Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Clearfield, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 18Number of bridges
  • 505ft / 154mTotal length
  • $19,629,000Total costs
  • 114,748Total average daily traffic
  • 28,444Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Clearfield
  • No street view available for this location

New bridges in Clearfield, PA - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 21930-1939
  • 11940-1949
  • 31960-1969
  • 51970-1979
  • 62000-2009
Reconstructed bridges in Clearfield, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 21980-1989
  • 11990-1999
  • 12000-2009
Average Bridge Daily Traffic in Clearfield, PA
Average Bridge Truck Traffic in Clearfield, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 61.5%Good
  • 7.7%Satisfactory
  • 15.4%Fair
  • 7.7%Serious
  • 7.7%Failed
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 15.4%Very good
  • 38.5%Good
  • 15.4%Satisfactory
  • 23.1%Fair
  • 7.7%Failed
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 23.1%Very good
  • 38.5%Good
  • 15.4%Satisfactory
  • 7.7%Fair
  • 15.4%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Very good
  • 12.5%Good
  • 12.5%Satisfactory
  • 12.5%Fair
  • 12.5%Poor
Find on map >>   Show street view

Structure Number: 11302,  Location: .5 MI E EXIT 120 (Lat: 41.038006,  Lng: -78.388903),  Route carried "on" structure: Interstate 80,  Year Built: 1967,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 32.46m (106.50ft),  Average Daily Traffic: 11,344 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 16,827 (year 2041),  Design Load: HL 93,  Features Intersected: W BR SUSQUEHANNA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.222,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 48.8m (160.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 32.90m (107.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 11304,  Location: .5 MI E EXIT 120 (Lat: 41.038206,  Lng: -78.388772),  Route carried "on" structure: Interstate 80,  Year Built: 1967,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 32.43m (106.40ft),  Average Daily Traffic: 11,077 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 17,258 (year 2041),  Design Load: HL 93,  Features Intersected: W BR SUSQUEHANNA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.351,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 47.5m (155.8ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 32.40m (106.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $562,000,  Roadway Improvement Cost: $1,656,000,  Total Project Cost: $7,589,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 11476,  Location: CLEARFIELD BORO (Lat: 41.026806,  Lng: -78.438736),  Route carried "on" structure: US 322,  Year Built: 1947,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 9.91m (32.51ft),  Average Daily Traffic: 7,227 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 14,579 (year 2041),  Design Load: HS 20,  Features Intersected: W BR SUSQUEHANNA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.199,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 2.6m (8.5ft),  Right: 2.6m (8.5ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.90m (32.48ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Underwater Inspection Date: September 2019,  Bridge Improvement Cost: $436,000,  Roadway Improvement Cost: $1,284,000,  Total Project Cost: $5,886,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 11479,  Location: CLEARFIELD (Lat: 41.017825,  Lng: -78.407489),  Route carried "on" structure: US 322,  Year Built: 1937,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 13.01m (42.68ft),  Average Daily Traffic: 8,106 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,227 (year 2041),  Design Load: H 20,  Features Intersected: CLEARFIELD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.099,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 32.0m (105.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.00m (42.65ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Critical Feature Inspection Date: April 2021,  Underwater Inspection Date: October 2018,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $735,000,  Total Project Cost: $3,369,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11563,  Location: CLEARFIELD BORO (Lat: 41.009500,  Lng: -78.433528),  Route carried "on" structure: State highway 879,  Year Built: 1975,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 14,502 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,146 (year 2041),  Design Load: HS 20,  Features Intersected: SR 153-PA 153
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.049,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.7m (94.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 26.5m (86.9ft),  Out-to-Out Width: 27.7m (90.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $43,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $582,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 11644,  Location: CLEARFIELD BORO (Lat: 41.022081,  Lng: -78.441728),  Route carried "on" structure: State highway ,  Year Built: 1938,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 9.81m (32.19ft),  Average Daily Traffic: 3,410 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,644 (year 2041),  Design Load: H 20,  Features Intersected: W BR SUSQUEHANNA RIVER,  Facility Carried by Structure: SR 1004
Minimum Vertical Clearance: 4.71m (15.45ft),  Kilometerpoint: 0.027,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 48.8m (160.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.90m (35.76ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Critical Feature Inspection Date: April 2021,  Underwater Inspection Date: September 2019,  Other Special Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 11729,  Location: DIMELING (Lat: 40.971517,  Lng: -78.406597),  Route carried "on" structure: State highway ,  Year Built: 1966,  Status: Open,  Structure Length: 7.44m (24.41ft),  Average Daily Traffic: 657 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 494 (year 2040),  Design Load: HS 20,  Features Intersected: CLEARFIELD CREEK,  Facility Carried by Structure: SR 2024
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.356,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Serious,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.40m (24.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $78,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $1,052,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 11939,  Location: LEONARDSTEXTBEHINDPADOTOF (Lat: 41.023497,  Lng: -78.407300),  Route carried "on" structure: ServiceCity street ,  Year Built: 1902,  Status: Closed,  Structure Length: 2.74m (8.99ft),  Design Load: HS 20,  Features Intersected: RJ CORMAN RR,  Facility Carried by Structure: LEONARD ST EXT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Aluminum, Iron,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 3.9m (12.8ft),  Out-to-Out Width: 4.2m (13.8ft)

Condition: Deck: Failed,  Superstructure: Failed,  Substructure: Poor,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $85,000,  Roadway Improvement Cost: $264,000,  Total Project Cost: $1,151,000,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 42457,  Location: EXIT 120 CLEARFIELD INTER (Lat: 41.039497,  Lng: -78.398128),  Route carried "on" structure: Interstate 80,  Year Built: 2004,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 11,077 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 17,258 (year 2041),  Design Load: HL 93,  Features Intersected: SR 879-PA 879
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.527,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.6m (97.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 98.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 42464,  Location: .8 MI EAST OF EXIT 120 (Lat: 41.037342,  Lng: -78.385283),  Route carried "on" structure: Interstate 80,  Year Built: 2004,  Status: Open,  Structure Length: 4.60m (15.09ft),  Average Daily Traffic: 11,077 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 17,258 (year 2041),  Design Load: HL 93,  Features Intersected: R J CORMAN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.351,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 43.9m (144.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 92.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.50m (18.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 43017,  Location: .8 MI EAST OF EXIT 120 (Lat: 41.037186,  Lng: -78.385603),  Route carried "on" structure: Interstate 80,  Year Built: 2005,  Status: Open,  Structure Length: 4.60m (15.09ft),  Average Daily Traffic: 11,344 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 16,827 (year 2041),  Design Load: HL 93,  Features Intersected: R J CORMAN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.222,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 43.9m (144.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.50m (18.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 44221,  Location: 3 MI SE OF CLEARFIELD (Lat: 40.986200,  Lng: -78.406075),  Route carried "on" structure: State highway 153,  Year Built: 2007,  Status: Open,  Structure Length: 10.49m (34.42ft),  Average Daily Traffic: 2,877 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,744 (year 2040),  Design Load: HL 93,  Features Intersected: CLEARFIELD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.628,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 35.1m (115.2ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 44945,  Location: 2.5 MI NE CLEARFIELD (Lat: 41.048400,  Lng: -78.382994),  Route carried "on" structure: State highway 879,  Year Built: 2009,  Status: Open,  Structure Length: 19.51m (64.01ft),  Average Daily Traffic: 5,152 (year 2022),  Truck Traffic: 15%,  Average Future Daily Traffic: 2,840 (year 2041),  Design Load: HL 93,  Features Intersected: LICK RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.148,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 39.0m (128.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 15.4m (50.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 11563,  Location: CLEARFIELD BORO (Lat: 41.009500,  Lng: -78.433528),  Route carried "under" structure: Spur State highway 153,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 3,611 (year 2022),  Truck Traffic: 5%,  Features Intersected: SR 153-PA 153,  Facility Carried by Structure: SR 879-PA 879
Minimum Vertical Clearance: 4.41m (14.47ft),  Kilometerpoint: 35.349,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 11564,  Location: CLEARFIELD (Lat: 41.017486,  Lng: -78.428047),  Route carried "under" structure: City street ,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 907 (year 1999),  Truck Traffic: 5%,  Features Intersected: TOWNSHIP ROAD 991,  Facility Carried by Structure: SR 879-PA 879
Minimum Vertical Clearance: 8.28m (27.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 11566,  Location: CLEARFIELD (Lat: 41.023333,  Lng: -78.380000),  Route carried "under" structure: US 322,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 3,614 (year 2022),  Truck Traffic: 5%,  Features Intersected: SR 322-US 322,  Facility Carried by Structure: SR 879-PA 879
Minimum Vertical Clearance: 5.25m (17.22ft),  Kilometerpoint: 33.235,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.7m (127.0ft)

Find on map >>   Show street view

Structure Number: 11566,  Location: CLEARFIELD (Lat: 41.023333,  Lng: -78.380000),  Route carried "under" structure: US 322,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 3,614 (year 2022),  Truck Traffic: 5%,  Features Intersected: SR 322-US 322,  Facility Carried by Structure: SR 879-PA 879
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 33.235,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.7m (127.0ft)

Find on map >>   Show street view

Structure Number: 42457,  Location: EXIT 120 CLEARFIELD INTER (Lat: 41.039497,  Lng: -78.398128),  Route carried "under" structure: State highway 879,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 5,152 (year 2022),  Truck Traffic: 15%,  Features Intersected: SR 879-PA 879,  Facility Carried by Structure: SR 80-I 80
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 22.690,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 29.6m (97.1ft)

Discuss Clearfield, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.