National Bridge Inventory (NBI) Statistics
Number of bridges: 39
Total length: 572 meters (1,877ft)
Total costs: $3,706,000
Total average daily traffic: 709,226
Total average daily truck traffic: 71,136
National Bridge Inventory (NBI) Registered Bridges for Cocoa

New bridges - Historical Statistics

  • 1950-1959: 1
  • 1960-1969: 13
  • 1970-1979: 13
  • 1980-1989: 0
  • 1990-1999: 9
  • 2000-2009: 3

Reconstructed bridges - Historical Statistics

  • 1960-1969: 1
  • 1970-1979: 0
  • 1980-1989: 0
  • 1990-1999: 5

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 700015,  Location: SR-528 WB - CR-515 (Lat: 28.401667,  Lng: -80.745000),  Route carried "on" structure: State highway 528,  Year Built: 1963,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 14.22m (46.65ft),  Average Daily Traffic: 26,500 (year 2006),  Truck Traffic: 7%,  Average Future Daily Traffic: 45,978 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: CR-515
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.316,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.2m (36.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.70m (28.54ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Underwater Inspection Date: October 2007,  Bridge Improvement Cost: $87,000,  Total Project Cost: $203,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 700052,  Location: I-95 SB - SR-520 (Lat: 28.360000,  Lng: -80.795000),  Route carried "on" structure: Interstate 9,  Year Built: 1965,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 6.56m (21.52ft),  Average Daily Traffic: 37,250 (year 2006),  Truck Traffic: 18%,  Average Future Daily Traffic: 64,629 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: SR-520
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 66.727,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 700061,  Location: SR 520 WB Indian River (Lat: 28.355833,  Lng: -80.718611),  Route carried "on" structure: State highway 520,  Year Built: 1966,  Status: Open,  Structure Length: 70.84m (232.41ft),  Average Daily Traffic: 26,500 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 45,978 (year 2028),  Design Load: HS 20,  Features Intersected: Indian River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Navigation Control: Yes ( Vertical Clearance: 19.8m (65.0ft), Horizontal Clearance: 27.4m (89.9ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 22,  Length of Maximum Span: 42.7m (140.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Underwater Inspection Date: March 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 700087,  Location: SR-528 WB over Pine St. (Lat: 28.416111,  Lng: -80.830556),  Route carried "on" structure: Other road 528,  Year Built: 1973,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 17,500 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 30,363 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: Pine Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.954,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 14.5m (47.6ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 63.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 700089,  Location: SR-528 WB-Clear Lake Rd. (Lat: 28.400000,  Lng: -80.771667),  Route carried "on" structure: Other road 528,  Year Built: 1973,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 14,000 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 24,290 (year 2028),  Design Load: HS 20,  Features Intersected: SR-524
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.263,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 700108,  Location: SR-528 EB - US-1& FECRR (Lat: 28.400417,  Lng: -80.752944),  Route carried "on" structure: State highway 528,  Year Built: 1970,  Status: Open,  Structure Length: 9.83m (32.25ft),  Average Daily Traffic: 19,250 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 33,399 (year 2028),  Design Load: HS 20,  Features Intersected: US-1 & FECRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.665,  Lanes on structure: 3,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 700109,  Location: SR-528 EB over CR-515 (Lat: 28.401278,  Lng: -80.745778),  Route carried "on" structure: State highway 528,  Year Built: 1970,  Status: Open,  Structure Length: 14.69m (48.20ft),  Average Daily Traffic: 26,500 (year 2006),  Truck Traffic: 7%,  Average Future Daily Traffic: 45,978 (year 2028),  Design Load: HS 20,  Features Intersected: CR-515
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.316,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.0m (32.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Underwater Inspection Date: October 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 700127,  Location: I-95 NB - SR-520 (Lat: 28.360000,  Lng: -80.795000),  Route carried "on" structure: Interstate 9,  Year Built: 1965,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 6.56m (21.52ft),  Average Daily Traffic: 37,250 (year 2006),  Truck Traffic: 18%,  Average Future Daily Traffic: 64,629 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: SR-520
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 66.727,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 700129,  Location: Citrus Blvd - I-95 (Lat: 28.425000,  Lng: -80.816667),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 3,940 (year 2005),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,836 (year 2027),  Design Load: H 20,  Features Intersected: I-95,  Facility Carried by Structure: Citrus Blvd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.902,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.5m (24.6ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.1m (69.2ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 67.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.46m (21.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $64,000,  Total Project Cost: $281,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 700137,  Location: SR 520 EB Indian River (Lat: 28.355833,  Lng: -80.721667),  Route carried "on" structure: State highway 520,  Year Built: 1969,  Status: Open,  Structure Length: 70.84m (232.41ft),  Average Daily Traffic: 27,000 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 46,845 (year 2028),  Design Load: HS 20,  Features Intersected: Indian River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.112,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Navigation Control: Yes ( Vertical Clearance: 19.8m (65.0ft), Horizontal Clearance: 27.4m (89.9ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 22,  Length of Maximum Span: 51.8m (169.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 65.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 70.84m (232.41ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Underwater Inspection Date: March 2006,  Bridge Improvement Cost: $1,163,000,  Total Project Cost: $1,611,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 700151,  Location: SR-528 EB over Pine St. (Lat: 28.416111,  Lng: -80.830556),  Route carried "on" structure: Other road 528,  Year Built: 1973,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 17,500 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 30,363 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: Pine Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.954,  Lanes on structure: 3,  Lanes under structure: 2,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.5m (47.6ft),  Curb-To-Curb Width: 14.7m (48.2ft),  Out-to-Out Width: 15.6m (51.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 72.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 700153,  Location: SR-528 EB-Clear Lake Rd. (Lat: 28.400000,  Lng: -80.771667),  Route carried "on" structure: Other road 528,  Year Built: 1973,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 14,000 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 24,290 (year 2028),  Design Load: HS 20,  Features Intersected: SR-524
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.263,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 70017,  Location: 0.5 mile E. of US-1 (Lat: 28.355003,  Lng: -80.723333),  Route carried "on" structure: State highway 520,  Year Built: 1966,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 26,500 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 45,978 (year 2028),  Design Load: HS 20,  Features Intersected: Indian River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.189,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 13.8m (45.3ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 64.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2006,  Underwater Inspection Date: March 2006
Find on map >>

Structure Number: 700171,  Location: 0.5 Mile East of U.S 1 (Lat: 28.355556,  Lng: -80.723333),  Route carried "on" structure: State highway 520,  Year Built: 1957,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 27,000 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 46,845 (year 2028),  Design Load: HS 20,  Features Intersected: Indian River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.891,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.0m (42.7ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 62.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $12,000,  Total Project Cost: $1,611,000
Find on map >>

Structure Number: 700197,  Location: SR-528 WB over I-95 (Lat: 28.411833,  Lng: -80.823444),  Route carried "on" structure: Other road 528,  Year Built: 1997,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 17,500 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 30,363 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: I-95
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.535,  Lanes on structure: 3,  Lanes under structure: 8,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 14.8m (48.6ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 37.6m (123.4ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 79.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 700198,  Location: SR-528 EB over I-95 (Lat: 28.411833,  Lng: -80.823444),  Route carried "on" structure: Other road 528,  Year Built: 1997,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 17,500 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 30,363 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: I-95
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.535,  Lanes on structure: 3,  Lanes under structure: 8,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 14.8m (48.6ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 37.6m (123.4ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 79.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 7002,  Location: SR-520-St Johns River (Lat: 28.368333,  Lng: -80.871667),  Route carried "on" structure: State highway 520,  Year Built: 1999,  Status: Open,  Structure Length: 10.80m (35.43ft),  Average Daily Traffic: 4,800 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 8,328 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: St. Johns River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.0m (42.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 85.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Underwater Inspection Date: June 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 700217,  Location: SR-520 EB-St. Johns River (Lat: 28.370833,  Lng: -80.878056),  Route carried "on" structure: State highway 520,  Year Built: 2006,  Status: Open,  Structure Length: 10.80m (35.43ft),  Average Daily Traffic: 4,800 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 8,328 (year 2028),  Design Load: HS 20,  Features Intersected: St. Johns River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.4m (70.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 73.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Underwater Inspection Date: June 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 700219,  Location: SR-520 WB - Banana River (Lat: 28.356789,  Lng: -80.643578),  Route carried "on" structure: State highway 520,  Year Built: 2006,  Status: Open,  Structure Length: 24.99m (81.99ft),  Average Daily Traffic: 32,000 (year 2006),  Truck Traffic: 3%,  Average Future Daily Traffic: 53,120 (year 2028),  Design Load: HS 20,  Features Intersected: Banana River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.199,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Navigation Control: Yes ( Vertical Clearance: 11.2m (36.7ft), Horizontal Clearance: 18.3m (60.0ft)),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 39.6m (129.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 72.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Underwater Inspection Date: December 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 70022,  Location: SR-520 EB over Banana Riv (Lat: 28.356667,  Lng: -80.643333),  Route carried "on" structure: State highway 520,  Year Built: 2006,  Status: Open,  Structure Length: 24.99m (81.99ft),  Average Daily Traffic: 16,250 (year 2006),  Truck Traffic: 3%,  Average Future Daily Traffic: 28,194 (year 2028),  Design Load: HS 20,  Features Intersected: Banana River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.199,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Navigation Control: Yes ( Vertical Clearance: 11.2m (36.7ft), Horizontal Clearance: 18.3m (60.0ft)),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 39.6m (129.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 0.0m,  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 20.8m (68.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Underwater Inspection Date: October 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 7051,  Location: .1MI E of Riveredge Blvd (Lat: 28.355000,  Lng: -80.723611),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 1,000 (year 2002),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,000 (year 2024),  Design Load: HS 20,  Features Intersected: Indian River,  Facility Carried by Structure: Harrison Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 39.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Underwater Inspection Date: September 2006
Find on map >>

Structure Number: 700015,  Location: SR-528 WB - CR-515 (Lat: 28.401667,  Lng: -80.745000),  Route carried "under" structure: County highway ,  Year Built: 1963,  Structure Length: 14.22m (46.65ft),  Average Daily Traffic: 1,700 (year 2000),  Truck Traffic: 1%,  Features Intersected: CR-515,  Facility Carried by Structure: SR-528
Minimum Vertical Clearance: 4.36m (14.30ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>

Structure Number: 700052,  Location: I-95 SB - SR-520 (Lat: 28.360000,  Lng: -80.795000),  Route carried "under" structure: State highway 520,  Year Built: 1965,  Structure Length: 6.56m (21.52ft),  Average Daily Traffic: 12,800 (year 2006),  Truck Traffic: 9%,  Features Intersected: SR-520,  Facility Carried by Structure: I-95
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 7.838,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>

Structure Number: 700061,  Location: SR 520 WB Indian River (Lat: 28.355833,  Lng: -80.718611),  Route carried "under" structure: Other road ,  Year Built: 1966,  Structure Length: 70.84m (232.41ft),  Average Daily Traffic: 25 (year 1998),  Features Intersected: Indian River,  Facility Carried by Structure: SR-520
Minimum Vertical Clearance: 4.36m (14.30ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>

Structure Number: 700087,  Location: SR-528 WB over Pine St. (Lat: 28.416111,  Lng: -80.830556),  Route carried "under" structure: County highway ,  Year Built: 1973,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 2,218 (year 2002),  Truck Traffic: 9%,  Features Intersected: Pine Street,  Facility Carried by Structure: SR-528
Minimum Vertical Clearance: 4.66m (15.29ft),  Kilometerpoint: 0.843,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.6m (47.9ft)

Find on map >>

Structure Number: 700089,  Location: SR-528 WB-Clear Lake Rd. (Lat: 28.400000,  Lng: -80.771667),  Route carried "under" structure: State highway 524,  Year Built: 1973,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 20,500 (year 2006),  Truck Traffic: 8%,  Features Intersected: SR-524,  Facility Carried by Structure: SR-528
Minimum Vertical Clearance: 4.66m (15.29ft),  Kilometerpoint: 0.309,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>

Structure Number: 700108,  Location: SR-528 EB - US-1& FECRR (Lat: 28.400417,  Lng: -80.752944),  Route carried "under" structure: US 5,  Year Built: 1970,  Structure Length: 9.83m (32.25ft),  Average Daily Traffic: 36,000 (year 2006),  Truck Traffic: 5%,  Features Intersected: US-1 & FECRR
Minimum Vertical Clearance: 0.68m (2.23ft),  Kilometerpoint: 39.229,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>

Structure Number: 700109,  Location: SR-528 EB over CR-515 (Lat: 28.401278,  Lng: -80.745778),  Route carried "under" structure: County highway ,  Year Built: 1970,  Structure Length: 14.69m (48.20ft),  Average Daily Traffic: 1,700 (year 2000),  Truck Traffic: 1%,  Features Intersected: CR-515,  Facility Carried by Structure: SR-528
Minimum Vertical Clearance: 4.36m (14.30ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>

Structure Number: 700127,  Location: I-95 NB - SR-520 (Lat: 28.360000,  Lng: -80.795000),  Route carried "under" structure: State highway 520,  Year Built: 1965,  Structure Length: 6.56m (21.52ft),  Average Daily Traffic: 22,500 (year 2006),  Truck Traffic: 8%,  Features Intersected: SR-520,  Facility Carried by Structure: I-95
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 7.862,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>

Structure Number: 700129,  Location: Citrus Blvd - I-95 (Lat: 28.425000,  Lng: -80.816667),  Route carried "under" structure: Interstate 9,  Year Built: 1965,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 47,500 (year 2006),  Truck Traffic: 18%,  Features Intersected: I-95,  Facility Carried by Structure: Citrus Blvd
Minimum Vertical Clearance: 4.69m (15.39ft),  Kilometerpoint: 2.902,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.1m (69.2ft)

Find on map >>

Structure Number: 700137,  Location: SR 520 EB Indian River (Lat: 28.355833,  Lng: -80.721667),  Route carried "under" structure: Other road ,  Year Built: 1969,  Structure Length: 70.84m (232.41ft),  Average Daily Traffic: 25 (year 2002),  Features Intersected: Indian River,  Facility Carried by Structure: SR-520
Minimum Vertical Clearance: 4.36m (14.30ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 51.8m (169.9ft)

Find on map >>

Structure Number: 700151,  Location: SR-528 EB over Pine St. (Lat: 28.416111,  Lng: -80.830556),  Route carried "under" structure: County highway ,  Year Built: 1973,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 2,218 (year 2002),  Truck Traffic: 9%,  Features Intersected: Pine Street,  Facility Carried by Structure: SR-528
Minimum Vertical Clearance: 4.66m (15.29ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.5m (47.6ft)

Find on map >>

Structure Number: 700153,  Location: SR-528 EB-Clear Lake Rd. (Lat: 28.400000,  Lng: -80.771667),  Route carried "under" structure: State highway 524,  Year Built: 1973,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 20,500 (year 2006),  Truck Traffic: 8%,  Features Intersected: SR-524,  Facility Carried by Structure: SR-528
Minimum Vertical Clearance: 4.66m (15.29ft),  Kilometerpoint: 0.285,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>

Structure Number: 700197,  Location: SR-528 WB over I-95 (Lat: 28.411833,  Lng: -80.823444),  Route carried "under" structure: Interstate 9,  Year Built: 1997,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 47,500 (year 2006),  Truck Traffic: 18%,  Features Intersected: I-95,  Facility Carried by Structure: SR-528
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 0.518,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.6m (123.4ft)

Find on map >>

Structure Number: 700197,  Location: SR-528 WB over I-95 (Lat: 28.411833,  Lng: -80.823444),  Route carried "under" structure: Ramp Interstate 9,  Year Built: 1997,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 8,000 (year 2002),  Truck Traffic: 5%,  Features Intersected: I-95,  Facility Carried by Structure: SR-528
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 0.531,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.6m (123.4ft)

Find on map >>

Structure Number: 700197,  Location: SR-528 WB over I-95 (Lat: 28.411833,  Lng: -80.823444),  Route carried "under" structure: Ramp Interstate 9,  Year Built: 1997,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 8,000 (year 2002),  Truck Traffic: 5%,  Features Intersected: I-95,  Facility Carried by Structure: SR-528
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 0.518,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.6m (123.4ft)

Find on map >>

Structure Number: 700198,  Location: SR-528 EB over I-95 (Lat: 28.411833,  Lng: -80.823444),  Route carried "under" structure: Interstate 9,  Year Built: 1997,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 47,500 (year 2006),  Truck Traffic: 18%,  Features Intersected: I-95,  Facility Carried by Structure: SR-528
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 0.544,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.6m (123.4ft)

Find on map >>

Structure Number: 700198,  Location: SR-528 EB over I-95 (Lat: 28.411833,  Lng: -80.823444),  Route carried "under" structure: Ramp Interstate 9,  Year Built: 1997,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 8,000 (year 2002),  Truck Traffic: 5%,  Features Intersected: I-95,  Facility Carried by Structure: SR-528
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 0.531,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.6m (123.4ft)

Find on map >>

Structure Number: 700198,  Location: SR-528 EB over I-95 (Lat: 28.411833,  Lng: -80.823444),  Route carried "under" structure: Ramp Interstate 9,  Year Built: 1997,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 8,000 (year 2002),  Truck Traffic: 5%,  Features Intersected: I-95,  Facility Carried by Structure: SR-528
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 0.518,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.6m (123.4ft)

Discuss this city on our hugely popular Florida forum

Back to: Cocoa, FL, Florida, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.