National Bridge Inventory (NBI) Statistics
Number of bridges: 27
Total length: 63 meters (207ft)
Total costs: $32,768,000
Total average daily traffic: 64,614
Total average daily truck traffic: 6,250
National Bridge Inventory (NBI) Registered Bridges for Concord

New bridges - Historical Statistics

  • 1920-1929: 1
  • 1930-1939: 3
  • 1940-1949: 0
  • 1950-1959: 2
  • 1960-1969: 3
  • 1970-1979: 2
  • 1980-1989: 9
  • 1990-1999: 5
  • 2000-2010: 2

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 10245,  Location: 1.1 MI W JCT RTS 39 + 219 (Lat: 42.508119,  Lng: -78.706450),  Route carried "on" structure: State highway 39,  Year Built: 1970,  Status: Open,  Structure Length: 1.09m (3.58ft),  Average Daily Traffic: 4,988 (year 2007),  Truck Traffic: 11%,  Average Future Daily Traffic: 5,759 (year 2027),  Design Load: HS 20,  Features Intersected: SPOONER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.291,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.5m (14.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft)

Condition: Channel: Very good,  Culverts: Fair,  Operating Rating: 75.8 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2008,  Bridge Improvement Cost: $381,000,  Roadway Improvement Cost: $227,000,  Total Project Cost: $608,000 ( Estimate for 2009),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 10416,  Location: 5.8 MI N JCT US219 & SH39 (Lat: 42.579272,  Lng: -78.695094),  Route carried "on" structure: County highway ,  Year Built: 1999,  Status: Open,  Structure Length: 1.15m (3.77ft),  Average Daily Traffic: 1,377 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,702 (year 2027),  Design Load: HS 25,  Features Intersected: EIGHTEEN MILE CRK,  Facility Carried by Structure: SPRVLLE-BOSTON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.3m (33.8ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.2m (36.7ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 18.2m (59.7ft)

Condition: Superstructure: Excellent,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2009,  Bridge Improvement Cost: $524,000,  Roadway Improvement Cost: $313,000,  Total Project Cost: $837,000 ( Estimate for 2009),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 104161,  Location: 6.7 MI N JCT US219 & SH39 (Lat: 42.589961,  Lng: -78.704106),  Route carried "on" structure: County highway ,  Year Built: 1989,  Status: Open,  Structure Length: 1.15m (3.77ft),  Average Daily Traffic: 630 (year 1998),  Truck Traffic: 8%,  Average Future Daily Traffic: 779 (year 2018),  Design Load: HS 20,  Features Intersected: EIGHTEEN MILE CRK,  Facility Carried by Structure: SPRINGN'LE-BOSTON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Superstructure: Very good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 79.9 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2008,  Bridge Improvement Cost: $331,000,  Roadway Improvement Cost: $198,000,  Total Project Cost: $529,000 ( Estimate for 2009),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 1071071,  Location: 7.4MI N JCT.RTES 219 & 39 (Lat: 42.604425,  Lng: -78.752069),  Route carried "on" structure: US 219,  Year Built: 1981,  Status: Open,  Structure Length: 2.98m (9.78ft),  Average Daily Traffic: 6,205 (year 2007),  Truck Traffic: 11%,  Average Future Daily Traffic: 8,637 (year 2027),  Design Load: HS 20,  Features Intersected: BROWN HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.558,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.9m (94.8ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.98m (9.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2009,  Bridge Improvement Cost: $2,543,000,  Roadway Improvement Cost: $1,480,000,  Total Project Cost: $4,023,000 ( Estimate for 2009),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1071072,  Location: 2.4 MI NE OF NEW OREGON (Lat: 42.604264,  Lng: -78.752919),  Route carried "on" structure: US 219,  Year Built: 1981,  Status: Open,  Structure Length: 2.98m (9.78ft),  Average Daily Traffic: 6,205 (year 2007),  Truck Traffic: 11%,  Average Future Daily Traffic: 8,637 (year 2027),  Design Load: HS 20,  Features Intersected: BROWN HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.558,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.9m (94.8ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.98m (9.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2009,  Bridge Improvement Cost: $2,543,000,  Roadway Improvement Cost: $1,480,000,  Total Project Cost: $4,023,000 ( Estimate for 2009),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1071081,  Location: 6.3MI N JCT RTES 219 & 39 (Lat: 42.591492,  Lng: -78.737178),  Route carried "on" structure: US 219,  Year Built: 1981,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 6,205 (year 2007),  Truck Traffic: 11%,  Average Future Daily Traffic: 8,637 (year 2027),  Design Load: HS 20,  Features Intersected: TREVETT RD CR420
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.558,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2009,  Bridge Improvement Cost: $2,543,000,  Roadway Improvement Cost: $1,480,000,  Total Project Cost: $4,023,000 ( Estimate for 2009),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1071082,  Location: 6.3MI N JCT RTES 219 & 39 (Lat: 42.590628,  Lng: -78.737836),  Route carried "on" structure: US 219,  Year Built: 1981,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 6,205 (year 2007),  Truck Traffic: 11%,  Average Future Daily Traffic: 8,637 (year 2027),  Design Load: HS 20,  Features Intersected: TREVETT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.558,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Good,  Inventory Rating: 67.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2009,  Bridge Improvement Cost: $2,543,000,  Roadway Improvement Cost: $1,480,000,  Total Project Cost: $4,023,000 ( Estimate for 2009),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 107109,  Location: 3.1 MI N JCT SH39 &S EXPY (Lat: 42.553042,  Lng: -78.711150),  Route carried "on" structure: Alternate County highway ,  Year Built: 1981,  Status: Open,  Structure Length: 9.63m (31.59ft),  Average Daily Traffic: 6,750 (year 1986),  Truck Traffic: 8%,  Average Future Daily Traffic: 8,342 (year 2006),  Design Load: HS 20,  Features Intersected: RTE 219,  Facility Carried by Structure: GENESEE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 37.4m (122.7ft),  Curb-To-Curb Width: 19.2m (63.0ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.63m (31.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2009,  Bridge Improvement Cost: $2,543,000,  Roadway Improvement Cost: $1,480,000,  Total Project Cost: $4,023,000 ( Estimate for 2009),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 226082,  Location: .9 MI N OF EAST CONCORD (Lat: 42.564242,  Lng: -78.636525),  Route carried "on" structure: City street ,  Year Built: 2002,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 20 (year 2009),  Truck Traffic: 6%,  Average Future Daily Traffic: 25 ,  Design Load: HS 25,  Features Intersected: GRAFF BROOK,  Facility Carried by Structure: ROSS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 74.9 metric tons,  Inventory Rating: 40.8 metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2008,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $89,000,  Total Project Cost: $239,000 ( Estimate for 2009),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 304247,  Location: 4.4 MI N JCT SH240 & SH39 (Lat: 42.568981,  Lng: -78.641406),  Route carried "on" structure: State highway 240,  Year Built: 1966,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 2,038 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,519 (year 2027),  Features Intersected: GRAFF BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.294,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Poor,  Culverts: Good,  Operating Rating: 74.0 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2008,  Bridge Improvement Cost: $203,000,  Roadway Improvement Cost: $121,000,  Total Project Cost: $324,000 ( Estimate for 2009),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 304248,  Location: 5.4 MI N JCT SH240 & SH39 (Lat: 42.574558,  Lng: -78.642264),  Route carried "on" structure: State highway 240,  Year Built: 2002,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 2,038 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,519 (year 2027),  Features Intersected: SPENCER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.293,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 11.8m (38.7ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2008,  Bridge Improvement Cost: $264,000,  Roadway Improvement Cost: $158,000,  Total Project Cost: $422,000 ( Estimate for 2009),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 304249,  Location: 6.3 MI N JCT SH240 & SH39 (Lat: 42.594733,  Lng: -78.650050),  Route carried "on" structure: State highway 240,  Year Built: 1966,  Status: Open,  Structure Length: 1.15m (3.77ft),  Average Daily Traffic: 2,308 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,852 (year 2027),  Features Intersected: SPRAGUE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.396,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Serious,  Culverts: Fair,  Operating Rating: 74.5 metric tons,  Inventory Rating: 29.3 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2009,  Bridge Improvement Cost: $297,000,  Roadway Improvement Cost: $177,000,  Total Project Cost: $474,000 ( Estimate for 2009),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 332836,  Location: 3.2 MI SW OF SPRINGVILLE (Lat: 42.473894,  Lng: -78.744597),  Route carried "on" structure: Other road ,  Year Built: 1939,  Status: Posted for load,  Structure Length: 7.49m (24.57ft),  Average Daily Traffic: 879 (year 1999),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,095 (year 2019),  Features Intersected: CATTARAUGUS CREEK,  Facility Carried by Structure: HAMMOND HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.5m (119.8ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 7.49m (24.57ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: August 2009,  Critical Feature Inspection Date: August 2009,  Bridge Improvement Cost: $1,313,000,  Roadway Improvement Cost: $783,000,  Total Project Cost: $2,096,000 ( Estimate for 2009),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 332837,  Location: 2 MI SOUTH OF SPRINGVILLE (Lat: 42.480317,  Lng: -78.683161),  Route carried "on" structure: County highway ,  Year Built: 1936,  Year Reconstructed: 1978,  Status: Posted for load,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 666 (year 2009),  Truck Traffic: 6%,  Average Future Daily Traffic: 830 (year 2029),  Features Intersected: CATTARAUGUS CREEK,  Facility Carried by Structure: MILL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 4.72m (15.49ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2009,  Critical Feature Inspection Date: September 2009,  Underwater Inspection Date: July 2008,  Bridge Improvement Cost: $945,000,  Roadway Improvement Cost: $564,000,  Total Project Cost: $1,509,000 ( Estimate for 2009),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 332843,  Location: 2.8 MI SE OF MORTON CORS (Lat: 42.487961,  Lng: -78.721314),  Route carried "on" structure: County highway ,  Year Built: 1956,  Status: Posted for load-capacity,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 477 (year 2009),  Truck Traffic: 6%,  Average Future Daily Traffic: 596 (year 2029),  Design Load: H 20,  Features Intersected: SPOONER CREEK,  Facility Carried by Structure: ZOAR VALLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.8m (61.7ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2008,  Bridge Improvement Cost: $534,000,  Roadway Improvement Cost: $319,000,  Total Project Cost: $853,000 ( Estimate for 2009),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 332844,  Location: .8 MILE N OF SPRINGVILLE (Lat: 42.527469,  Lng: -78.662944),  Route carried "on" structure: County highway ,  Year Built: 1929,  Status: Posted for load-capacity,  Structure Length: 1.15m (3.77ft),  Average Daily Traffic: 1,179 (year 2009),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,469 (year 2029),  Features Intersected: SPRING BROOK,  Facility Carried by Structure: SHARP STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.4m (17.7ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2008,  Bridge Improvement Cost: $572,000,  Roadway Improvement Cost: $382,000,  Total Project Cost: $954,000 ( Estimate for 2009),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 332852,  Location: 1.5 MI N OF SPRINGVILLE (Lat: 42.530686,  Lng: -78.666969),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 1.15m (3.77ft),  Average Daily Traffic: 922 (year 2001),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,149 (year 2021),  Design Load: HS 20,  Features Intersected: SPRING BROOK,  Facility Carried by Structure: MIDDLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.7m (18.7ft)

Condition: Channel: Fair,  Culverts: Very good,  Operating Rating: 76.7 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2008,  Bridge Improvement Cost: $262,000,  Roadway Improvement Cost: $156,000,  Total Project Cost: $418,000 ( Estimate for 2009),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 332855,  Location: 2.1 MI N OF EAST CONCORD (Lat: 42.582289,  Lng: -78.644100),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Open,  Structure Length: 1.88m (6.17ft),  Average Daily Traffic: 122 (year 2009),  Truck Traffic: 6%,  Average Future Daily Traffic: 152 (year 2029),  Features Intersected: BR CAZENOVIA CRK,  Facility Carried by Structure: MORSE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.6m (57.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Inventory Rating: 70.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2008,  Critical Feature Inspection Date: June 2008,  Bridge Improvement Cost: $262,000,  Roadway Improvement Cost: $156,000,  Total Project Cost: $418,000 ( Estimate for 2009),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 332858,  Location: 2.6 MI S OF MORTON CORS (Lat: 42.474750,  Lng: -78.749511),  Route carried "on" structure: County highway ,  Year Built: 1955,  Status: Posted for load-capacity,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 512 (year 1998),  Truck Traffic: 6%,  Average Future Daily Traffic: 640 (year 2018),  Features Intersected: DERBY BROOK,  Facility Carried by Structure: ZOAR VALLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 74.5 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2008,  Bridge Improvement Cost: $159,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $254,000 ( Estimate for 2009),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 332863,  Location: .4 MILE NW OF FOWLERVILLE (Lat: 42.605872,  Lng: -78.722347),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 1.73m (5.68ft),  Average Daily Traffic: 158 (year 2009),  Truck Traffic: 6%,  Average Future Daily Traffic: 197 (year 2029),  Design Load: HS 20,  Features Intersected: EIGHTEEN MILE CRK,  Facility Carried by Structure: FOWLERVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2008,  Bridge Improvement Cost: $367,000,  Roadway Improvement Cost: $219,000,  Total Project Cost: $586,000 ( Estimate for 2009),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 336736,  Location: 2.2 MI SE OF GLENWOOD (Lat: 42.589422,  Lng: -78.641931),  Route carried "on" structure: Other road ,  Year Built: 1968,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 53 (year 1996),  Truck Traffic: 6%,  Average Future Daily Traffic: 66 (year 2016),  Features Intersected: SPRAGUE BROOK,  Facility Carried by Structure: SPRAGUE BRK PK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.1m (16.7ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.6m (11.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 74.1 metric tons,  Inventory Rating: 19.5 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2008,  Bridge Improvement Cost: $328,000,  Roadway Improvement Cost: $196,000,  Total Project Cost: $524,000 ( Estimate for 2009),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 336737,  Location: 2.3 MILES SE OF WYANDALE (Lat: 42.534733,  Lng: -78.731383),  Route carried "on" structure: County highway ,  Year Built: 1931,  Status: Posted for load-capacity,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 56 (year 2009),  Truck Traffic: 6%,  Average Future Daily Traffic: 70 (year 2029),  Features Intersected: SPOONER CREEK,  Facility Carried by Structure: CONCORD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.8m (15.7ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2008,  Bridge Improvement Cost: $328,000,  Roadway Improvement Cost: $196,000,  Total Project Cost: $524,000 ( Estimate for 2009),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 336739,  Location: 2 MILES NE OF SPRINGVILLE (Lat: 42.536011,  Lng: -78.675081),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 2,931 (year 1998),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,622 (year 2018),  Design Load: HS 20,  Features Intersected: SPRING BROOK,  Facility Carried by Structure: SPRINGV-BOSTON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.9m (12.8ft)

Condition: Channel: Fair,  Culverts: Excellent,  Operating Rating: 75.4 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2008,  Bridge Improvement Cost: $199,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $318,000 ( Estimate for 2009),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 336759,  Location: IN WYANDALE (Lat: 42.555161,  Lng: -78.765594),  Route carried "on" structure: County highway ,  Year Built: 1987,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,136 (year 1999),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,404 (year 2019),  Design Load: HS 20,  Features Intersected: TRB 18 MILE CREEK,  Facility Carried by Structure: GENESEE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Fair,  Culverts: Poor,  Operating Rating: 75.5 metric tons,  Inventory Rating: 19.5 metric tons,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2009,  Bridge Improvement Cost: $187,000,  Roadway Improvement Cost: $112,000,  Total Project Cost: $299,000 ( Estimate for 2009),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 336781,  Location: CO RD 391 & ADAMS ROAD (Lat: 42.536239,  Lng: -78.676742),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 84 (year 1998),  Truck Traffic: 6%,  Average Future Daily Traffic: 105 (year 2018),  Design Load: HS 20,  Features Intersected: SPRING BROOK,  Facility Carried by Structure: CR 416 / ADAMS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft),  Curb-To-Curb Width: 8.5m (27.9ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 74.9 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2008,  Bridge Improvement Cost: $138,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $220,000 ( Estimate for 2009),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 336811,  Location: .2 MI N JCT CR 49 & CR 50 (Lat: 42.560953,  Lng: -78.765367),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 260 (year 1998),  Truck Traffic: 6%,  Average Future Daily Traffic: 324 (year 2018),  Design Load: HS 20,  Features Intersected: SB EIGHTEEN MI CK,  Facility Carried by Structure: WYANDALE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft),  Curb-To-Curb Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Channel: Good,  Culverts: Good,  Operating Rating: 74.9 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2009,  Bridge Improvement Cost: $155,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $247,000 ( Estimate for 2009),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 107109,  Location: 3.1 MI N JCT SH39 &S EXPY (Lat: 42.553042,  Lng: -78.711150),  Route carried "under" structure: US 219,  Year Built: 1981,  Structure Length: 9.63m (31.59ft),  Average Daily Traffic: 10,210 (year 2009),  Truck Traffic: 11%,  Features Intersected: RTE 219,  Facility Carried by Structure: GENESEE ROAD
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 9.461,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.4m (122.7ft)

Jump to a detailed profile or search site with Google Custom Search
Business Search - 14 Million verified businesses
Search for: near: 

Discuss this city on our hugely popular New York forum

Back to: Concord, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.