![]() |
Bridge Statistics for Dummerston, Vermont (VT) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Dummerston, VT, Vermont, Vermont forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 11 Total length: 30 meters (98ft) Total costs: $9,621,000 Total average daily traffic: 50,680 Total average daily truck traffic: 5,603 Total future (year 2015) average daily traffic: 76,020 National Bridge Inventory (NBI) Registered Bridges for Dummerston
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Bridge Condition - Culverts Find on map >>
Structure Number: 101305002913051, Location: 0.6 MI TO JCT W CL3 TH18 (Lat: 42.934722, Lng: -72.561944), Route carried "on" structure: Other road C2001, Year Built: 1935, Status: Posted for load, Structure Length: 1.40m (4.59ft), Average Daily Traffic: 1,000 (year 2000), Truck Traffic: 3%, Average Future Daily Traffic: 1,500 (year 2020), Design Load: H 15, Features Intersected: SALMON BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.8m (42.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 7.1m (23.3ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Channel: Good, Operating Rating: 46.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 25.2 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Meets minimum limits, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below), Length Of Structure Improvement: 2.26m (7.41ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $508,000, Roadway Improvement Cost: $150,000, Total Project Cost: $658,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 101305003313051, Location: 0.58 MI TO JCT W VT30 (Lat: 42.909444, Lng: -72.619444), Route carried "on" structure: Other road C3047, Year Built: 1994, Status: Open, Structure Length: 0.94m (3.08ft), Average Daily Traffic: 20 (year 2000), Truck Traffic: 10%, Average Future Daily Traffic: 30 (year 2020), Features Intersected: STICKNEY BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 4.6m (15.1ft), Skew: 4 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.8m (28.9ft), Curb-To-Curb Width: 4.9m (16.1ft), Out-to-Out Width: 5.4m (17.7ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Good, Operating Rating: 68.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 40.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.52m (4.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $258,000, Roadway Improvement Cost: $150,000, Total Project Cost: $408,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 101305003513051, Location: 0.02 MI TO JCT W VT30 (Lat: 42.936667, Lng: -72.612778), Route carried "on" structure: Other road C2001, Year Built: 1872, Year Reconstructed: 1998, Status: Posted for load-capacity, Structure Length: 8.20m (26.90ft), Average Daily Traffic: 1,200 (year 2000), Truck Traffic: 3%, Average Future Daily Traffic: 1,800 (year 2020), Design Load: HS 20, Features Intersected: WEST RIVER Minimum Vertical Clearance: 3.53m (11.58ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Wood or Timber, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 2, Length of Maximum Span: 42.7m (140.1ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 0.9m (3.0ft), Curb-To-Curb Width: 3.7m (12.1ft), Out-to-Out Width: 5.5m (18.0ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Very good, Operating Rating: 9.0 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 9.0 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: High priority of replacement, Deck Geometry: High priority of replacement, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 9.02m (29.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $1,577,000, Roadway Improvement Cost: $150,000, Total Project Cost: $1,727,000 ( Estimate for 2007), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Wood or Timber, Deck Protection: Internally Sealed Find on map >>
Structure Number: 101305003613051, Location: @ JCT W CL2 TH3 (Lat: 42.931944, Lng: -72.552222), Route carried "on" structure: Other road C2001, Year Built: 1937, Status: Posted for load, Structure Length: 3.57m (11.71ft), Average Daily Traffic: 650 (year 2000), Truck Traffic: 3%, Average Future Daily Traffic: 975 (year 2020), Design Load: H 15, Features Intersected: SALMON BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 19.2m (63.0ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 7.1m (23.3ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 54.0 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below), Length Of Structure Improvement: 4.27m (14.01ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $972,000, Roadway Improvement Cost: $150,000, Total Project Cost: $1,122,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 101305003713051, Location: .01 M EAST OF VT 30 (Lat: 42.916389, Lng: -72.613333), Route carried "on" structure: Other road C3062, Year Built: 1919, Status: Closed, Structure Length: 6.16m (20.21ft), Average Daily Traffic: 200 (year 1995), Truck Traffic: 2%, Average Future Daily Traffic: 300 (year 2015), Features Intersected: WEST RIVER Minimum Vertical Clearance: 6.05m (19.85ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Town or Township Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 1, Length of Maximum Span: 60.4m (198.2ft), Curb-To-Curb Width: 3.6m (11.8ft), Out-to-Out Width: 4.3m (14.1ft) Condition: Deck: Fair, Superstructure: Critical, Substructure: Satisfactory, Channel: Very good, Approach Roadway Alignment: Better than present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 6.77m (22.21ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: July 2006, Critical Feature Inspection Date: August 1996, Bridge Improvement Cost: $921,000, Roadway Improvement Cost: $150,000, Total Project Cost: $1,071,000 ( Estimate for 2007), Deck Structure Type: Open Grating Find on map >>
Structure Number: 101305003913051, Location: 0.05 MI TO JCT W C3 TH47 (Lat: 42.907500, Lng: -72.620278), Route carried "on" structure: Other road C3071, Year Built: 1991, Status: Open, Structure Length: 0.98m (3.22ft), Average Daily Traffic: 10 (year 2000), Truck Traffic: 2%, Average Future Daily Traffic: 15 (year 2020), Features Intersected: STICKNEY BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Town or Township Highway Agency, Approaching Roadway Width: 3.7m (12.1ft), Material/Design: Wood or Timber, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.1m (29.9ft), Curb-To-Curb Width: 3.4m (11.2ft), Out-to-Out Width: 4.9m (16.1ft) Condition: Deck: Fair, Superstructure: Serious, Substructure: Very good, Channel: Good, Operating Rating: 7.2 metric tons, Inventory Rating: 7.2 metric tons, Structural Evaluation: High priority of replacement, Deck Geometry: High priority of corrective action, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below), Length Of Structure Improvement: 1.55m (5.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $242,000, Roadway Improvement Cost: $150,000, Total Project Cost: $392,000 ( Estimate for 2007), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Wood or Timber Find on map >>
Structure Number: 200015000513052, Location: 5.4 MI N JCT. U.S.5 (Lat: 42.915278, Lng: -72.613056), Route carried "on" structure: State highway 30, Year Built: 1952, Year Reconstructed: 1972, Status: Open, Structure Length: 2.56m (8.40ft), Average Daily Traffic: 5,300 (year 1998), Truck Traffic: 9%, Average Future Daily Traffic: 7,950 (year 2018), Design Load: H 20, Features Intersected: STICKNEY BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 8.439, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 9.8m (32.2ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 25.0m (82.0ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 9.5m (31.2ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Fair, Superstructure: Very good, Substructure: Good, Channel: Satisfactory, Operating Rating: 41.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 18.9 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.32m (10.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $1,011,000, Roadway Improvement Cost: $150,000, Total Project Cost: $1,161,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200015000913052, Location: 8.9 MI N JCT. U.S.5 (Lat: 42.947222, Lng: -72.641389), Route carried "on" structure: State highway 30, Year Built: 1972, Status: Open, Structure Length: 4.72m (15.49ft), Average Daily Traffic: 5,300 (year 1998), Truck Traffic: 9%, Average Future Daily Traffic: 7,950 (year 2018), Design Load: HS 20, Features Intersected: ROCK RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 14.232, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 45.7m (149.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 11.9m (39.0ft), Out-to-Out Width: 13.1m (43.0ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Channel: Good, Operating Rating: 72.9 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 33.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.67m (18.60ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $2,103,000, Roadway Improvement Cost: $150,000, Total Project Cost: $2,253,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 20009112-613052, Location: 2.4 MI S EXIT 4 (Lat: 42.934722, Lng: -72.527778), Route carried "on" structure: Interstate 91, Year Built: 1961, Status: Open, Structure Length: 0.61m (2.00ft), Average Daily Traffic: 16,700 (year 1998), Truck Traffic: 13%, Average Future Daily Traffic: 25,050 (year 2018), Design Load: HS 20, Features Intersected: SALMON BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 25.068, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 23.2m (76.1ft), Skew: 10 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 6.1m (20.0ft) Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 54.0 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.61m (2.00ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $281,000, Roadway Improvement Cost: $25,000, Total Project Cost: $306,000 ( Estimate for 2007) Find on map >>
Structure Number: 20009112-913052, Location: 1.5 MI S EXIT 4 (Lat: 42.946111, Lng: -72.532222), Route carried "on" structure: Interstate 91, Year Built: 1961, Status: Open, Structure Length: 0.61m (2.00ft), Average Daily Traffic: 16,700 (year 1998), Truck Traffic: 13%, Average Future Daily Traffic: 25,050 (year 2018), Design Load: HS 20, Features Intersected: CANOE BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 26.452, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 23.2m (76.1ft), Skew: 11 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 6.1m (20.0ft) Condition: Channel: Good, Culverts: Satisfactory, Operating Rating: 54.0 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.61m (2.00ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $281,000, Roadway Improvement Cost: $25,000, Total Project Cost: $306,000 ( Estimate for 2007) Find on map >>
Structure Number: 200113001113052, Location: 3.5 MI N JCT. VT.9 E (Lat: 42.931667, Lng: -72.536111), Route carried "on" structure: US 5, Year Built: 1939, Status: Open, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 3,600 (year 1998), Truck Traffic: 6%, Average Future Daily Traffic: 5,400 (year 2018), Design Load: H 15, Features Intersected: SALMON BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 11.3m (37.1ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.5m (27.9ft) Condition: Channel: Fair, Culverts: Satisfactory, Operating Rating: 54.0 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.85m (2.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $192,000, Roadway Improvement Cost: $25,000, Total Project Cost: $217,000 ( Estimate for 2007) Discuss this city on our hugely popular Vermont forum Back to: Dummerston, VT, Vermont, All US cities.
|
![]() |