U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Craftsbury, Vermont (VT) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Craftsbury, VT, Vermont, Vermont forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 16
Total length: 20 meters (66ft)
Total costs: $9,497,000
Total average daily traffic: 3,774
Total average daily truck traffic: 160
Total future (year 2015) average daily traffic: 5,660
National Bridge Inventory (NBI) Registered Bridges for Craftsbury

New bridges - Historical Statistics

  • 1910-1919: 1
  • 1920-1929: 5
  • 1930-1939: 1
  • 1940-1949: 0
  • 1950-1959: 1
  • 1960-1969: 0
  • 1970-1979: 1
  • 1980-1989: 4
  • 1990-1999: 3

Reconstructed bridges - Historical Statistics

  • 1960-1969: 1
  • 1970-1979: 0
  • 1980-1989: 2

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 101006000210061,  Location: 0.35 MI TO JCT W VT14 (Lat: 44.637500,  Lng: -72.388889),  Route carried "on" structure: Other road C3059,  Year Built: 1984,  Status: Temporarily open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 100 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 150 (year 2018),  Features Intersected: BLACK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Failed,  Superstructure: Failed,  Substructure: Serious,  Channel: Satisfactory,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $229,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $379,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 101006000410061,  Location: 0.9 MI TO JCT W CL3 TH32 (Lat: 44.660556,  Lng: -72.352778),  Route carried "on" structure: Other road C2004,  Year Built: 1929,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 140 (year 1995),  Truck Traffic: 3%,  Average Future Daily Traffic: 210 (year 2015),  Features Intersected: WHITNEY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2007,  Other Special Inspection Date: June 2007,  Bridge Improvement Cost: $392,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $542,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 101006000510061,  Location: 0.15 MI TO JCT W C3 TH32 (Lat: 44.645278,  Lng: -72.363611),  Route carried "on" structure: Other road C2004,  Year Built: 1981,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 160 (year 1998),  Truck Traffic: 3%,  Average Future Daily Traffic: 240 (year 2018),  Design Load: HS 20,  Features Intersected: BLACK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.35m (7.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $666,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $816,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 101006001810061,  Location: 0.2 MI TO JCT CL1 TH3 (Lat: 44.647778,  Lng: -72.420278),  Route carried "on" structure: Other road C3041,  Year Built: 1993,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 50 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 75 (year 2018),  Features Intersected: WILD BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 54.0 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $307,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $457,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 101006002210061,  Location: 0.1 MI TO JCT W VT14 (Lat: 44.687778,  Lng: -72.396944),  Route carried "on" structure: Other road C3018,  Year Built: 1972,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 10 (year 2004),  Truck Traffic: 2%,  Average Future Daily Traffic: 15 (year 2024),  Design Load: H 15,  Features Intersected: BLACK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 4.5m (14.8ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Critical Feature Inspection Date: June 2007,  Bridge Improvement Cost: $368,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $518,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 101006002310061,  Location: 0.03 MI TO JCT W C3 TH44 (Lat: 44.630556,  Lng: -72.379722),  Route carried "on" structure: Other road C3039,  Year Built: 1980,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 165 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 247 (year 2018),  Design Load: HS 20,  Features Intersected: BLACK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.77m (9.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $684,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $834,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 101006002410061,  Location: 0.25 MI TO JCT W C3 TH22 (Lat: 44.673056,  Lng: -72.431111),  Route carried "on" structure: Other road C3021,  Year Built: 1996,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 159 (year 2004),  Truck Traffic: 1%,  Average Future Daily Traffic: 238 (year 2024),  Features Intersected: WILD BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 74.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $386,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $536,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 101006002510061,  Location: 0.1 MI TO JCT W CL3 TH21 (Lat: 44.668056,  Lng: -72.429722),  Route carried "on" structure: Other road C2006,  Year Built: 1989,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 260 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 390 (year 2018),  Design Load: HS 20,  Features Intersected: WILD BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 31.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $371,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $521,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 101006002610061,  Location: 0.3 MI TO JCT W VT14 (Lat: 44.658056,  Lng: -72.397778),  Route carried "on" structure: Other road C3025,  Year Built: 1919,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 90 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 135 (year 2018),  Features Intersected: BLACK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 47.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $450,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $600,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 101006002710061,  Location: 0.01 MI TO JCT W CL2 TH4 (Lat: 44.647778,  Lng: -72.361944),  Route carried "on" structure: Other road C3032,  Year Built: 1922,  Status: Closed,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 30 (year 1995),  Truck Traffic: 2%,  Average Future Daily Traffic: 45 (year 2015),  Features Intersected: BLACK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 3.8m (12.5ft),  Out-to-Out Width: 3.8m (12.5ft)

Condition: Deck: Critical,  Superstructure: Critical,  Substructure: Poor,  Channel: Very good,  Deck Geometry: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Critical Feature Inspection Date: June 2007,  Bridge Improvement Cost: $184,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $334,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 101006002810061,  Location: 0.06 MI TO JCT W CL2 TH4 (Lat: 44.638333,  Lng: -72.370556),  Route carried "on" structure: Other road C3035,  Year Built: 1922,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 50 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 75 (year 2018),  Features Intersected: BLACK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.0 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $288,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $438,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 101006002910061,  Location: 0.03 MI TO JCT W CL2 TH4 (Lat: 44.636944,  Lng: -72.372222),  Route carried "on" structure: Other road C3055,  Year Built: 1925,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 50 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 75 (year 2018),  Features Intersected: BLACK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Serious,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 12.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 9.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2007,  Other Special Inspection Date: June 2007,  Bridge Improvement Cost: $242,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $392,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 200247000610062,  Location: 2.2 MI W JCT. VT.14 (Lat: 44.631111,  Lng: -72.428333),  Route carried "on" structure: County highway 3,  Year Built: 1928,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 970 (year 1995),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,455 (year 2015),  Design Load: H 10,  Features Intersected: WILD BR. LAMOILLE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.38m (7.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $619,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $769,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 200253003210062,  Location: 0.6 MI E JCT. VT.14 S (Lat: 44.623611,  Lng: -72.360556),  Route carried "on" structure: County highway 1,  Year Built: 1995,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 610 (year 1995),  Truck Traffic: 4%,  Average Future Daily Traffic: 915 (year 2015),  Features Intersected: WHETSTONE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 54.0 metric tons,  Inventory Rating: 54.0 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $386,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $536,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200253003510062,  Location: 1.5 MI E JCT. VT.14 S (Lat: 44.633889,  Lng: -72.370833),  Route carried "on" structure: County highway 1,  Year Built: 1939,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 660 (year 1995),  Truck Traffic: 6%,  Average Future Daily Traffic: 990 (year 2015),  Features Intersected: BLACK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 50.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $460,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $610,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 200253003710062,  Location: 0.4 MI E JCT. VT.14 N (Lat: 44.677222,  Lng: -72.400833),  Route carried "on" structure: County highway 1,  Year Built: 1953,  Status: Open,  Structure Length: 2.71m (8.89ft),  Average Daily Traffic: 270 (year 1995),  Truck Traffic: 6%,  Average Future Daily Traffic: 405 (year 2015),  Design Load: H 20,  Features Intersected: BLACK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 47.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.54m (11.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $1,065,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $1,215,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous

Discuss this city on our hugely popular Vermont forum

Back to: Craftsbury, VT, Vermont, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.