National Bridge Inventory (NBI) Statistics
Number of bridges: 16
Total length: 34 meters (112ft)
Total costs: $10,429,000
Total average daily traffic: 30,438
Total average daily truck traffic: 2,135
National Bridge Inventory (NBI) Registered Bridges for Davenport

New bridges - Historical Statistics

  • 1920-1929: 1
  • 1930-1939: 1
  • 1940-1949: 1
  • 1950-1959: 2
  • 1960-1969: 1
  • 1970-1979: 2
  • 1980-1989: 3
  • 1990-1999: 5

Reconstructed bridges - Historical Statistics

  • 1960-1969: 1
  • 1970-1979: 1
  • 1980-1989: 1
  • 1990-1999: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 101759,  Location: 1.9 MI E OF OTSEGO CITY L (Lat: 42.439078,  Lng: -74.985706),  Route carried "on" structure: State highway 23,  Year Built: 1936,  Year Reconstructed: 1967,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 7,396 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,231 (year 2027),  Design Load: H 20,  Features Intersected: PROSSER HOLLOW BK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.792,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.0m (32.8ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Poor,  Culverts: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $239,000,  Roadway Improvement Cost: $142,000,  Total Project Cost: $381,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 10176,  Location: 0.1 MI SW DAVENPORT CENTE (Lat: 42.446444,  Lng: -74.919833),  Route carried "on" structure: State highway 23,  Year Built: 1979,  Status: Open,  Structure Length: 6.52m (21.39ft),  Average Daily Traffic: 6,637 (year 2005),  Truck Traffic: 9%,  Average Future Daily Traffic: 9,064 (year 2025),  Design Load: HS 20,  Features Intersected: KORTRIGHT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.946,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 11.5m (37.7ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.52m (21.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $239,000,  Roadway Improvement Cost: $142,000,  Total Project Cost: $381,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 101761,  Location: 10.4 MI NW JCT SH23 &SH10 (Lat: 42.469278,  Lng: -74.795825),  Route carried "on" structure: State highway 23,  Year Built: 1940,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 2.92m (9.58ft),  Average Daily Traffic: 3,918 (year 2007),  Truck Traffic: 9%,  Average Future Daily Traffic: 5,351 (year 2027),  Design Load: H 20,  Features Intersected: MIDDLE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.994,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.92m (9.58ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Critical Feature Inspection Date: September 2007,  Bridge Improvement Cost: $641,000,  Roadway Improvement Cost: $381,000,  Total Project Cost: $1,022,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 22661,  Location: 2 MI E OF DEL & OSTEGO C (Lat: 42.437217,  Lng: -74.984636),  Route carried "on" structure: City street ,  Year Built: 1979,  Status: Open,  Structure Length: 1.03m (3.38ft),  Average Daily Traffic: 63 (year 1998),  Truck Traffic: 6%,  Average Future Daily Traffic: 88 (year 2018),  Design Load: HS 20,  Features Intersected: POSSER HOLLOW BRK,  Facility Carried by Structure: HANSEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.5m (14.8ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Serious,  Channel: Serious,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $64,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $101,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 226777,  Location: 2 MI FROM NY ROUTE 23 (Lat: 42.495369,  Lng: -74.797150),  Route carried "on" structure: City street ,  Year Built: 1995,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 32 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 45 (year 2025),  Design Load: HS 20,  Features Intersected: CHARLOTTE CREEK,  Facility Carried by Structure: OLIVE BRANCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.8m (15.7ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.1m (16.7ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Poor,  Channel: Poor,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $347,000,  Roadway Improvement Cost: $206,000,  Total Project Cost: $553,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 335211,  Location: 3.7 MI E OF ONEONTA (Lat: 42.445222,  Lng: -74.963722),  Route carried "on" structure: County highway ,  Year Built: 1981,  Status: Open,  Structure Length: 4.84m (15.88ft),  Average Daily Traffic: 4,025 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,024 (year 2025),  Design Load: HS 20,  Features Intersected: CHARLOTTE CREEK,  Facility Carried by Structure: COUNTY ROAD 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Skew: 2 degrees,  Navigation Control: Yes ( Vertical Clearance: 4.8m (15.7ft), Horizontal Clearance: 12.1m (39.7ft)),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.4m (76.8ft),  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Good,  Operating Rating: 89.3 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.84m (15.88ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2006,  Underwater Inspection Date: October 2004,  Bridge Improvement Cost: $1,240,000,  Roadway Improvement Cost: $738,000,  Total Project Cost: $1,978,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 335212,  Location: 3.5 MI EAST OF ONEONTA (Lat: 42.446650,  Lng: -74.965664),  Route carried "on" structure: County highway ,  Year Built: 1981,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 1.03m (3.38ft),  Average Daily Traffic: 4,333 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,408 (year 2025),  Design Load: HS 25,  Features Intersected: TRB CHARLOTTE CRK,  Facility Carried by Structure: COUNTY ROAD 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $1,240,000,  Roadway Improvement Cost: $738,000,  Total Project Cost: $1,978,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 335213,  Location: .2 MI E TOWN OF DAVENPORT (Lat: 42.479819,  Lng: -74.817006),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 1.67m (5.48ft),  Average Daily Traffic: 971 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,150 (year 2025),  Design Load: HS 20+Mod,  Features Intersected: MIDDLE BROOK,  Facility Carried by Structure: COUNTY ROAD 9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.1m (52.8ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $1,240,000,  Roadway Improvement Cost: $738,000,  Total Project Cost: $1,978,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 335214,  Location: 1.7 MI NE OF DAVENPORT (Lat: 42.483117,  Lng: -74.815758),  Route carried "on" structure: County highway ,  Year Built: 1929,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 971 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,150 (year 2025),  Features Intersected: CHARLOTTE CREEK,  Facility Carried by Structure: BUTTS XING-OTS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $389,000,  Roadway Improvement Cost: $231,000,  Total Project Cost: $620,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 335215,  Location: 0.1 MI N OF DAVENPORT CEN (Lat: 42.450106,  Lng: -74.920611),  Route carried "on" structure: City street ,  Year Built: 1957,  Status: Open,  Structure Length: 1.88m (6.17ft),  Average Daily Traffic: 394 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 549 (year 2027),  Design Load: HS 20,  Features Intersected: CHARLOTTE CREEK,  Facility Carried by Structure: PINE LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.8m (15.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.9m (58.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $114,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $179,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 335216,  Location: 0.2 MI N OF DAVENPORT CEN (Lat: 42.451453,  Lng: -74.921931),  Route carried "on" structure: City street ,  Year Built: 1957,  Status: Open,  Structure Length: 1.03m (3.38ft),  Average Daily Traffic: 394 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 549 (year 2027),  Design Load: HS 20,  Features Intersected: CHARLOTTE CREEK,  Facility Carried by Structure: PINE LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.8m (15.7ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $205,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 335217,  Location: 2 MI NE DAVENPORT CENTER (Lat: 42.469106,  Lng: -74.885406),  Route carried "on" structure: City street ,  Year Built: 1998,  Status: Open,  Structure Length: 2.28m (7.48ft),  Average Daily Traffic: 203 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 283 (year 2025),  Design Load: HS 25,  Features Intersected: CHARLOTTE CREEK,  Facility Carried by Structure: HIGH POINT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.2m (72.8ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.28m (7.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $205,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 335218,  Location: 0.7 M NORTH OF RT23 INTER (Lat: 42.468628,  Lng: -74.885111),  Route carried "on" structure: Bypass City street ,  Year Built: 1997,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 203 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 283 (year 2025),  Design Load: HS 25,  Features Intersected: CHARLOTTE CREEK,  Facility Carried by Structure: HIGH POINT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $205,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 335219,  Location: 0.3 MI NW OF DAVENPORT (Lat: 42.476325,  Lng: -74.849631),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 741 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,033 (year 2025),  Design Load: HS 20,  Features Intersected: CHARLOTTE CREEK,  Facility Carried by Structure: MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.6m (80.7ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $205,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 33522,  Location: 0.8 MI NW FERGUSONVILLE (Lat: 42.499289,  Lng: -74.787981),  Route carried "on" structure: Bypass City street ,  Year Built: 1982,  Status: Open,  Structure Length: 1.76m (5.77ft),  Average Daily Traffic: 57 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 79 (year 2026),  Features Intersected: CHARLOTTE CREEK,  Facility Carried by Structure: JOHNSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.8m (15.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.4m (53.8ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.76m (5.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $205,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 336905,  Location: 0.1 MI W OF OTSEGO CO LNE (Lat: 42.504172,  Lng: -74.781694),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 100 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 118 ,  Design Load: HS 25,  Features Intersected: SIMPSONVILLE CRK,  Facility Carried by Structure: OTSEGO CO LINE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $146,000,  Roadway Improvement Cost: $87,000,  Total Project Cost: $233,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous

Discuss this city on our hugely popular New York forum

Back to: Davenport, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.