Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Cortland, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 72ft / 22.4mTotal length
  • $16,136,000Total costs
  • 92,957Total average daily traffic
  • 7,869Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Cortland
  • No street view available for this location

New bridges in Cortland, NY - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11950-1959
  • 51960-1969
  • 21980-1989
  • 21990-1999
  • 22000-2009
  • 12010-2019
Reconstructed bridges in Cortland, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 21990-1999
Average Bridge Daily Traffic in Cortland, NY
Average Bridge Truck Traffic in Cortland, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Excellent
  • 14.3%Good
  • 28.6%Satisfactory
  • 42.9%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Excellent
  • 12.5%Very good
  • 25.0%Good
  • 50.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Excellent
  • 12.5%Very good
  • 50.0%Good
  • 25.0%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 40.0%Very good
  • 30.0%Satisfactory
  • 30.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Very good
  • 25.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 101042,  Location: .1 MI S JCT RTS 13 + I-81 (Lat: 42.607589,  Lng: -76.166911),  Route carried "on" structure: State highway 13,  Year Built: 2008,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 13,873 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 16,852 (year 2040),  Design Load: HL 93,  Features Intersected: TIOUGHNIOGA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.183,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Skew: 23 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.3m (106.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 18.1m (59.4ft),  Out-to-Out Width: 22.5m (73.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 82.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,064,000,  Roadway Improvement Cost: $1,209,000,  Total Project Cost: $3,273,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1010431,  Location: JCT OF RTS 13 + I-81 SB (Lat: 42.609131,  Lng: -76.166458),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Status: Open,  Structure Length: 4.42m (14.50ft),  Average Daily Traffic: 13,124 (year 2008),  Truck Traffic: 27%,  Design Load: HS 20,  Features Intersected: RTE 13
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.661,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.8m (74.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.41m (14.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $919,000,  Roadway Improvement Cost: $538,000,  Total Project Cost: $1,458,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1010432,  Location: JCT OF RTS 13 + I-81 NB (Lat: 42.609544,  Lng: -76.166275),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 4.54m (14.90ft),  Average Daily Traffic: 8,055 (year 2019),  Truck Traffic: 26%,  Average Future Daily Traffic: 11,619 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 13
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.645,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.4m (76.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.54m (14.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $969,000,  Roadway Improvement Cost: $567,000,  Total Project Cost: $1,536,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 101044,  Location: 3.6 MI NE JCT SH 13 & I81 (Lat: 42.649319,  Lng: -76.123758),  Route carried "on" structure: State highway 13,  Year Built: 2002,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 2,695 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 2,711 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: TIOUGHNIOGA TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.152,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.5m (31.2ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 79.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $768,000,  Roadway Improvement Cost: $450,000,  Total Project Cost: $1,218,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 22078,  Location: CITY OF CORTLAND (Lat: 42.603722,  Lng: -76.193539),  Route carried "on" structure: City street ,  Year Built: 2019,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 1,932 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,705 (year 2039),  Design Load: HS 20,  Features Intersected: DRY CREEK,  Facility Carried by Structure: MADISON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 15.4m (50.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $725,000,  Roadway Improvement Cost: $425,000,  Total Project Cost: $1,150,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 220781,  Location: CITY OF CORTLAND (Lat: 42.604167,  Lng: -76.192900),  Route carried "on" structure: City street ,  Year Built: 1935,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 954 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,180 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: DRY CREEK,  Facility Carried by Structure: FLORAL AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 4.0m (13.1ft),  Right: 3.7m (12.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $423,000,  Roadway Improvement Cost: $248,000,  Total Project Cost: $670,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 220782,  Location: 1 MI W RTE 11 (Lat: 42.604728,  Lng: -76.191708),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 817 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,144 (year 2038),  Design Load: HS 20,  Features Intersected: DRY CREEK,  Facility Carried by Structure: HAMLIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.5m (14.8ft),  Curb or Sidewalk Widths: Left: 5.0m (16.4ft),  Right: 4.9m (16.1ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 75.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $407,000,  Roadway Improvement Cost: $238,000,  Total Project Cost: $645,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 220783,  Location: CITY OF CORTLAND (Lat: 42.606917,  Lng: -76.185936),  Route carried "on" structure: City street ,  Year Built: 1980,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 2,599 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,157 (year 2040),  Features Intersected: DRY CREEK,  Facility Carried by Structure: HOMER AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.660,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 61.0m (200.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 76.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,506,000,  Roadway Improvement Cost: $882,000,  Total Project Cost: $2,389,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 220785,  Location: 0.6 MI N JCT RTS 11 & 222 (Lat: 42.607817,  Lng: -76.184825),  Route carried "on" structure: US 11,  Year Built: 1991,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 5,589 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,789 (year 2040),  Design Load: HS 20,  Features Intersected: DRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.351,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $687,000,  Roadway Improvement Cost: $402,000,  Total Project Cost: $1,090,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 220786,  Location: 0.4 MI W JCT RTS 222 + 11 (Lat: 42.601031,  Lng: -76.189339),  Route carried "on" structure: State highway 222,  Year Built: 1983,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 6,185 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,513 (year 2040),  Design Load: HS 20,  Features Intersected: OTTER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.613,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 5.8m (19.0ft),  Right: 3.7m (12.1ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 78.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $732,000,  Roadway Improvement Cost: $429,000,  Total Project Cost: $1,161,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 220787,  Location: CITY OF CORTLAND (Lat: 42.604308,  Lng: -76.185722),  Route carried "on" structure: City street ,  Year Built: 1954,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,325 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,255 (year 2037),  Features Intersected: OTTER CREEK,  Facility Carried by Structure: MADISON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.191,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 2.9m (9.5ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 74.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $237,000,  Roadway Improvement Cost: $139,000,  Total Project Cost: $376,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 220788,  Location: CITY OF CORTLAND (Lat: 42.606133,  Lng: -76.174831),  Route carried "on" structure: City street ,  Year Built: 1962,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 2,255 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,157 (year 2037),  Design Load: H 15,  Features Intersected: W B TIOUGHNIOGA R,  Facility Carried by Structure: RICKARD STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $738,000,  Roadway Improvement Cost: $432,000,  Total Project Cost: $1,170,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1010431,  Location: JCT OF RTS 13 + I-81 SB (Lat: 42.609131,  Lng: -76.166458),  Route carried "under" structure: State highway 13,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 16,277 (year 2000),  Features Intersected: RTE 13,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 4.87m (15.98ft),  Kilometerpoint: 3.781,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.8m (74.8ft)

Find on map >>   Show street view

Structure Number: 1010432,  Location: JCT OF RTS 13 + I-81 NB (Lat: 42.609544,  Lng: -76.166275),  Route carried "under" structure: State highway 13,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 16,277 (year 2000),  Features Intersected: RTE 13,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 3.781,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.4m (76.8ft)

Discuss Cortland, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.