National Bridge Inventory (NBI) Statistics
Number of bridges: 12
Total length: 104 meters (341ft)
Total costs: $21,256,000
Total average daily traffic: 110,196
Total average daily truck traffic: 4,769
National Bridge Inventory (NBI) Registered Bridges for Clinton

New bridges - Historical Statistics

  • 1920-1929: 2
  • 1930-1939: 1
  • 1940-1949: 4
  • 1950-1959: 0
  • 1960-1969: 0
  • 1970-1979: 0
  • 1980-1989: 2
  • 1990-1999: 1
  • 2000-2009: 2

Reconstructed bridges - Historical Statistics

  • 1950-1959: 1
  • 1960-1969: 0
  • 1970-1979: 0
  • 1980-1989: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 10A1940001,  Location: 1.8 M E OF US25W-SR61 JCT (Lat: 36.080433,  Lng: -84.110217),  Route carried "on" structure: County highway 516,  Year Built: 1940,  Status: Posted for load,  Structure Length: 1.02m (3.35ft),  Average Daily Traffic: 300 (year 2008),  Truck Traffic: 1%,  Average Future Daily Traffic: 480 (year 2028),  Features Intersected: LITTLE DISMAL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Serious,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 4.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 2.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.69m (5.54ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2007,  Other Special Inspection Date: September 2007,  Bridge Improvement Cost: $205,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $308,000 ( Estimate for 2008),  Deck Structure Type: Steel plate,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 10A2100001,  Location: .5 M NE OF US25W-SR61 JCT (Lat: 36.098217,  Lng: -84.127033),  Route carried "on" structure: City street 521,  Year Built: 1990,  Status: Open,  Structure Length: 7.25m (23.79ft),  Average Daily Traffic: 2,336 (year 2008),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,738 (year 2028),  Design Load: HS 20,  Features Intersected: SOUTHERN RAILWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.789,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 35.7m (117.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.25m (23.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,001,000,  Roadway Improvement Cost: $101,000,  Total Project Cost: $1,502,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 10B2350001,  Location: 1.5 M NW OF SR61-SR95 JCT (Lat: 36.156483,  Lng: -84.084267),  Route carried "on" structure: City street 235,  Year Built: 2001,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 1,230 (year 2008),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,968 (year 2028),  Design Load: HS 20,  Features Intersected: BUFFALO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.724,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.8m (107.6ft),  Curb-To-Curb Width: 13.6m (44.6ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 10B2350003,  Location: 1.5 M NW OF SR61-SR95 JCT (Lat: 36.151967,  Lng: -84.081017),  Route carried "on" structure: City street 235,  Year Built: 2001,  Status: Open,  Structure Length: 5.50m (18.04ft),  Average Daily Traffic: 1,230 (year 2008),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,968 (year 2028),  Design Load: HS 20,  Features Intersected: HINDS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.320,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 13.6m (44.6ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1SR0090011,  Location: 1 MI.S.CLINTON CITY LIMIT (Lat: 36.106483,  Lng: -84.131367),  Route carried "on" structure: US 25,  Year Built: 1927,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 10,150 (year 2007),  Truck Traffic: 3%,  Average Future Daily Traffic: 17,040 (year 2028),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: FAS 9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.884,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 6 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.41m (7.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $485,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $728,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 1SR0090015,  Location: 0.38 MI.S. JCT.FAS 2572 (Lat: 36.093917,  Lng: -84.130767),  Route carried "on" structure: US 25,  Year Built: 1940,  Year Reconstructed: 1959,  Status: Open,  Structure Length: 29.97m (98.33ft),  Average Daily Traffic: 20,220 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 32,352 (year 2028),  Design Load: H 15,  Features Intersected: CLINCH RIVER,  Facility Carried by Structure: FAP 9
Minimum Vertical Clearance: 7.63m (25.03ft),  Kilometerpoint: 17.236,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.8m (48.6ft),  Navigation Control: Yes ( Vertical Clearance: 13.7m (44.9ft), Horizontal Clearance: 64.6m (211.9ft)),  Material/Design: Steel continuous,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 13,  Length of Maximum Span: 68.5m (224.7ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 35.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 29.97m (98.33ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2007,  Critical Feature Inspection Date: April 2007,  Underwater Inspection Date: August 2005,  Bridge Improvement Cost: $11,704,000,  Roadway Improvement Cost: $1,171,000,  Total Project Cost: $17,557,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 1SR0090017,  Location: 0.42 MI.S.CLAXTON (Lat: 36.042433,  Lng: -84.105933),  Route carried "on" structure: US 25,  Year Built: 1940,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 17,760 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 30,464 (year 2028),  Design Load: H 15,  Features Intersected: NELSON CREEK,  Facility Carried by Structure: FAP 9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.961,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.48m (8.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $565,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $848,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 1SR0610013,  Location: IN CLINTON CITY LIMITS (Lat: 36.087567,  Lng: -84.151367),  Route carried "on" structure: State highway 61,  Year Built: 1946,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 18,580 (year 2007),  Truck Traffic: 3%,  Average Future Daily Traffic: 30,848 (year 2028),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.434,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $208,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $313,000 ( Estimate for 2008)
Find on map >>

Structure Number: 1SR0610027,  Location: IN CLINTON-E OFF US 25W (Lat: 36.103133,  Lng: -84.129283),  Route carried "on" structure: State highway 61,  Year Built: 1987,  Status: Open,  Structure Length: 10.73m (35.20ft),  Average Daily Traffic: 26,290 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 42,688 (year 2028),  Design Load: HS 20,  Features Intersected: CSX RR & FAU 4074
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.235,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.7m (51.5ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 41.5m (136.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 17.3m (56.8ft),  Out-to-Out Width: 21.0m (68.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 51.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Critical Feature Inspection Date: January 2007,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1SR0090013,  Location: NEAR CLINTON TENN. (Lat: 36.105400,  Lng: -84.131567),  Route carried "under" structure: US 25,  Year Built: 1927,  Structure Length: 1.69m (5.54ft),  Average Daily Traffic: 10,150 (year 2007),  Truck Traffic: 5%,  Features Intersected: SOUTHERN RAILWAY,  Facility Carried by Structure: SOU RWY 731003N
Minimum Vertical Clearance: 4.15m (13.62ft),  Kilometerpoint: 15.997,  Lanes under structure: 2,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>

Structure Number: 1SR0090015,  Location: LOCATED IN CLINTON (Lat: 36.093917,  Lng: -84.130767),  Route carried "under" structure: State highway 517,  Year Built: 1939,  Structure Length: 29.97m (98.33ft),  Average Daily Traffic: 200 (year 2008),  Truck Traffic: 2%,  Features Intersected: SR 9,  Facility Carried by Structure: FAP 9
Minimum Vertical Clearance: 7.63m (25.03ft),  Kilometerpoint: 0.257,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Truss - Thru,  Length of Maximum Span: 68.5m (224.7ft)

Find on map >>

Structure Number: 1SR0610027,  Location: IN CLINTON-E OFF US 25W (Lat: 36.103133,  Lng: -84.129283),  Route carried "under" structure: City street 4074,  Year Built: 1987,  Structure Length: 10.73m (35.20ft),  Average Daily Traffic: 1,750 (year 2007),  Truck Traffic: 5%,  Features Intersected: SR 61,  Facility Carried by Structure: FAP 61
Minimum Vertical Clearance: 7.63m (25.03ft),  Kilometerpoint: 0.029,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.5m (136.2ft)

Discuss this city on our hugely popular Tennessee forum

Back to: Clinton, TN, Tennessee, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.