![]() |
Bridge Statistics for Cortlandt, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Cortlandt, NY, New York, New York forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 32 Total length: 110 meters (361ft) Total costs: $49,129,000 Total average daily traffic: 422,656 Total average daily truck traffic: 25,634 National Bridge Inventory (NBI) Registered Bridges for Cortlandt
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 100342, Location: JCT BEAR MTN PKWY & US 6 (Lat: 41.299214, Lng: -73.885753), Route carried "on" structure: State highway 987H, Year Built: 1931, Status: Open, Structure Length: 2.56m (8.40ft), Average Daily Traffic: 16,868 (year 2002), Truck Traffic: 6%, Average Future Daily Traffic: 21,947 (year 2022), Design Load: HS 20, Features Intersected: RTE 6 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 322.781, Lanes on structure: 4, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 18.2m (59.7ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.6m (2.0ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 15.0m (49.2ft) Condition: Deck: Very good, Superstructure: Good, Substructure: Very good, Operating Rating: 85.6 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 2.56m (8.40ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2006, Bridge Improvement Cost: $852,000, Roadway Improvement Cost: $507,000, Total Project Cost: $1,359,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 100503, Location: 2.5 MI N JCT RTS 9+129 (Lat: 41.228694, Lng: -73.911614), Route carried "on" structure: US 9, Year Built: 1964, Status: Open, Structure Length: 1.12m (3.67ft), Average Daily Traffic: 50,068 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 70,095 (year 2027), Design Load: HS 20, Features Intersected: FURNACE DOCK ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 30.550, Lanes on structure: 6, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 29.2m (95.8ft), Skew: 21 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.0m (32.8ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 35.9m (117.8ft), Out-to-Out Width: 36.8m (120.7ft) Condition: Superstructure: Good, Substructure: Good, Operating Rating: 79.7 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.12m (3.67ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $916,000, Roadway Improvement Cost: $545,000, Total Project Cost: $1,461,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 100504, Location: 2.5 MI N JCT RTS 9+129 (Lat: 41.229369, Lng: -73.911519), Route carried "on" structure: US 9, Year Built: 1964, Status: Open, Structure Length: 1.31m (4.30ft), Average Daily Traffic: 50,068 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 70,095 (year 2027), Design Load: HS 20, Features Intersected: FURNACE BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 30.548, Lanes on structure: 6, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 27.4m (89.9ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.6m (11.8ft), Curb-To-Curb Width: 29.5m (96.8ft), Out-to-Out Width: 36.8m (120.7ft) Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 74.9 metric tons, Inventory Rating: 29.3 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present desirable criteria, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.31m (4.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $1,067,000, Roadway Improvement Cost: $635,000, Total Project Cost: $1,702,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1005051, Location: 5.5 MI N JCT RTS 9+129 (Lat: 41.231214, Lng: -73.911406), Route carried "on" structure: US 9, Year Built: 1964, Status: Open, Structure Length: 5.27m (17.29ft), Average Daily Traffic: 25,034 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 35,048 (year 2027), Design Load: HS 20, Features Intersected: RTE 9A Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 30.851, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.5m (37.7ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 24.0m (78.7ft), Curb-To-Curb Width: 9.7m (31.8ft), Out-to-Out Width: 10.5m (34.4ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 89.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 53.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.27m (17.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $1,067,000, Roadway Improvement Cost: $635,000, Total Project Cost: $1,702,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1005052, Location: 5.5 MI N JCT RTS 9+129 (Lat: 41.231214, Lng: -73.911406), Route carried "on" structure: US 9, Year Built: 1964, Status: Open, Structure Length: 5.30m (17.39ft), Average Daily Traffic: 25,034 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 35,048 (year 2027), Design Load: HS 20+Mod, Features Intersected: RTE 9A Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 30.851, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.5m (37.7ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 24.0m (78.7ft), Curb-To-Curb Width: 9.7m (31.8ft), Out-to-Out Width: 10.3m (33.8ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 90.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 54.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.30m (17.39ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $1,067,000, Roadway Improvement Cost: $635,000, Total Project Cost: $1,702,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 100506, Location: 5.9 MI N JCT RTS 9+129 (Lat: 41.236244, Lng: -73.912839), Route carried "on" structure: City street , Year Built: 1964, Year Reconstructed: 1994, Status: Open, Structure Length: 4.51m (14.80ft), Average Daily Traffic: 4,138 (year 1997), Truck Traffic: 8%, Average Future Daily Traffic: 5,793 (year 2017), Design Load: H 20, Features Intersected: RTE 9, Facility Carried by Structure: WATCH HILL ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 9.7m (31.8ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 23.7m (77.8ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 9.2m (30.2ft), Out-to-Out Width: 10.5m (34.4ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 59.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.51m (14.80ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Bridge Improvement Cost: $1,067,000, Roadway Improvement Cost: $635,000, Total Project Cost: $1,702,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1005079, Location: IN MONTROSE (Lat: 41.253408, Lng: -73.927725), Route carried "on" structure: US 9, Year Built: 1964, Status: Open, Structure Length: 1.52m (4.99ft), Average Daily Traffic: 35,299 (year 2005), Truck Traffic: 6%, Average Future Daily Traffic: 49,419 (year 2025), Design Load: HS 20, Features Intersected: MONTROSE STA ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 33.606, Lanes on structure: 4, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Skew: 22 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.9m (35.8ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 27.7m (90.9ft), Out-to-Out Width: 29.5m (96.8ft) Condition: Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 80.4 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.52m (4.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $994,000, Roadway Improvement Cost: $592,000, Total Project Cost: $1,586,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 100508, Location: 8.5 MI N JCT RTS 9+129 (Lat: 41.267622, Lng: -73.934381), Route carried "on" structure: US 9, Year Built: 1964, Status: Open, Structure Length: 0.60m (1.97ft), Average Daily Traffic: 35,299 (year 2005), Truck Traffic: 6%, Average Future Daily Traffic: 49,419 (year 2025), Design Load: H 20, Features Intersected: DICKEY BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.061, Lanes on structure: 5, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 30.4m (99.7ft), Skew: 10 degrees, Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 2.7m (8.9ft) Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 71.9 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.60m (1.97ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $418,000, Roadway Improvement Cost: $249,000, Total Project Cost: $667,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 100515, Location: 1.4 MI S WESTCH-PUTNAM CL (Lat: 41.308514, Lng: -73.930608), Route carried "on" structure: US 9, Year Built: 1950, Year Reconstructed: 1974, Status: Open, Structure Length: 8.80m (28.87ft), Average Daily Traffic: 17,515 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 24,521 (year 2027), Design Load: H 20, Features Intersected: COUNTY RTE 306, ANNSVILL Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.517, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 8.2m (26.9ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 24.0m (78.7ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.7m (31.8ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Satisfactory, Channel: Good, Operating Rating: 55.6 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 33.7 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Underclear: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 8.80m (28.87ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $1,896,000, Roadway Improvement Cost: $1,128,000, Total Project Cost: $3,024,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 100516, Location: 1 MI S OF WEST- PUTNAM CL (Lat: 41.312611, Lng: -73.929728), Route carried "on" structure: US 9, Year Built: 1950, Status: Open, Structure Length: 0.91m (2.99ft), Average Daily Traffic: 17,515 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 24,521 (year 2027), Design Load: HS 20, Features Intersected: ANNSVILLE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.216, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Skew: 4 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.2m (26.9ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.8m (32.2ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Satisfactory, Operating Rating: 78.4 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 0.91m (2.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2006, Bridge Improvement Cost: $198,000, Roadway Improvement Cost: $118,000, Total Project Cost: $316,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 100624, Location: 3.7 MI N JCT RTS 9A+129 (Lat: 41.239775, Lng: -73.922183), Route carried "on" structure: State highway 9A, Year Built: 1935, Year Reconstructed: 1990, Status: Open, Structure Length: 4.32m (14.17ft), Average Daily Traffic: 12,222 (year 2000), Truck Traffic: 6%, Average Future Daily Traffic: 15,924 (year 2020), Design Load: HS 20, Features Intersected: MNRR HU LINE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 358.743, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 2, Length of Maximum Span: 24.9m (81.7ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.5m (4.9ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 16.5m (54.1ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 65.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 43.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Equal to present minimum criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.32m (14.17ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2006, Critical Feature Inspection Date: August 2006, Bridge Improvement Cost: $1,581,000, Roadway Improvement Cost: $941,000, Total Project Cost: $2,522,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 100625, Location: IN BUCHANAN S. OF PEEKSKI (Lat: 41.266283, Lng: -73.936814), Route carried "on" structure: State highway 9A, Year Built: 1950, Year Reconstructed: 1984, Status: Posted for load-capacity, Structure Length: 0.82m (2.69ft), Average Daily Traffic: 13,104 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 18,346 (year 2026), Features Intersected: DICKEY BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 40.383, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 17.6m (57.7ft), Skew: 23 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.2m (26.9ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 1.2m (3.9ft), Curb-To-Curb Width: 17.6m (57.7ft), Out-to-Out Width: 21.3m (69.9ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 49.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 29.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 0.82m (2.69ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $1,581,000, Roadway Improvement Cost: $941,000, Total Project Cost: $2,522,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 105046, Location: .2 MI E US209/ANNSVILLE (Lat: 41.307256, Lng: -73.927211), Route carried "on" structure: Other road , Year Built: 1929, Status: Open, Structure Length: 1.58m (5.18ft), Average Daily Traffic: 9,204 (year 1996), Truck Traffic: 6%, Average Future Daily Traffic: 13,349 (year 2016), Features Intersected: CANOPUS(SPRT)BRK., Facility Carried by Structure: COUNTY ROAD 306 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 161.254, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 10.0m (32.8ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 14.9m (48.9ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.0m, Curb-To-Curb Width: 12.3m (40.4ft), Out-to-Out Width: 14.5m (47.6ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Channel: Good, Operating Rating: 59.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 1.58m (5.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Bridge Improvement Cost: $729,000, Roadway Improvement Cost: $434,000, Total Project Cost: $1,163,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 105047, Location: 1.6 MI S JCT RTS 9+PUT CL (Lat: 41.308761, Lng: -73.931022), Route carried "on" structure: County highway , Year Built: 1927, Year Reconstructed: 2002, Status: Open, Structure Length: 1.01m (3.31ft), Average Daily Traffic: 7,400 (year 1970), Truck Traffic: 6%, Average Future Daily Traffic: 9,641 (year 1990), Design Load: HS 25, Features Intersected: ANNSVILLE CREEK, Facility Carried by Structure: COUNTY ROAD 306 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 10.0m (32.8ft), Skew: 6 degrees, Material/Design: Prestressed concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.0m (32.8ft), Curb-To-Curb Width: 17.1m (56.1ft), Out-to-Out Width: 17.8m (58.4ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Fair, Channel: Fair, Operating Rating: 94.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 1.01m (3.31ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $729,000, Roadway Improvement Cost: $434,000, Total Project Cost: $1,163,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 226233, Location: 2.5 MI N CROTON ON HUDSON (Lat: 41.239881, Lng: -73.898183), Route carried "on" structure: City street , Year Built: 1983, Status: Open, Structure Length: 1.06m (3.48ft), Average Daily Traffic: 1,201 (year 1995), Truck Traffic: 6%, Average Future Daily Traffic: 1,681 (year 2015), Design Load: HS 20, Features Intersected: FURNACE BROOK, Facility Carried by Structure: WASHINGTON STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.1m (29.9ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 0.0m, Curb-To-Curb Width: 6.5m (21.3ft), Out-to-Out Width: 9.2m (30.2ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Poor, Channel: Satisfactory, Operating Rating: 79.1 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.06m (3.48ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2007, Bridge Improvement Cost: $216,000, Roadway Improvement Cost: $129,000, Total Project Cost: $345,000 ( Estimate for 2007), Deck Structure Type: Open Grating Find on map >>
Structure Number: 226242, Location: 2.7 MILES N OF PEEKSKILL (Lat: 41.325247, Lng: -73.914011), Route carried "on" structure: City street , Year Built: 1956, Status: Open, Structure Length: 1.46m (4.79ft), Average Daily Traffic: 774 (year 1995), Truck Traffic: 8%, Average Future Daily Traffic: 1,084 (year 2015), Features Intersected: CORTLANDT LAKE CK, Facility Carried by Structure: HIGHLAND DRIVE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.6m (24.9ft), Material/Design: Steel, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 2, Length of Maximum Span: 6.4m (21.0ft), Curb-To-Curb Width: 7.6m (24.9ft), Out-to-Out Width: 9.9m (32.5ft) Condition: Superstructure: Satisfactory, Substructure: Fair, Channel: Good, Operating Rating: 76.6 metric tons, Inventory Rating: 29.3 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.46m (4.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $321,000, Roadway Improvement Cost: $191,000, Total Project Cost: $512,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 226551, Location: 1.5 MI NE CROTON ON HUD. (Lat: 41.227581, Lng: -73.857106), Route carried "on" structure: City street , Year Built: 1904, Year Reconstructed: 2003, Status: Closed, Structure Length: 6.52m (21.39ft), Average Daily Traffic: 7,109 (year 1997), Truck Traffic: 8%, Average Future Daily Traffic: 9,953 (year 2017), Design Load: HS 20, Features Intersected: CROTON RES OUTLET, Facility Carried by Structure: CROTON DAM ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Local Agency, Approaching Roadway Width: 6.0m (19.7ft), Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 61.0m (200.1ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 7.2m (23.6ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Good, Channel: Good, Operating Rating: 83.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 53.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: High priority of corrective action, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below), Length Of Structure Improvement: 6.52m (21.39ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: November 2006, Critical Feature Inspection Date: November 2006, Bridge Improvement Cost: $176,000, Roadway Improvement Cost: $105,000, Total Project Cost: $281,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay Find on map >>
Structure Number: 226588, Location: 3 MILES S OF PEEKSKILL (Lat: 41.258217, Lng: -73.887597), Route carried "on" structure: City street , Year Built: 1950, Status: Open, Structure Length: 0.88m (2.89ft), Average Daily Traffic: 2,940 (year 1996), Truck Traffic: 6%, Average Future Daily Traffic: 4,116 (year 2016), Features Intersected: TRIB FURNACE BRK, Facility Carried by Structure: WATCH HILL ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.6m (11.8ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 2.1m (6.9ft) Condition: Superstructure: Good, Substructure: Good, Channel: Fair, Operating Rating: 72.5 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 0.88m (2.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $160,000, Roadway Improvement Cost: $95,000, Total Project Cost: $255,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 334842, Location: 2.3 MI NE OF PEEKSILL (Lat: 41.317769, Lng: -73.905319), Route carried "on" structure: City street , Year Built: 1939, Status: Open, Structure Length: 3.41m (11.19ft), Average Daily Traffic: 3,707 (year 1995), Truck Traffic: 6%, Average Future Daily Traffic: 5,190 (year 2015), Features Intersected: PKSKL HOLLOW CRK, Facility Carried by Structure: GALLOWS HILL ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 7.0m (23.0ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 23.4m (76.8ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 1.3m (4.3ft), Curb-To-Curb Width: 6.5m (21.3ft), Out-to-Out Width: 8.9m (29.2ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 37.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 21.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 3.41m (11.19ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $673,000, Roadway Improvement Cost: $400,000, Total Project Cost: $1,073,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 334843, Location: 2.0 MI NE OF PEEKSKILL (Lat: 41.314208, Lng: -73.908711), Route carried "on" structure: City street , Year Built: 1930, Year Reconstructed: 1948, Status: Open, Structure Length: 1.73m (5.68ft), Average Daily Traffic: 1,191 (year 1995), Truck Traffic: 8%, Average Future Daily Traffic: 1,667 (year 2015), Features Intersected: PKSKL HOLLOW BK, Facility Carried by Structure: PUMP HOUSE ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 16.4m (53.8ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 0.3m (1.0ft), Curb-To-Curb Width: 9.4m (30.8ft), Out-to-Out Width: 10.9m (35.8ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Channel: Good, Operating Rating: 73.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 44.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 1.73m (5.68ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $673,000, Roadway Improvement Cost: $400,000, Total Project Cost: $1,073,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 334844, Location: 3.1 MI NW CROTON ON HUDS. (Lat: 41.234886, Lng: -73.928300), Route carried "on" structure: Other road , Year Built: 1913, Year Reconstructed: 1952, Status: Closed, Structure Length: 13.83m (45.37ft), Average Daily Traffic: 243 (year 1995), Truck Traffic: 8%, Average Future Daily Traffic: 323 (year 2015), Features Intersected: CRUGERS STA ROAD, MNRR H, Facility Carried by Structure: CRUGERS ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Owner: Railroad, Maintenance Responsibility: Town or Township Highway Agency, Approaching Roadway Width: 5.4m (17.7ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 12, Length of Maximum Span: 23.1m (75.8ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 0.0m, Curb-To-Curb Width: 5.9m (19.4ft), Out-to-Out Width: 7.0m (23.0ft) Condition: Deck: Satisfactory, Superstructure: Serious, Substructure: Poor, Channel: Satisfactory, Deck Geometry: High priority of corrective action, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below), Length Of Structure Improvement: 13.83m (45.37ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: August 2006, Critical Feature Inspection Date: August 2006, Bridge Improvement Cost: $3,813,000, Roadway Improvement Cost: $2,511,000, Total Project Cost: $6,324,000 ( Estimate for 2007), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Wood or Timber Find on map >>
Structure Number: 334845, Location: 2.1 MI NW CROTON ON HUDS. (Lat: 41.231150, Lng: -73.905489), Route carried "on" structure: City street , Year Built: 1948, Year Reconstructed: 1960, Status: Open, Structure Length: 0.97m (3.18ft), Average Daily Traffic: 4,028 (year 1995), Truck Traffic: 6%, Average Future Daily Traffic: 5,639 (year 2015), Features Intersected: FURNACE BROOK, Facility Carried by Structure: FURNACE DOCK ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 5 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.1m (29.9ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.0m, Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 11.8m (38.7ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Fair, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.97m (3.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $3,813,000, Roadway Improvement Cost: $2,511,000, Total Project Cost: $6,324,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 334846, Location: 2.5 MI NW CROTON ON HUDS. (Lat: 41.228917, Lng: -73.924628), Route carried "on" structure: Other road , Year Built: 1938, Status: Open, Structure Length: 1.37m (4.49ft), Average Daily Traffic: 113 (year 1995), Truck Traffic: 8%, Average Future Daily Traffic: 150 (year 2015), Features Intersected: FURNACE BROOK, Facility Carried by Structure: CORTLANDT STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 13.1m (43.0ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 2.0m (6.6ft), Curb-To-Curb Width: 9.2m (30.2ft), Out-to-Out Width: 12.4m (40.7ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 58.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.37m (4.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $3,813,000, Roadway Improvement Cost: $2,511,000, Total Project Cost: $6,324,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 334856, Location: AT CROTON ON HUDSON (Lat: 41.212161, Lng: -73.866442), Route carried "on" structure: City street , Year Built: 1930, Year Reconstructed: 1994, Status: Posted for load, Structure Length: 3.01m (9.88ft), Average Daily Traffic: 617 (year 1995), Truck Traffic: 8%, Average Future Daily Traffic: 864 (year 2015), Features Intersected: CROTON RIVER, Facility Carried by Structure: QUAKER BRIDGE RD Minimum Vertical Clearance: 3.96m (12.99ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: County Highway Agency, Approaching Roadway Width: 5.7m (18.7ft), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 1, Length of Maximum Span: 29.8m (97.8ft), Curb-To-Curb Width: 4.7m (15.4ft), Out-to-Out Width: 6.1m (20.0ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 40.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 29.0 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Somewhat better than minimum adequacy, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below), Length Of Structure Improvement: 3.01m (9.88ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: September 2007, Critical Feature Inspection Date: September 2007, Bridge Improvement Cost: $410,000, Roadway Improvement Cost: $244,000, Total Project Cost: $654,000 ( Estimate for 2007), Deck Structure Type: Open Grating Find on map >>
Structure Number: 33489, Location: 2.0 MI NE CROTON ON HUDS. (Lat: 41.226386, Lng: -73.858283), Route carried "on" structure: Other road , Year Built: 1940, Status: Posted for load, Structure Length: 4.63m (15.19ft), Average Daily Traffic: 183 (year 1995), Truck Traffic: 8%, Average Future Daily Traffic: 243 (year 2015), Features Intersected: CROTON RIVER, Facility Carried by Structure: CROTON GORGE PKRD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: County Highway Agency, Approaching Roadway Width: 4.8m (15.7ft), Material/Design: Steel, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 45.7m (149.9ft), Curb-To-Curb Width: 5.5m (18.0ft), Out-to-Out Width: 6.4m (21.0ft) Condition: Deck: Good, Superstructure: Poor, Substructure: Satisfactory, Channel: Good, Operating Rating: 6.0 metric tons, Inventory Rating: 6.0 metric tons, Structural Evaluation: High priority of corrective action, Deck Geometry: High priority of corrective action, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Better than present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below), Length Of Structure Improvement: 4.63m (15.19ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: March 2008, Critical Feature Inspection Date: March 2008, Bridge Improvement Cost: $862,000, Roadway Improvement Cost: $516,000, Total Project Cost: $1,378,000 ( Estimate for 2007), Deck Structure Type: Corrugated Steel, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 771268, Location: IN MONTROSE (Lat: 41.253036, Lng: -73.928361), Route carried "on" structure: City street , Year Built: 1937, Status: Open, Structure Length: 4.20m (13.78ft), Average Daily Traffic: 1,444 (year 1995), Truck Traffic: 6%, Average Future Daily Traffic: 2,022 (year 2015), Features Intersected: MNRR HU LINE, Facility Carried by Structure: MONTROSE STA ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Railroad, Maintenance Responsibility: Town or Township Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 2, Length of Maximum Span: 29.8m (97.8ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.5m (4.9ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.2m (33.5ft) Condition: Deck: Poor, Superstructure: Poor, Substructure: Satisfactory, Operating Rating: 60.5 metric tons, Inventory Rating: 15.9 metric tons, Structural Evaluation: Meets minimum limits, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.20m (13.78ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: June 2007, Critical Feature Inspection Date: June 2007, Bridge Improvement Cost: $1,248,000, Roadway Improvement Cost: $747,000, Total Project Cost: $1,995,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 100342, Location: JCT BEAR MTN PKWY & US 6 (Lat: 41.299214, Lng: -73.885753), Route carried "under" structure: US 6, Year Built: 1931, Structure Length: 2.56m (8.40ft), Average Daily Traffic: 17,331 (year 2006), Truck Traffic: 6%, Features Intersected: RTE 6, Facility Carried by Structure: RTE 987H Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 0.418, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 18.2m (59.7ft) Find on map >>
Structure Number: 1005051, Location: 5.5 MI N JCT RTS 9+129 (Lat: 41.231214, Lng: -73.911406), Route carried "under" structure: Alternate State highway 9A, Year Built: 1964, Structure Length: 5.27m (17.29ft), Average Daily Traffic: 13,104 (year 2006), Truck Traffic: 6%, Features Intersected: RTE 9A, Facility Carried by Structure: RTE 9 Minimum Vertical Clearance: 5.15m (16.90ft), Kilometerpoint: 3.543, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.0m (78.7ft) Find on map >>
Structure Number: 1005052, Location: 5.5 MI N JCT RTS 9+129 (Lat: 41.231214, Lng: -73.911406), Route carried "under" structure: Alternate State highway 9A, Year Built: 1964, Structure Length: 5.30m (17.39ft), Average Daily Traffic: 13,104 (year 2006), Truck Traffic: 6%, Features Intersected: RTE 9A, Facility Carried by Structure: RTE 9 Minimum Vertical Clearance: 5.51m (18.08ft), Kilometerpoint: 3.543, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.0m (78.7ft) Find on map >>
Structure Number: 100506, Location: 5.9 MI N JCT RTS 9+129 (Lat: 41.236244, Lng: -73.912839), Route carried "under" structure: US 9, Year Built: 1964, Structure Length: 4.51m (14.80ft), Average Daily Traffic: 35,299 (year 2005), Truck Traffic: 6%, Features Intersected: RTE 9, Facility Carried by Structure: WATCH HILL ROAD Minimum Vertical Clearance: 4.82m (15.81ft), Kilometerpoint: 31.343, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 23.7m (77.8ft) Find on map >>
Structure Number: 1005079, Location: IN MONTROSE (Lat: 41.253408, Lng: -73.927725), Route carried "under" structure: City street , Year Built: 1964, Structure Length: 1.52m (4.99ft), Average Daily Traffic: 1,000 (year 1980), Truck Traffic: 6%, Features Intersected: MONTROSE STA ROAD, Facility Carried by Structure: RTE 9 Minimum Vertical Clearance: 4.77m (15.65ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 10.9m (35.8ft) Find on map >>
Structure Number: 100515, Location: 1.4 MI S WESTCH-PUTNAM CL (Lat: 41.308514, Lng: -73.930608), Route carried "under" structure: County highway , Year Built: 1950, Structure Length: 8.80m (28.87ft), Average Daily Traffic: 500 (year 1979), Truck Traffic: 6%, Features Intersected: COUNTY RTE 306, ANNSVILL, Facility Carried by Structure: RTE 9 Minimum Vertical Clearance: 5.58m (18.31ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.0m (78.7ft) Discuss this city on our hugely popular New York forum Back to: Cortlandt, NY, New York, All US cities.
|
![]() |