Bridge Statistics for Conklin, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 220ft / 67.3mTotal length
  • $25,903,000Total costs
  • 31,094Total average daily traffic
  • 2,533Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Conklin
  • No street view available for this location

New bridges in Conklin, NY - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 81960-1969
  • 41970-1979
  • 21980-1989
Reconstructed bridges in Conklin, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11990-1999
  • 12000-2009
Average Bridge Daily Traffic in Conklin, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.1%Very good
  • 44.4%Good
  • 33.3%Satisfactory
  • 11.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Very good
  • 55.6%Good
  • 33.3%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 44.4%Good
  • 55.6%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.7%Very good
  • 30.8%Good
  • 30.8%Satisfactory
  • 30.8%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 80.0%Good
  • 20.0%Fair
Find on map >>   Show street view

Structure Number: 100356,  Location: 0.2 MI NW JCT RTS 7A + 7 (Lat: 42.017056,  Lng: -75.791286),  Route carried "on" structure: State highway 7,  Year Built: 1968,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 3,080 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,810 (year 2040),  Design Load: HS 15,  Features Intersected: CONKLIN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.237,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $189,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $300,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 100358,  Location: 2.1 MI NW JCT SH 7 & SH7A (Lat: 42.041464,  Lng: -75.806803),  Route carried "on" structure: State highway 7,  Year Built: 1968,  Status: Open,  Structure Length: 10.64m (34.91ft),  Average Daily Traffic: 3,350 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,069 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: NORFOLK SOUTHERN RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.294,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.5m (119.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.63m (34.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,540,000,  Roadway Improvement Cost: $1,487,000,  Total Project Cost: $4,027,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 100435,  Location: 0.1 MI SE JCT SH 7 + SH 7 (Lat: 42.015236,  Lng: -75.788778),  Route carried "on" structure: State highway 7A,  Year Built: 1968,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 1,390 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,719 (year 2040),  Design Load: HS 15,  Features Intersected: SNAKE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.767,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.45m (14.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,192,000,  Roadway Improvement Cost: $698,000,  Total Project Cost: $1,890,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 105439,  Location: 1.1 MI NW JCT RTS 7 + 7A (Lat: 42.027633,  Lng: -75.801844),  Route carried "on" structure: State highway 7,  Year Built: 1968,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 3,080 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,810 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: LITTLE SNAKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.701,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.89m (9.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,036,000,  Roadway Improvement Cost: $606,000,  Total Project Cost: $1,642,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 222549,  Location: 1 MI NW OF CORBETTSVILLE (Lat: 42.030469,  Lng: -75.808567),  Route carried "on" structure: Other road ,  Year Built: 1974,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 189 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 265 (year 2038),  Design Load: H 20,  Features Intersected: LITTLE SNAKE CREEK,  Facility Carried by Structure: FALLBROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.829,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.0m (55.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.85m (6.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $622,000,  Roadway Improvement Cost: $364,000,  Total Project Cost: $986,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 225761,  Location: HAMLET OF CORBETTSVILLE (Lat: 42.016639,  Lng: -75.792094),  Route carried "on" structure: Other road ,  Year Built: 1973,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 254 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 356 (year 2036),  Features Intersected: TRIB SUSQUEHANNA,  Facility Carried by Structure: CORBETTSVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.257,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $308,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $488,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226669,  Location: .2 MI W OF CORBETTSVILLE (Lat: 42.014567,  Lng: -75.795664),  Route carried "on" structure: Other road ,  Year Built: 1974,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 233 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 326 (year 2039),  Design Load: HS 20,  Features Intersected: TRIB SUSQUEHANNA RIVER,  Facility Carried by Structure: BANTA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.9m (19.4ft),  Skew: 7 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.7m (22.0ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 77.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $210,000,  Roadway Improvement Cost: $123,000,  Total Project Cost: $332,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 334925,  Location: HAMLET OF CONKLIN (Lat: 42.036228,  Lng: -75.803828),  Route carried "on" structure: County highway ,  Year Built: 1966,  Status: Open,  Structure Length: 19.57m (64.21ft),  Average Daily Traffic: 6,055 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 7,355 (year 2040),  Design Load: HS 20,  Features Intersected: DELAWARE & HUDSON, SUSQU,  Facility Carried by Structure: COUNTY ROAD 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 19.56m (64.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $4,172,000,  Roadway Improvement Cost: $2,443,000,  Total Project Cost: $6,616,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 334926,  Location: 4.0 MI WEST OF CONKLIN (Lat: 42.013153,  Lng: -75.862078),  Route carried "on" structure: County highway ,  Year Built: 1966,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 217 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 304 (year 2037),  Design Load: HS 20,  Features Intersected: LITTLE SNAKE CREEK,  Facility Carried by Structure: BRADY HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.232,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $601,000,  Roadway Improvement Cost: $352,000,  Total Project Cost: $953,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334927,  Location: IN CONKLIN FORKS (Lat: 42.023672,  Lng: -75.855333),  Route carried "on" structure: County highway ,  Year Built: 1939,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 533 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 746 (year 2037),  Features Intersected: LITTLE SNAKE CREEK,  Facility Carried by Structure: CONKLIN FORKS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.3m (56.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $542,000,  Roadway Improvement Cost: $318,000,  Total Project Cost: $860,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334928,  Location: 3.0 MI WEST OF CONKLIN (Lat: 42.023492,  Lng: -75.856161),  Route carried "on" structure: County highway ,  Year Built: 1971,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 305 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 427 (year 2038),  Design Load: HS 20,  Features Intersected: LITTLE SNAKE CREEK,  Facility Carried by Structure: PIERCE CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.8m (61.7ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.0m,  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $919,000,  Roadway Improvement Cost: $538,000,  Total Project Cost: $1,458,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334929,  Location: 2.7 MI WEST OF CONKLIN (Lat: 42.026458,  Lng: -75.858839),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 305 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 427 (year 2038),  Design Load: H 20,  Features Intersected: W FORK LITTLE SNAKE CREE,  Facility Carried by Structure: PIERCE CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 62.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $122,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $193,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 335869,  Location: AT CONKLIN (Lat: 42.095319,  Lng: -75.837906),  Route carried "on" structure: Business County highway ,  Year Built: 1964,  Status: Open,  Structure Length: 17.89m (58.69ft),  Average Daily Traffic: 6,290 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 7,641 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE 7, SUSQUEHANNA RIVER,  Facility Carried by Structure: COUNTY ROAD 177
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 35.6m (116.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.89m (58.69ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: June 2016,  Bridge Improvement Cost: $3,786,000,  Roadway Improvement Cost: $2,217,000,  Total Project Cost: $6,003,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 33711,  Location: 1.28 mi. NW of intersecti (Lat: 42.051342,  Lng: -75.816244),  Route carried "on" structure: County highway ,  Year Built: 1985,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,510 (year 2017),  Truck Traffic: 13%,  Average Future Daily Traffic: 1,868 (year 2040),  Features Intersected: CARLIN CK,  Facility Carried by Structure: CR 197
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.995,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.7m (8.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 74.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $98,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $155,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 335869,  Location: AT CONKLIN (Lat: 42.095319,  Lng: -75.837906),  Route carried "under" structure: State highway 7,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 4,303 (year 2011),  Features Intersected: RTE 7, SUSQUEHANNA RIVER
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 12.068,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.6m (116.8ft)