National Bridge Inventory (NBI) Statistics
Number of bridges: 46
Total length: 109 meters (358ft)
Total costs: $14,411,000
Total average daily traffic: 843,063
Total average daily truck traffic: 74,801
National Bridge Inventory (NBI) Registered Bridges for Draper

New bridges - Historical Statistics

  • 1930-1939: 2
  • 1940-1949: 2
  • 1950-1959: 1
  • 1960-1969: 4
  • 1970-1979: 5
  • 1980-1989: 4
  • 1990-1999: 17
  • 2000-2009: 11

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 35004E,  Location: IKEA WAY OVER SL CANAL (Lat: 40.509944,  Lng: -111.896669),  Route carried "on" structure: City street ,  Year Built: 2006,  Status: Open,  Structure Length: 5.43m (17.81ft),  Average Daily Traffic: 650 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 790 (year 2026),  Design Load: HS 20,  Features Intersected: SALT LAKE CANAL,  Facility Carried by Structure: COUNTY RD IKEA WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 26.5m (86.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.2m (46.6ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 26.5m (86.9ft),  Out-to-Out Width: 36.9m (121.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007
Find on map >>

Structure Number: 35015E,  Location: 12050 So. Highland Dr. (Lat: 40.530833,  Lng: -111.832778),  Route carried "on" structure: City street ,  Year Built: 2006,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 700 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 850 (year 2026),  Design Load: HS 20,  Features Intersected: TUSCANY CREEK,  Facility Carried by Structure: HIGHLAND DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007
Find on map >>

Structure Number: 35044F,  Location: 200 WEST 13800 SO.,DRAPER (Lat: 40.500722,  Lng: -111.896944),  Route carried "on" structure: City street ,  Year Built: 1995,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 1,000 (year 2002),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,215 (year 2022),  Design Load: HS 20,  Features Intersected: JORDAN & SALT LAKE CANAL,  Facility Carried by Structure: 13800 SOUTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $222,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $366,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 35046E,  Location: 500 EAST 11800 SO.,DRAPER (Lat: 40.537056,  Lng: -111.876722),  Route carried "on" structure: City street ,  Year Built: 1987,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 2,000 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,430 (year 2022),  Design Load: HS 20,  Features Intersected: EAST JORDAN CANAL,  Facility Carried by Structure: 11800 SOUTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $287,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $474,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35049D,  Location: 100 WEST 11400 SO.,DRAPER (Lat: 40.541500,  Lng: -111.897500),  Route carried "on" structure: City street ,  Year Built: 1935,  Status: Posted for load,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 8,320 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,109 (year 2022),  Features Intersected: JORDAN & SALT LAKE CANAL,  Facility Carried by Structure: 11400 SOUTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 24.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $105,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $174,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35056F,  Location: 450 WEST 12950 SO.,DRAPER (Lat: 40.516083,  Lng: -111.895833),  Route carried "on" structure: City street ,  Year Built: 1987,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 800 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 972 (year 2022),  Design Load: HS 20,  Features Intersected: JORDAN & SALT LAKE CANAL,  Facility Carried by Structure: 12950 SOUTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $167,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $276,000 ( Estimate for 2000),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 35057F,  Location: 150 EAST 11400 SO.,DRAPER (Lat: 40.544222,  Lng: -111.888694),  Route carried "on" structure: City street ,  Year Built: 1987,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 8,320 (year 2002),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,109 (year 2022),  Design Load: HS 20,  Features Intersected: EAST JORDAN CANAL,  Facility Carried by Structure: 11400 SOUTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 25.8m (84.6ft),  Out-to-Out Width: 31.4m (103.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $263,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $434,000 ( Estimate for 2000),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35076E,  Location: 650 EAST 11900 SO.,DRAPER (Lat: 40.534306,  Lng: -111.873303),  Route carried "on" structure: City street ,  Year Built: 1998,  Status: Open,  Structure Length: 0.84m (2.76ft),  Average Daily Traffic: 500 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 608 (year 2022),  Design Load: HS 20,  Features Intersected: EAST JORDAN CANAL,  Facility Carried by Structure: 11900 SOUTH STREET
Minimum Vertical Clearance: 99.90m (327.76ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.0m (26.2ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $105,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $174,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 35077D,  Location: 600 EAST 12000 SO.,DRAPER (Lat: 40.532472,  Lng: -111.872139),  Route carried "on" structure: City street ,  Year Built: 1981,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,000 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,215 (year 2022),  Design Load: HS 20,  Features Intersected: EAST JORDAN CANAL,  Facility Carried by Structure: 12000 SOUTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 2.6m (8.5ft),  Right: 2.6m (8.5ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $172,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $284,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 35078E,  Location: 710 EAST 12200 SO.,DRAPER (Lat: 40.528667,  Lng: -111.871167),  Route carried "on" structure: City street ,  Year Built: 1993,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 1,600 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,944 (year 2022),  Design Load: HS 20,  Features Intersected: EAST JORDAN CANAL,  Facility Carried by Structure: 12200 SOUTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 21.0m (68.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $330,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35079D,  Location: 750 EAST 12300 SO.,DRAPER (Lat: 40.526861,  Lng: -111.870861),  Route carried "on" structure: City street ,  Year Built: 1941,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 17,335 (year 2002),  Truck Traffic: 2%,  Average Future Daily Traffic: 21,062 (year 2022),  Design Load: H 15,  Features Intersected: EAST JORDAN CANAL,  Facility Carried by Structure: 12300 SOUTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 17.8m (58.4ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 17.9m (58.7ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 15.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $213,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $351,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35080E,  Location: 750 EAST 12500 SO.,DRAPER (Lat: 40.523139,  Lng: -111.870278),  Route carried "on" structure: City street ,  Year Built: 1998,  Status: Open,  Structure Length: 0.74m (2.43ft),  Average Daily Traffic: 600 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 729 (year 2022),  Design Load: HS 20,  Features Intersected: EAST JORDAN CANAL,  Facility Carried by Structure: 12500 SOUTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.0m (26.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $121,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $200,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 35081D,  Location: 750 EAST 13580 SO.,DRAPER (Lat: 40.504528,  Lng: -111.871167),  Route carried "on" structure: City street ,  Year Built: 1945,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 600 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 729 (year 2022),  Features Intersected: EAST JORDAN CANAL,  Facility Carried by Structure: 13580 SOUTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $139,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $230,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35114E,  Location: 13300 SO.130 EAST, DRAPER (Lat: 40.506917,  Lng: -111.885108),  Route carried "on" structure: City street ,  Year Built: 1998,  Status: Open,  Structure Length: 0.72m (2.36ft),  Average Daily Traffic: 1,000 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,215 (year 2022),  Design Load: HS 20,  Features Intersected: CORNER CANYON CREEK,  Facility Carried by Structure: 130 EAST STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.2m (36.7ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.6m (21.7ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $168,000 ( Estimate for 2000)
Find on map >>

Structure Number: 35124D,  Location: 500 EAST 13800 SO.,DRAPER (Lat: 40.500667,  Lng: -111.878000),  Route carried "on" structure: City street ,  Year Built: 1950,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 1,550 (year 2002),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,883 (year 2022),  Features Intersected: EAST JORDAN CANAL,  Facility Carried by Structure: 13800 SOUTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $124,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $204,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35147F,  Location: 100 WEST 12650 SO.,DRAPER (Lat: 40.521306,  Lng: -111.894028),  Route carried "on" structure: City street ,  Year Built: 1995,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 1,250 (year 2002),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,519 (year 2022),  Design Load: HS 20,  Features Intersected: JORDAN & SALT LAKE CANAL,  Facility Carried by Structure: 12650 SOUTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $227,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $375,000 ( Estimate for 2000),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 35155F,  Location: 100 WEST 12200 SO.,DRAPER (Lat: 40.529222,  Lng: -111.894750),  Route carried "on" structure: City street ,  Year Built: 1994,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 1,200 (year 2003),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,458 (year 2023),  Design Load: HS 20,  Features Intersected: JORDAN & SALT LAKE CANAL,  Facility Carried by Structure: 12200 SOUTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $330,000 ( Estimate for 2000),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35156D,  Location: 12000 SO. LONE PEAK PRK. (Lat: 40.530861,  Lng: -111.895889),  Route carried "on" structure: City street ,  Year Built: 1994,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,000 (year 2003),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,215 (year 2023),  Design Load: HS 20,  Features Intersected: JORDAN & SALT LAKE CANAL,  Facility Carried by Structure: LONE PEAK PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $187,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $309,000 ( Estimate for 2000),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35164D,  Location: 11700 SO.300 E.,DRAPER (Lat: 40.538528,  Lng: -111.881722),  Route carried "on" structure: City street ,  Year Built: 1998,  Status: Open,  Structure Length: 0.86m (2.82ft),  Average Daily Traffic: 1,000 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,215 (year 2023),  Design Load: HS 20,  Features Intersected: EAST JORDAN CANAL,  Facility Carried by Structure: 300 EAST STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $168,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $278,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 35165D,  Location: 13050 SO. 900 E.,DRAPER (Lat: 40.513028,  Lng: -111.867861),  Route carried "on" structure: City street ,  Year Built: 1998,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,000 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,215 (year 2023),  Design Load: HS 20,  Features Intersected: EAST JORDAN CANAL,  Facility Carried by Structure: GOLDEN PHEASANT DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.8m (22.3ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $146,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $242,000 ( Estimate for 2000),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35170V,  Location: APP.600 E.14400 S.,DRAPER (Lat: 40.489667,  Lng: -111.873694),  Route carried "on" structure: City street ,  Year Built: 1996,  Status: Open,  Structure Length: 0.71m (2.33ft),  Average Daily Traffic: 2,500 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,038 (year 2022),  Design Load: HS 20,  Features Intersected: EQUESTRIAN & PED. PATH,  Facility Carried by Structure: N.VESTRY RD.RND-AB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.7m (28.5ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Culverts: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $120,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $198,000 ( Estimate for 2000),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35171V,  Location: APP.600 E.14400 S.,DRAPER (Lat: 40.489694,  Lng: -111.874028),  Route carried "on" structure: City street ,  Year Built: 1996,  Status: Open,  Structure Length: 0.71m (2.33ft),  Average Daily Traffic: 2,500 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,038 (year 2023),  Design Load: HS 20,  Features Intersected: EQUESTRIAN & PED. PATH,  Facility Carried by Structure: S.VESTER RD.RND-AB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.7m (28.5ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Culverts: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $120,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $198,000 ( Estimate for 2000),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35172V,  Location: APP.1 MI. E. OF RR BRIDGE (Lat: 40.505139,  Lng: -111.846139),  Route carried "on" structure: City street ,  Year Built: 1994,  Status: Open,  Structure Length: 0.72m (2.36ft),  Average Daily Traffic: 500 (year 2002),  Truck Traffic: 2%,  Average Future Daily Traffic: 608 (year 2022),  Design Load: HS 20,  Features Intersected: CORNER CANYON CREEK,  Facility Carried by Structure: HIGHLAND DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 28.4m (93.2ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.2m (23.6ft),  Curb-To-Curb Width: 28.4m (93.2ft),  Out-to-Out Width: 45.1m (148.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $396,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $654,000 ( Estimate for 2000),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35173D,  Location: 100 W.12280 SO., DRAPER (Lat: 40.527667,  Lng: -111.893528),  Route carried "on" structure: City street ,  Year Built: 1996,  Status: Open,  Structure Length: 0.72m (2.36ft),  Average Daily Traffic: 400 (year 2003),  Truck Traffic: 2%,  Average Future Daily Traffic: 486 (year 2023),  Features Intersected: JORDAN & SALT LAKE CANAL,  Facility Carried by Structure: 12280 SOUTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $96,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $159,000 ( Estimate for 2000),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35174D,  Location: 850 EAST 13500 SO.,DRAPER (Lat: 40.506417,  Lng: -111.870278),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 0.83m (2.72ft),  Average Daily Traffic: 500 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 608 (year 2023),  Design Load: HS 20,  Features Intersected: EAST JORDAN CANAL,  Facility Carried by Structure: OLD ENGLISH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.8m (25.6ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 20.6m (67.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $198,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $327,000 ( Estimate for 2000),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 35180E,  Location: 11550 SOUTH 300 WEST (Lat: 40.906639,  Lng: -112.506944),  Route carried "on" structure: Business City street ,  Year Built: 2004,  Status: Open,  Structure Length: 1.82m (5.97ft),  Average Daily Traffic: 1,025 (year 2002),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,245 (year 2022),  Design Load: HS 20,  Features Intersected: SALT LAKE-JORDAN CANAL,  Facility Carried by Structure: LONE PEAK PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.0m (49.2ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 15.0m (49.2ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007
Find on map >>

Structure Number: 35189E,  Location: 12780 South 900 East (Lat: 40.518861,  Lng: -111.866667),  Route carried "on" structure: City street ,  Year Built: 2006,  Status: Open,  Structure Length: 0.74m (2.43ft),  Average Daily Traffic: 400 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 430 (year 2026),  Design Load: H 20,  Features Intersected: Canal,  Facility Carried by Structure: WILLOW SPRINGS LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.7m (28.5ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.8m (22.3ft),  Curb or Sidewalk Widths: Left: 3.1m (10.2ft),  Right: 0.0m,  Curb-To-Curb Width: 8.7m (28.5ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007
Find on map >>

Structure Number: C 819,  Location: 13600 SO.& I-15 IN DRAPER (Lat: 40.504167,  Lng: -111.891417),  Route carried "on" structure: State highway 154,  Year Built: 1998,  Status: Open,  Structure Length: 5.57m (18.27ft),  Average Daily Traffic: 27,590 (year 2002),  Truck Traffic: 6%,  Average Future Daily Traffic: 33,522 (year 2022),  Design Load: HS 25,  Features Intersected: I-15 (SR-15), NBL & SBL
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 0.752,  Lanes on structure: 6,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 38.4m (126.0ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 39.8m (130.6ft),  Out-to-Out Width: 40.7m (133.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.60m (21.65ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,733,000,  Roadway Improvement Cost: $173,000,  Total Project Cost: $2,859,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: D 41,  Location: 12100 SO.700 E., DRAPER (Lat: 40.530694,  Lng: -111.871111),  Route carried "on" structure: State highway 71,  Year Built: 1936,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 10,135 (year 2002),  Truck Traffic: 2%,  Average Future Daily Traffic: 12,314 (year 2022),  Design Load: H 15,  Features Intersected: EAST JORDAN CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.259,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $181,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $299,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: E1767,  Location: 2.4 MI.SO.DRAPER INTCHG. (Lat: 40.492250,  Lng: -111.892028),  Route carried "on" structure: Interstate 15,  Year Built: 1971,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 121,964 (year 2002),  Truck Traffic: 11%,  Average Future Daily Traffic: 148,186 (year 2022),  Design Load: HS 20,  Features Intersected: EAST JORDAN CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 465.258,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.1m (111.9ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $306,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $506,000 ( Estimate for 2001)
Find on map >>

Structure Number: E2475,  Location: 550 W.14600 SO. in DRAPER (Lat: 40.486111,  Lng: -111.906583),  Route carried "on" structure: State highway 140,  Year Built: 2002,  Status: Open,  Structure Length: 1.02m (3.35ft),  Average Daily Traffic: 4,795 (year 2002),  Truck Traffic: 11%,  Average Future Daily Traffic: 5,826 (year 2022),  Design Load: HS 20,  Features Intersected: EAST JORDAN CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.2m (43.3ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.5m (31.2ft),  Curb-To-Curb Width: 21.6m (70.9ft),  Out-to-Out Width: 22.8m (74.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: E2507,  Location: On 12300 S.just W.of I-15 (Lat: 40.523650,  Lng: -111.921819),  Route carried "on" structure: State highway 71,  Year Built: 2004,  Status: Open,  Structure Length: 0.68m (2.23ft),  Average Daily Traffic: 29,510 (year 2002),  Truck Traffic: 3%,  Average Future Daily Traffic: 35,855 (year 2022),  Design Load: HS 25,  Features Intersected: JORDAN & SALT LAKE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.810,  Lanes on structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 37.7m (123.7ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 37.7m (123.7ft),  Out-to-Out Width: 44.7m (146.7ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 43.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007
Find on map >>

Structure Number: 1F 56,  Location: 150 W.11400 SO.-DRAPER (Lat: 40.544194,  Lng: -111.894472),  Route carried "on" structure: Interstate 15,  Year Built: 1967,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 61,108 (year 2002),  Truck Traffic: 11%,  Average Future Daily Traffic: 74,246 (year 2022),  Design Load: HS 20,  Features Intersected: 11400 SOUTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 470.888,  Lanes on structure: 5,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.2m (82.7ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 25.8m (84.6ft),  Out-to-Out Width: 26.7m (87.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $525,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $867,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 1F 207,  Location: BLUFFDALE RD.INTERCHANGE (Lat: 40.483611,  Lng: -111.898889),  Route carried "on" structure: Interstate 15,  Year Built: 1971,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 58,914 (year 2002),  Truck Traffic: 11%,  Average Future Daily Traffic: 71,581 (year 2022),  Design Load: HS 20,  Features Intersected: SR-140,BLUFFDALE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 463.929,  Lanes on structure: 4,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.5m (77.1ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 23.8m (78.1ft),  Out-to-Out Width: 24.7m (81.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.00m (19.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $690,000,  Roadway Improvement Cost: $69,000,  Total Project Cost: $1,139,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 1F 694,  Location: At the DRAPER X-ROADS.INT (Lat: 40.526667,  Lng: -111.890833),  Route carried "on" structure: Interstate 15,  Year Built: 2004,  Status: Open,  Structure Length: 6.27m (20.57ft),  Average Daily Traffic: 61,108 (year 2002),  Truck Traffic: 11%,  Average Future Daily Traffic: 74,246 (year 2022),  Design Load: HS 25,  Features Intersected: SR-71, INTCHG. X-ROAD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 468.895,  Lanes on structure: 5,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.5m (83.7ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 58.1m (190.6ft),  Curb-To-Curb Width: 25.5m (83.7ft),  Out-to-Out Width: 27.0m (88.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 42.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 3F 56,  Location: 150 W.11400 SO.-DRAPER (Lat: 40.544389,  Lng: -111.895108),  Route carried "on" structure: Interstate 15,  Year Built: 1967,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 61,107 (year 2002),  Truck Traffic: 11%,  Average Future Daily Traffic: 74,245 (year 2022),  Design Load: HS 20,  Features Intersected: 11400 SOUTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 470.897,  Lanes on structure: 5,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.2m (82.7ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 25.7m (84.3ft),  Out-to-Out Width: 26.6m (87.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $525,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $867,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 3F 207,  Location: BLUFFDALE RD. INTERCHANGE (Lat: 40.747333,  Lng: -111.902444),  Route carried "on" structure: Interstate 15,  Year Built: 1971,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 58,914 (year 2002),  Truck Traffic: 11%,  Average Future Daily Traffic: 71,581 (year 2022),  Design Load: HS 20,  Features Intersected: SR-140, BLUFFDALE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 463.942,  Lanes on structure: 5,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.0m (88.6ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 27.6m (90.6ft),  Out-to-Out Width: 28.5m (93.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.00m (19.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $690,000,  Roadway Improvement Cost: $69,000,  Total Project Cost: $1,139,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 3F 694,  Location: At the DRAPER X-ROADS.INT (Lat: 40.526667,  Lng: -111.891389),  Route carried "on" structure: Interstate 15,  Year Built: 2004,  Status: Open,  Structure Length: 6.27m (20.57ft),  Average Daily Traffic: 61,108 (year 2002),  Truck Traffic: 11%,  Average Future Daily Traffic: 74,246 (year 2022),  Design Load: HS 25,  Features Intersected: SR-71, INTCHG. X-ROADS.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 468.895,  Lanes on structure: 5,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.5m (83.7ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 58.1m (190.6ft),  Curb-To-Curb Width: 25.5m (83.7ft),  Out-to-Out Width: 27.0m (88.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 42.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: C 819,  Location: 13600 SO.& I-15 IN DRAPER (Lat: 40.504167,  Lng: -111.891417),  Route carried "under" structure: Interstate 15,  Year Built: 1998,  Structure Length: 5.57m (18.27ft),  Average Daily Traffic: 121,960 (year 2002),  Truck Traffic: 11%,  Features Intersected: I-15 (SR-15), NBL & SBL
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 466.439,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>

Structure Number: F 696,  Location: 500 WEST 12300 SOUTH (Lat: 40.526611,  Lng: -111.904944),  Route carried "under" structure: State highway 71,  Year Built: 2004,  Structure Length: 3.58m (11.75ft),  Average Daily Traffic: 29,510 (year 2002),  Truck Traffic: 3%,  Features Intersected: SR-71, 12300 SOUTH ST.,  Facility Carried by Structure: UNION PACIFIC RR.
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 0.686,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>

Structure Number: 1F 56,  Location: 150 W.11400 SO.-DRAPER (Lat: 40.544194,  Lng: -111.894472),  Route carried "under" structure: City street ,  Year Built: 1967,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 8,320 (year 2002),  Truck Traffic: 5%,  Features Intersected: 11400 SOUTH STREET,  Facility Carried by Structure: I-15 (SR-15) NBL
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 11.9m (39.0ft)

Find on map >>

Structure Number: 1F 207,  Location: BLUFFDALE RD.INTERCHANGE (Lat: 40.483611,  Lng: -111.898889),  Route carried "under" structure: State highway 140,  Year Built: 1971,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 2,875 (year 2002),  Truck Traffic: 11%,  Features Intersected: SR-140,BLUFFDALE ROAD,  Facility Carried by Structure: I-15 (SR-15) NBL
Minimum Vertical Clearance: 0.50m (1.64ft),  Kilometerpoint: 4.023,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.0m (59.1ft)

Find on map >>

Structure Number: 1F 694,  Location: At the DRAPER X-ROADS.INT (Lat: 40.526667,  Lng: -111.890833),  Route carried "under" structure: State highway 71,  Year Built: 2004,  Structure Length: 6.27m (20.57ft),  Average Daily Traffic: 29,510 (year 2002),  Truck Traffic: 2%,  Features Intersected: SR-71, INTCHG. X-ROAD.,  Facility Carried by Structure: I-15 (SR-15) NB.
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 8.016,  Lanes on structure: 5,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 58.1m (190.6ft)

Find on map >>

Structure Number: 3F 56,  Location: 150 W.11400 SO.-DRAPER (Lat: 40.544389,  Lng: -111.895108),  Route carried "under" structure: City street ,  Year Built: 1967,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 3,000 (year 2002),  Truck Traffic: 5%,  Features Intersected: 11400 SOUTH STREET,  Facility Carried by Structure: I-15 (SR-15) SBL
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 11.9m (39.0ft)

Find on map >>

Structure Number: 3F 207,  Location: BLUFFDALE RD. INTERCHANGE (Lat: 40.747333,  Lng: -111.902444),  Route carried "under" structure: State highway 140,  Year Built: 1971,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 2,875 (year 2002),  Truck Traffic: 11%,  Features Intersected: SR-140, BLUFFDALE ROAD,  Facility Carried by Structure: I-15 (SR-15) SBL
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 0.399,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>

Structure Number: 3F 694,  Location: At the DRAPER X-ROADS.INT (Lat: 40.526667,  Lng: -111.891389),  Route carried "under" structure: State highway 71,  Year Built: 2004,  Structure Length: 6.27m (20.57ft),  Average Daily Traffic: 29,510 (year 2002),  Truck Traffic: 2%,  Features Intersected: SR-71, INTCHG. X-ROADS.,  Facility Carried by Structure: I-15 (SR-15) SB
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 7.992,  Lanes on structure: 5,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 58.1m (190.6ft)

Discuss this city on our hugely popular Utah forum

Back to: Draper, UT, Utah, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.