , Year Built: 1959, Status: Open, Structure Length: 9.90m (32.48ft), Average Daily Traffic: 12,628 (year 2001), Truck Traffic: 5%, Average Future Daily Traffic: 17,679 (year 2021), Design Load: HS 20, Features Intersected: RTE I81, Facility Carried by Structure: SOUTH BAY RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 10.6m (34.8ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 30.4m (99.7ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 65.3 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 9.90m (32.48ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $4,910,000, Roadway Improvement Cost: $2,848,000, Total Project Cost: $7,758,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 103173, Location: 3 MI N JCT I81 & SH 31 (Lat: 43.217114, Lng: -76.129675), Route carried "on" structure: County highway , Year Built: 1996, Status: Open, Structure Length: 7.92m (25.98ft), Average Daily Traffic: 1,585 (year 2002), Truck Traffic: 5%, Average Future Daily Traffic: 2,219 (year 2022), Design Load: HS 25, Features Intersected: RTE I81, Facility Carried by Structure: MUD MILL ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 10.0m (32.8ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 39.3m (128.9ft), Curb-To-Curb Width: 10.3m (33.8ft), Out-to-Out Width: 11.4m (37.4ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Excellent, Operating Rating: 81.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.92m (25.98ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $4,910,000, Roadway Improvement Cost: $2,848,000, Total Project Cost: $7,758,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 103174, Location: EXIT 31 OF I81 (Lat: 43.231750, Lng: -76.128917), Route carried "on" structure: County highway , Year Built: 1959, Status: Posted for load-capacity, Structure Length: 7.71m (25.30ft), Average Daily Traffic: 7,033 (year 1999), Truck Traffic: 5%, Average Future Daily Traffic: 9,846 (year 2019), Design Load: HS 20, Features Intersected: RTE I81, Facility Carried by Structure: BARTELL ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 7, Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 23.7m (77.8ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 12.8m (42.0ft) Condition: Deck: Poor, Superstructure: Poor, Substructure: Serious, Operating Rating: 30.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 18.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of corrective action, Deck Geometry: Meets minimum limits, Underclear: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.71m (25.30ft), Designated Inspection Frequency: Every 12 months, Inspection Date: June 2007, Bridge Improvement Cost: $3,384,000, Roadway Improvement Cost: $2,254,000, Total Project Cost: $5,638,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 104522, Location: 2.3 MI SW JCT RTS 298 &31 (Lat: 43.129028, Lng: -75.991956), Route carried "on" structure: State highway 298, Year Built: 1993, Status: Open, Structure Length: 1.40m (4.59ft), Average Daily Traffic: 7,135 (year 2006), Truck Traffic: 5%, Average Future Daily Traffic: 9,989 (year 2026), Design Load: HS 25, Features Intersected: TAYLOR COMM DITCH Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 18.175, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 4 degrees, Material/Design: Prestressed concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.8m (42.0ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 9.8m (32.2ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Excellent, Channel: Poor, Operating Rating: 71.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 46.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.40m (4.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $1,947,000, Roadway Improvement Cost: $1,158,000, Total Project Cost: $3,105,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 1061701, Location: JCT OF SH 481 SB & US 11 (Lat: 43.147800, Lng: -76.126061), Route carried "on" structure: State highway 481, Year Built: 1972, Status: Open, Structure Length: 3.96m (12.99ft), Average Daily Traffic: 25,216 (year 2004), Truck Traffic: 7%, Average Future Daily Traffic: 35,302 (year 2024), Design Load: HS 20, Features Intersected: RTE 11 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.891, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 37.7m (123.7ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 12.4m (40.7ft), Out-to-Out Width: 13.4m (44.0ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Inventory Rating: 62.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Better than present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.96m (12.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $896,000, Roadway Improvement Cost: $533,000, Total Project Cost: $1,429,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete Find on map >>
Structure Number: 1061702, Location: JCT OF SH 481 NB & US 11 (Lat: 43.147911, Lng: -76.125878), Route carried "on" structure: State highway 481, Year Built: 1972, Status: Open, Structure Length: 3.96m (12.99ft), Average Daily Traffic: 12,260 (year 2002), Truck Traffic: 7%, Average Future Daily Traffic: 17,164 (year 2022), Design Load: HS 20, Features Intersected: RTE 11 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.891, Lanes on structure: 3, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.8m (51.8ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 37.7m (123.7ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 17.1m (56.1ft), Out-to-Out Width: 18.7m (61.4ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 98.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 59.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.96m (12.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $896,000, Roadway Improvement Cost: $533,000, Total Project Cost: $1,429,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete Find on map >>
Structure Number: 1072591, Location: 1.5 MI E JCT I81 & I481 (Lat: 43.136942, Lng: -76.082986), Route carried "on" structure: Interstate 481, Year Built: 1986, Status: Open, Structure Length: 5.97m (19.59ft), Average Daily Traffic: 31,952 (year 2007), Truck Traffic: 20%, Average Future Daily Traffic: 44,733 (year 2027), Design Load: HS 20, Features Intersected: NORTHRN BLVD CR82 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 23.141, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 58.2m (190.9ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 11.8m (38.7ft), Out-to-Out Width: 12.8m (42.0ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Satisfactory, Inventory Rating: 64.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.97m (19.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $1,646,000, Roadway Improvement Cost: $979,000, Total Project Cost: $2,625,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 1072592, Location: 1.5 MI E JCT I81 & I481 (Lat: 43.136781, Lng: -76.082883), Route carried "on" structure: Interstate 481, Year Built: 1986, Status: Open, Structure Length: 5.97m (19.59ft), Average Daily Traffic: 31,952 (year 2007), Truck Traffic: 20%, Average Future Daily Traffic: 44,733 (year 2027), Design Load: HS 20, Features Intersected: NORTHRN BLVD CR82 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 23.141, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 58.2m (190.9ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 11.8m (38.7ft), Out-to-Out Width: 12.8m (42.0ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Good, Inventory Rating: 64.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.97m (19.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $1,646,000, Roadway Improvement Cost: $979,000, Total Project Cost: $2,625,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 1072781, Location: 1 MI E.INTERSEC.81I&481I (Lat: 43.138364, Lng: -76.090783), Route carried "on" structure: Interstate 481, Year Built: 1986, Status: Open, Structure Length: 3.35m (10.99ft), Average Daily Traffic: 15,976 (year 2007), Truck Traffic: 20%, Average Future Daily Traffic: 22,366 (year 2027), Design Load: HS 20, Features Intersected: TOTMAN ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 23.154, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.8m (38.7ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 32.9m (107.9ft), Curb-To-Curb Width: 12.0m (39.4ft), Out-to-Out Width: 13.3m (43.6ft) Condition: Deck: Very good, Superstructure: Good, Substructure: Very good, Operating Rating: 59.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.35m (10.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $1,646,000, Roadway Improvement Cost: $979,000, Total Project Cost: $2,625,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 1072782, Location: 1 MI E.INTERSEC.81I&481I (Lat: 43.138056, Lng: -76.090767), Route carried "on" structure: Interstate 481, Year Built: 1986, Status: Open, Structure Length: 3.20m (10.50ft), Average Daily Traffic: 15,976 (year 2007), Truck Traffic: 20%, Average Future Daily Traffic: 22,366 (year 2027), Design Load: HS 20, Features Intersected: TOTMAN ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 23.154, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 31.3m (102.7ft), Curb-To-Curb Width: 12.1m (39.7ft), Out-to-Out Width: 13.5m (44.3ft) Condition: Deck: Very good, Superstructure: Good, Substructure: Very good, Operating Rating: 58.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.20m (10.50ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $1,646,000, Roadway Improvement Cost: $979,000, Total Project Cost: $2,625,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 1072791, Location: 0.6MI.E.INTERSEC.81I&481I (Lat: 43.140553, Lng: -76.101839), Route carried "on" structure: Interstate 481, Year Built: 1986, Status: Open, Structure Length: 3.13m (10.27ft), Average Daily Traffic: 31,952 (year 2007), Truck Traffic: 20%, Average Future Daily Traffic: 44,733 (year 2027), Design Load: HS 20, Features Intersected: THOMPSON RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 23.154, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 30.7m (100.7ft), Curb-To-Curb Width: 12.0m (39.4ft), Out-to-Out Width: 13.0m (42.7ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Very good, Operating Rating: 87.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 51.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.13m (10.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $1,646,000, Roadway Improvement Cost: $979,000, Total Project Cost: $2,625,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 1072792, Location: 0.6MI.E.INTERSEC.81I&481I (Lat: 43.140436, Lng: -76.101761), Route carried "on" structure: Interstate 481, Year Built: 1986, Status: Open, Structure Length: 3.13m (10.27ft), Average Daily Traffic: 31,952 (year 2007), Truck Traffic: 20%, Average Future Daily Traffic: 44,733 (year 2027), Design Load: HS 20, Features Intersected: THOMPSON RD CR10 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 23.154, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 30.7m (100.7ft), Curb-To-Curb Width: 12.0m (39.4ft), Out-to-Out Width: 13.4m (44.0ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Very good, Operating Rating: 86.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 51.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.13m (10.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $1,646,000, Roadway Improvement Cost: $979,000, Total Project Cost: $2,625,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 22684, Location: 0.25 MI E JCT SH481 & US (Lat: 43.148294, Lng: -76.121656), Route carried "on" structure: City street , Year Built: 1976, Status: Open, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 7,285 (year 2003), Truck Traffic: 5%, Average Future Daily Traffic: 10,199 (year 2023), Features Intersected: DARLENE'S BROOK, Facility Carried by Structure: EAST CIRCLE RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Owner: Town or Township Highway Agency, Approaching Roadway Width: 20.4m (66.9ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 2.1m (6.9ft) Condition: Channel: Fair, Culverts: Fair, Operating Rating: 73.9 metric tons, Inventory Rating: 29.3 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.85m (2.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $386,000, Roadway Improvement Cost: $230,000, Total Project Cost: $616,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 320796, Location: 1.7MI NW JCT298<31 TUTTLE (Lat: 43.173794, Lng: -75.993028), Route carried "on" structure: City street , Year Built: 1954, Status: Open, Structure Length: 1.15m (3.77ft), Average Daily Traffic: 566 (year 2000), Truck Traffic: 5%, Average Future Daily Traffic: 792 (year 2020), Features Intersected: TUTTLE BROOK, Facility Carried by Structure: TUTTLE ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.4m (21.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.3m (33.8ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 7.4m (24.3ft), Out-to-Out Width: 7.9m (25.9ft) Condition: Deck: Good, Superstructure: Fair, Substructure: Good, Channel: Good, Operating Rating: 41.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 1.15m (3.77ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $199,000, Roadway Improvement Cost: $118,000, Total Project Cost: $317,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 33128, Location: 1.7 MI E OF CICERO CENTER (Lat: 43.175403, Lng: -76.009025), Route carried "on" structure: County highway , Year Built: 1965, Year Reconstructed: 1999, Status: Open, Structure Length: 0.79m (2.59ft), Average Daily Traffic: 1,514 (year 1999), Truck Traffic: 4%, Average Future Daily Traffic: 2,120 (year 2019), Features Intersected: MAPLE CREEK, Facility Carried by Structure: LAKESHORE ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 10.3m (33.8ft), Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.3m (24.0ft), Curb-To-Curb Width: 10.3m (33.8ft), Out-to-Out Width: 10.9m (35.8ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Channel: Good, Operating Rating: 98.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 59.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.79m (2.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $187,000, Roadway Improvement Cost: $111,000, Total Project Cost: $298,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 400854, Location: JCT RTE 11 + ONEIDA LAKE (Lat: 43.240314, Lng: -76.140628), Route carried "on" structure: US 11, Year Built: 1932, Year Reconstructed: 1968, Status: Open, Structure Length: 11.82m (38.78ft), Average Daily Traffic: 8,716 (year 2005), Truck Traffic: 4%, Average Future Daily Traffic: 12,202 (year 2025), Design Load: H 20, Features Intersected: ONEIDA RIVER Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 0.264, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 63.0m (206.7ft)), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 2, Length of Maximum Span: 63.3m (207.7ft), Curb or Sidewalk Widths: Left: 1.6m (5.2ft), Right: 1.6m (5.2ft), Curb-To-Curb Width: 12.1m (39.7ft), Out-to-Out Width: 13.2m (43.3ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Channel: Good, Operating Rating: 53.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 31.8 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 11.82m (38.78ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: September 2007, Critical Feature Inspection Date: September 2007, Underwater Inspection Date: June 2007, Bridge Improvement Cost: $3,383,000, Roadway Improvement Cost: $1,963,000, Total Project Cost: $5,346,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete Find on map >>
Structure Number: 1021961, Location: JCT OF RTS I-81 SB + 31 (Lat: 43.175597, Lng: -76.116094), Route carried "under" structure: State highway 31, Year Built: 1959, Structure Length: 4.96m (16.27ft), Average Daily Traffic: 26,185 (year 2006), Truck Traffic: 5%, Features Intersected: RTE 31, Facility Carried by Structure: RTE I81 Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 41.786, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 23.1m (75.8ft) Find on map >>
Structure Number: 1021962, Location: JCT OF RTS I-81 NB + 31 (Lat: 43.175603, Lng: -76.115761), Route carried "under" structure: State highway 31, Year Built: 1959, Structure Length: 4.96m (16.27ft), Average Daily Traffic: 10,257 (year 2006), Truck Traffic: 5%, Features Intersected: RTE 31, Facility Carried by Structure: RTE I81 Minimum Vertical Clearance: 4.54m (14.90ft), Kilometerpoint: 41.818, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 23.1m (75.8ft) Find on map >>
Structure Number: 103169, Location: 1.6 MI NE JCT RTS I-81+11 (Lat: 43.123906, Lng: -76.124208), Route carried "under" structure: Interstate 81, Year Built: 1959, Structure Length: 9.84m (32.28ft), Average Daily Traffic: 58,151 (year 2006), Truck Traffic: 20%, Features Intersected: RTE I81, Facility Carried by Structure: TAFT ROAD Minimum Vertical Clearance: 4.44m (14.57ft), Kilometerpoint: 6.661, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.8m (87.9ft) Find on map >>
Structure Number: 1031711, Location: JCT OF RTS 481 SB & I-81 (Lat: 43.141467, Lng: -76.112644), Route carried "under" structure: Interstate 81, Year Built: 1986, Structure Length: 8.26m (27.10ft), Average Daily Traffic: 54,311 (year 2000), Truck Traffic: 20%, Features Intersected: RTE I81 Minimum Vertical Clearance: 5.07m (16.63ft), Kilometerpoint: 0.893, Lanes on structure: 3, Lanes under structure: 8, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 40.8m (133.9ft) Find on map >>
Structure Number: 1031712, Location: JCT OF RTS 481 NB & I-81 (Lat: 43.141586, Lng: -76.112419), Route carried "under" structure: Interstate 81, Year Built: 1986, Structure Length: 8.26m (27.10ft), Average Daily Traffic: 54,311 (year 2000), Truck Traffic: 20%, Features Intersected: RTE I81 Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 8.946, Lanes on structure: 3, Lanes under structure: 8, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 40.8m (133.9ft) Find on map >>
Structure Number: 103172, Location: .6 MI N JCT I81 & SH 481 (Lat: 43.149694, Lng: -76.109997), Route carried "under" structure: Interstate 81, Year Built: 1959, Structure Length: 9.90m (32.48ft), Average Daily Traffic: 51,238 (year 2007), Truck Traffic: 20%, Features Intersected: RTE I81, Facility Carried by Structure: SOUTH BAY RD Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 9.928, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.4m (99.7ft) Find on map >>
Structure Number: 103173, Location: 3 MI N JCT I81 & SH 31 (Lat: 43.217114, Lng: -76.129675), Route carried "under" structure: Interstate 81, Year Built: 1996, Structure Length: 7.92m (25.98ft), Average Daily Traffic: 45,000 (year 2005), Truck Traffic: 20%, Features Intersected: RTE I81, Facility Carried by Structure: MUD MILL ROAD Minimum Vertical Clearance: 5.07m (16.63ft), Kilometerpoint: 17.635, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.3m (128.9ft) Find on map >>
Structure Number: 103174, Location: EXIT 31 OF I81 (Lat: 43.231750, Lng: -76.128917), Route carried "under" structure: Interstate 81, Year Built: 1959, Structure Length: 7.71m (25.30ft), Average Daily Traffic: 45,000 (year 2005), Truck Traffic: 20%, Features Intersected: RTE I81, Facility Carried by Structure: BARTELL ROAD Minimum Vertical Clearance: 4.87m (15.98ft), Kilometerpoint: 19.244, Lanes on structure: 2, Lanes under structure: 7, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 23.7m (77.8ft) Find on map >>
Structure Number: 1061701, Location: JCT OF SH 481 SB & US 11 (Lat: 43.147800, Lng: -76.126061), Route carried "under" structure: US 11, Year Built: 1972, Structure Length: 3.96m (12.99ft), Average Daily Traffic: 13,291 (year 2006), Truck Traffic: 6%, Features Intersected: RTE 11, Facility Carried by Structure: RTE 481 Minimum Vertical Clearance: 4.69m (15.39ft), Kilometerpoint: 7.932, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.7m (123.7ft) Find on map >>
Structure Number: 1061702, Location: JCT OF SH 481 NB & US 11 (Lat: 43.147911, Lng: -76.125878), Route carried "under" structure: US 11, Year Built: 1972, Structure Length: 3.96m (12.99ft), Average Daily Traffic: 13,291 (year 2006), Truck Traffic: 6%, Features Intersected: RTE 11, Facility Carried by Structure: RTE 481 Minimum Vertical Clearance: 4.59m (15.06ft), Kilometerpoint: 7.948, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.7m (123.7ft) Find on map >>
Structure Number: 1072591, Location: 1.5 MI E JCT I81 & I481 (Lat: 43.136942, Lng: -76.082986), Route carried "under" structure: County highway , Year Built: 1986, Structure Length: 5.97m (19.59ft), Average Daily Traffic: 1,000 (year 2007), Truck Traffic: 5%, Features Intersected: NORTHRN BLVD CR82, Facility Carried by Structure: RTE I481 Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 58.2m (190.9ft) Find on map >>
Structure Number: 1072592, Location: 1.5 MI E JCT I81 & I481 (Lat: 43.136781, Lng: -76.082883), Route carried "under" structure: County highway , Year Built: 1986, Structure Length: 5.97m (19.59ft), Average Daily Traffic: 1,000 (year 2007), Truck Traffic: 5%, Features Intersected: NORTHRN BLVD CR82, Facility Carried by Structure: RTE I481 Minimum Vertical Clearance: 4.92m (16.14ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 58.2m (190.9ft) Find on map >>
Structure Number: 1072791, Location: 0.6MI.E.INTERSEC.81I&481I (Lat: 43.140553, Lng: -76.101839), Route carried "under" structure: County highway , Year Built: 1986, Structure Length: 3.13m (10.27ft), Average Daily Traffic: 600 (year 2007), Truck Traffic: 4%, Features Intersected: THOMPSON RD, Facility Carried by Structure: RTE I481 Minimum Vertical Clearance: 5.02m (16.47ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.7m (100.7ft) Find on map >>
Structure Number: 1072792, Location: 0.6MI.E.INTERSEC.81I&481I (Lat: 43.140436, Lng: -76.101761), Route carried "under" structure: County highway , Year Built: 1986, Structure Length: 3.13m (10.27ft), Average Daily Traffic: 600 (year 2007), Truck Traffic: 4%, Features Intersected: THOMPSON RD CR10, Facility Carried by Structure: RTE I481 Minimum Vertical Clearance: 4.47m (14.67ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.7m (100.7ft) Discuss this city on our hugely popular New York forum Back to: Cicero, NY, New York, All US cities.
|
![]() |