Bridge Statistics for Danville, Vermont (VT) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Danville, VT, Vermont, Vermont forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 16
Total length: 22 meters (72ft)
Total costs: $9,023,000
Total average daily traffic: 7,935
Total average daily truck traffic: 584
National Bridge Inventory (NBI) Registered Bridges for Danville

New bridges - Historical Statistics

  • Before 1900: 1
  • 1900-1909: 1
  • 1910-1919: 0
  • 1920-1929: 2
  • 1930-1939: 4
  • 1940-1949: 2
  • 1950-1959: 1
  • 1960-1969: 1
  • 1970-1979: 0
  • 1980-1989: 2
  • 1990-1999: 1
  • 2000-2009: 1

Reconstructed bridges - Historical Statistics

  • 1980-1989: 1
  • 1990-1999: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 100303000403031,  Location: 0.1 MI JCT TH 74 + TH 1 (Lat: 44.378611,  Lng: -72.092222),  Route carried "on" structure: Other road C2001,  Year Built: 1949,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 300 (year 1997),  Truck Traffic: 3%,  Average Future Daily Traffic: 450 (year 2017),  Design Load: H 15,  Features Intersected: JOES BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.38m (7.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $647,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $797,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 100303002503031,  Location: 0.1 MI JCT TH 61 + TH 73 (Lat: 44.389722,  Lng: -72.062500),  Route carried "on" structure: Other road C3061,  Year Built: 1947,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 50 (year 1997),  Truck Traffic: 2%,  Average Future Daily Traffic: 75 (year 2017),  Features Intersected: WATER ANDRIC BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 54.0 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $283,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $433,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>

Structure Number: 100303002703031,  Location: 0.5 MI JCT TH30 + TH 42 (Lat: 44.498889,  Lng: -72.104722),  Route carried "on" structure: Other road C3030,  Year Built: 2005,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 100 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 150 (year 2025),  Design Load: HS 25,  Features Intersected: HOUGHTON BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 54.0 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $111,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $136,000 ( Estimate for 2007)
Find on map >>

Structure Number: 100303002903031,  Location: 0.1 MI JCT TH 60 + TH 61 (Lat: 44.412500,  Lng: -72.116944),  Route carried "on" structure: Other road C3060,  Year Built: 1920,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 100 (year 1997),  Truck Traffic: 2%,  Average Future Daily Traffic: 150 (year 2017),  Features Intersected: LAMOILLE VALLEY RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 10.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 7.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $276,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $426,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber,  Deck Protection: Internally Sealed
Find on map >>

Structure Number: 100303003003031,  Location: 0.2 MI JCT TH 65 + TH 2 (Lat: 44.445278,  Lng: -72.061944),  Route carried "on" structure: Other road C3065,  Year Built: 1952,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 100 (year 1997),  Truck Traffic: 2%,  Average Future Daily Traffic: 150 (year 2017),  Features Intersected: BOG BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.7m (15.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 9.0 metric tons,  Inventory Rating: 9.0 metric tons,  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $197,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $347,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 100303003503031,  Location: 0.5 MI JCT TH 91 + TH 3 (Lat: 44.385278,  Lng: -72.152222),  Route carried "on" structure: Other road C3091,  Year Built: 1989,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 20 (year 1999),  Truck Traffic: 2%,  Average Future Daily Traffic: 30 (year 2019),  Design Load: HS 20,  Features Intersected: JOES BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 69.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $539,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $689,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 100303003603031,  Location: 1.6 MI JCT TH 12 + TH 3 (Lat: 44.393611,  Lng: -72.166111),  Route carried "on" structure: Other road C3012,  Year Built: 1985,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 30 (year 1999),  Truck Traffic: 2%,  Average Future Daily Traffic: 45 (year 2019),  Design Load: HS 20,  Features Intersected: JOES BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 76.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 45.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $412,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $562,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 100303003703031,  Location: 0.5 MI JCT TH 56 + TH 3 (Lat: 44.379722,  Lng: -72.134167),  Route carried "on" structure: Other road C3056,  Year Built: 1965,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 100 (year 1997),  Truck Traffic: 2%,  Average Future Daily Traffic: 150 (year 2017),  Features Intersected: JOES BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 27.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 17.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $399,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $549,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 100303003803031,  Location: 0.05 MI JCT TH 40 + TH 2 (Lat: 44.458056,  Lng: -72.095278),  Route carried "on" structure: Other road C3040,  Year Built: 1996,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 75 (year 1996),  Truck Traffic: 2%,  Average Future Daily Traffic: 112 (year 2016),  Design Load: HS 25,  Features Intersected: SLEEPERS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 70.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $566,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $716,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 100303004003031,  Location: 0.1 MI JCT TH 56 + TH 54 (Lat: 44.377500,  Lng: -72.121944),  Route carried "on" structure: Other road C3054,  Year Built: 1886,  Year Reconstructed: 2002,  Status: Posted for load,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 100 (year 1997),  Truck Traffic: 2%,  Average Future Daily Traffic: 150 (year 2017),  Features Intersected: JOES BROOK
Minimum Vertical Clearance: 3.73m (12.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Wood or Timber,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 3.0m (9.8ft),  Out-to-Out Width: 4.4m (14.4ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 9.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 6.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.08m (10.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $429,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $579,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 200028009203032,  Location: 0.1 MI W JCT VT.15 (Lat: 44.408611,  Lng: -72.196111),  Route carried "on" structure: US 2,  Year Built: 1934,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 3,600 (year 1998),  Truck Traffic: 10%,  Average Future Daily Traffic: 5,400 (year 2018),  Design Load: HS 20+Mod,  Features Intersected: JOES BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 165.732,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.93m (9.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $1,090,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $1,240,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 200215000503032,  Location: 2.1 MI S JCT. U.S.2 W (Lat: 44.383056,  Lng: -72.144722),  Route carried "on" structure: County highway 3,  Year Built: 1929,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 910 (year 1995),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,365 (year 2015),  Design Load: H 10,  Features Intersected: JOES BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 19.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $426,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $576,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 200215000603032,  Location: 1.5 MI N JCT US2 EAST (Lat: 44.449167,  Lng: -72.063889),  Route carried "on" structure: County highway 2,  Year Built: 1937,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 640 (year 1995),  Truck Traffic: 6%,  Average Future Daily Traffic: 960 (year 2015),  Design Load: H 15,  Features Intersected: SLEEPERS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 43.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.53m (8.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $506,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $656,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200215000703032,  Location: 3.3 MI N JCT. U.S.2 EAST (Lat: 44.459167,  Lng: -72.096111),  Route carried "on" structure: County highway 2,  Year Built: 1937,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 640 (year 1995),  Truck Traffic: 6%,  Average Future Daily Traffic: 960 (year 2015),  Design Load: H 15,  Features Intersected: NORTH BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.53m (8.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $513,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $663,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 200215000803032,  Location: 3.6 MI N JCT. U.S.2 W (Lat: 44.456111,  Lng: -72.124444),  Route carried "on" structure: County highway 2,  Year Built: 1935,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 500 (year 1995),  Truck Traffic: 6%,  Average Future Daily Traffic: 750 (year 2015),  Design Load: H 15,  Features Intersected: MORRILL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 45.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.53m (8.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $504,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $654,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 200228000203032,  Location: 2.6 MI W JCT US2 E (Lat: 44.432500,  Lng: -72.075833),  Route carried "under" structure: State highway 2B,  Year Built: 1900,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 670 (year 1998),  Truck Traffic: 6%,  Features Intersected: LV RR OVER VT 2B,  Facility Carried by Structure: RAILROAD
Minimum Vertical Clearance: 4.19m (13.75ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 10.4m (34.1ft)

Discuss this city on our hugely popular Vermont forum

Back to: Danville, VT, Vermont, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.