![]() |
Bridge Statistics for Claymont, Delaware (DE) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Claymont, DE, Delaware, Delaware forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 16 Total length: 137 meters (449ft) Total costs: $5,100,000 Total average daily traffic: 483,281 Total average daily truck traffic: 62,591 National Bridge Inventory (NBI) Registered Bridges for Claymont
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Bridge Condition - Culverts Find on map >>
Structure Number: 1788 059, Location: CLAYMONT (Lat: 39.803603, Lng: -75.469675), Route carried "on" structure: Interstate 95, Year Built: 1966, Status: Open, Structure Length: 1.38m (4.53ft), Average Daily Traffic: 58,211 (year 2004), Truck Traffic: 13%, Average Future Daily Traffic: 64,311 (year 2015), Design Load: HS 20, Features Intersected: SO.BRANCH NAAMANS CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 18.300, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 39.0m (128.0ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 4.4m (14.4ft) Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 89.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: March 2006, Bridge Improvement Cost: $800,000, Roadway Improvement Cost: $200,000, Total Project Cost: $1,000,000 ( Estimate for 2005) Find on map >>
Structure Number: 1792 06, Location: N. OF CLAYMONT (Lat: 39.813056, Lng: -75.455556), Route carried "on" structure: Interstate 495, Year Built: 1966, Status: Open, Structure Length: 11.03m (36.19ft), Average Daily Traffic: 34,334 (year 2003), Truck Traffic: 15%, Average Future Daily Traffic: 49,293 (year 2017), Design Load: HS 20+Mod, Features Intersected: I 95 & RAMP 6202 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 18.200, Lanes on structure: 2, Lanes under structure: 6, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 4 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 31.4m (103.0ft), Curb-To-Curb Width: 11.4m (37.4ft), Out-to-Out Width: 12.8m (42.0ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 50.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: March 2006, Bridge Improvement Cost: $800,000, Roadway Improvement Cost: $200,000, Total Project Cost: $1,000,000 ( Estimate for 2005), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 1795 017, Location: NORTH OF CLAYMONT (Lat: 39.815792, Lng: -75.454503), Route carried "on" structure: State highway 92, Year Built: 1966, Status: Open, Structure Length: 4.51m (14.80ft), Average Daily Traffic: 21,878 (year 2004), Truck Traffic: 9%, Average Future Daily Traffic: 15,093 (year 2017), Design Load: HS 20, Features Intersected: I 495 SOUTHBOUND Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 7.854, Lanes on structure: 5, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.8m (51.8ft), Skew: 32 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 19.8m (65.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 19.5m (64.0ft), Out-to-Out Width: 24.4m (80.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 52.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: March 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 1797 6202, Location: WEST OF CLAYMONT (Lat: 39.813333, Lng: -75.404167), Route carried "on" structure: Ramp Interstate 6202, Year Built: 1966, Status: Open, Structure Length: 5.36m (17.59ft), Average Daily Traffic: 1,121 (year 2005), Truck Traffic: 9%, Design Load: HS 20, Features Intersected: I 495 NB Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.241, Lanes on structure: 1, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 17.1m (56.1ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 7.6m (24.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 52.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 29.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2006, Bridge Improvement Cost: $800,000, Roadway Improvement Cost: $200,000, Total Project Cost: $1,000,000 ( Estimate for 2005), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1799 06, Location: CLAYMONT (Lat: 39.809142, Lng: -75.453475), Route carried "on" structure: Interstate 495, Year Built: 1966, Year Reconstructed: 1972, Status: Open, Structure Length: 1.01m (3.31ft), Average Daily Traffic: 69,904 (year 2004), Truck Traffic: 13%, Average Future Daily Traffic: 14,622 (year 2015), Design Load: HS 20, Features Intersected: SO.BRANCH-NAAMANS CREEK, Facility Carried by Structure: VIETNAM MEM HGWY Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 17.860, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 24.4m (80.1ft), Skew: 20 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 4.9m (16.1ft) Condition: Channel: Fair, Culverts: Good, Operating Rating: 51.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 30.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: March 2006, Bridge Improvement Cost: $800,000, Roadway Improvement Cost: $200,000, Total Project Cost: $1,000,000 ( Estimate for 2005) Find on map >>
Structure Number: 1829, Location: CLAYMONT (Lat: 39.801672, Lng: -75.451397), Route carried "on" structure: City street , Year Built: 1972, Status: Open, Structure Length: 11.16m (36.61ft), Average Daily Traffic: 100 (year 2004), Truck Traffic: 8%, Average Future Daily Traffic: 180 (year 2010), Design Load: HS 20, Features Intersected: I495/VIETNAM VET MEM HGY, Facility Carried by Structure: MYRTLE AVE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.390, Lanes on structure: 2, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Skew: 3 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Number Of Approach Spans: 2, Length of Maximum Span: 32.6m (107.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.0m, Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 10.9m (35.8ft) Condition: Deck: Good, Superstructure: Fair, Substructure: Fair, Operating Rating: 66.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.62m (25.00ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2006, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,100,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place Find on map >>
Structure Number: 1013P, Location: CLAYMONT KNOLLWOOD (Lat: 39.807044, Lng: -75.452603), Route carried "under" structure: Interstate 495, Year Built: 1975, Structure Length: 13.41m (44.00ft), Average Daily Traffic: 69,904 (year 2004), Truck Traffic: 13%, Features Intersected: I 495, Facility Carried by Structure: PEDESTRIAN BR. Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 1.764, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 64.0m (210.0ft) Find on map >>
Structure Number: 1013P, Location: CLAYMONT KNOLLWOOD (Lat: 39.807044, Lng: -75.452603), Route carried "under" structure: Ramp Interstate 495, Year Built: 1975, Structure Length: 13.41m (44.00ft), Average Daily Traffic: 520 (year 2004), Truck Traffic: 13%, Features Intersected: I 495, Facility Carried by Structure: PEDESTRIAN BR. Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 0.000, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 64.0m (210.0ft) Find on map >>
Structure Number: 1013P, Location: CLAYMONT KNOLLWOOD (Lat: 39.807044, Lng: -75.452603), Route carried "under" structure: Ramp Interstate 495, Year Built: 1975, Structure Length: 13.41m (44.00ft), Average Daily Traffic: 320 (year 2004), Truck Traffic: 13%, Features Intersected: I 495, Facility Carried by Structure: PEDESTRIAN BR. Minimum Vertical Clearance: 5.97m (19.59ft), Kilometerpoint: 0.161, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 64.0m (210.0ft) Find on map >>
Structure Number: 1056A, Location: NAAMANS (Lat: 39.810000, Lng: -75.440000), Route carried "under" structure: US 13, Year Built: 1900, Structure Length: 3.60m (11.81ft), Average Daily Traffic: 5,811 (year 1997), Truck Traffic: 5%, Features Intersected: US 13, Facility Carried by Structure: NORFOLK SOUTHERN Minimum Vertical Clearance: 4.27m (14.01ft), Kilometerpoint: 1.308, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 17.7m (58.1ft) Find on map >>
Structure Number: 1056B, Location: NAAMANS (Lat: 39.807664, Lng: -75.448197), Route carried "under" structure: US 13, Year Built: 1919, Structure Length: 16.01m (52.53ft), Average Daily Traffic: 11,230 (year 1997), Truck Traffic: 5%, Features Intersected: PHILADELPHIA PIKE, Facility Carried by Structure: CITISTEEL RR BRIDG Minimum Vertical Clearance: 0.47m (1.54ft), Kilometerpoint: 1.236, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 16.9m (55.4ft) Find on map >>
Structure Number: 1792 06, Location: N. OF CLAYMONT (Lat: 39.813056, Lng: -75.455556), Route carried "under" structure: Interstate 95, Year Built: 1966, Structure Length: 11.03m (36.19ft), Average Daily Traffic: 68,668 (year 2003), Truck Traffic: 15%, Features Intersected: I 95 & RAMP 6202 Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 1.981, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.4m (103.0ft) Find on map >>
Structure Number: 1792 06, Location: N. OF CLAYMONT (Lat: 39.813056, Lng: -75.455556), Route carried "under" structure: Interstate 95, Year Built: 1966, Structure Length: 11.03m (36.19ft), Average Daily Traffic: 1,121 (year 2004), Truck Traffic: 13%, Features Intersected: I 95 & RAMP 6202 Minimum Vertical Clearance: 4.75m (15.58ft), Kilometerpoint: 0.161, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.4m (103.0ft) Find on map >>
Structure Number: 1795 017, Location: NORTH OF CLAYMONT (Lat: 39.815792, Lng: -75.454503), Route carried "under" structure: Interstate 495, Year Built: 1966, Structure Length: 4.51m (14.80ft), Average Daily Traffic: 56,708 (year 2004), Truck Traffic: 13%, Features Intersected: I 495 SOUTHBOUND, Facility Carried by Structure: NAAMANS RD/SR92 Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 1.891, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 19.8m (65.0ft) Find on map >>
Structure Number: 1797 6202, Location: WEST OF CLAYMONT (Lat: 39.813333, Lng: -75.404167), Route carried "under" structure: Interstate 495, Year Built: 1966, Structure Length: 5.36m (17.59ft), Average Daily Traffic: 34,592 (year 2004), Truck Traffic: 13%, Features Intersected: I 495 NB, Facility Carried by Structure: RAMP 6202 Minimum Vertical Clearance: 0.53m (1.74ft), Kilometerpoint: 1.828, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 17.1m (56.1ft) Find on map >>
Structure Number: 1829, Location: CLAYMONT (Lat: 39.801672, Lng: -75.451397), Route carried "under" structure: Interstate 495, Year Built: 1972, Structure Length: 11.16m (36.61ft), Average Daily Traffic: 48,859 (year 2004), Truck Traffic: 13%, Features Intersected: I495/VIETNAM VET MEM HGY, Facility Carried by Structure: MYRTLE AVE Minimum Vertical Clearance: 5.09m (16.70ft), Kilometerpoint: 1.685, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.6m (107.0ft) Discuss this city on our hugely popular Delaware forum Back to: Claymont, DE, Delaware, All US cities.
|
![]() |