![]() |
Bridge Statistics for Dyersburg, Tennessee (TN) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Dyersburg, TN, Tennessee, Tennessee forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 28 Total length: 192 meters (630ft) Total costs: $30,391,000 Total average daily traffic: 287,090 Total average daily truck traffic: 26,553 National Bridge Inventory (NBI) Registered Bridges for Dyersburg
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Bridge Condition - Culverts Find on map >>
Structure Number: 230A8290001, Location: 1.9 MI NW JCT SR20&SR104 (Lat: 36.049639, Lng: -89.363250), Route carried "on" structure: City street 829, Year Built: 1993, Status: Open, Structure Length: 1.10m (3.61ft), Average Daily Traffic: 4,620 (year 2007), Truck Traffic: 1%, Average Future Daily Traffic: 7,392 (year 2028), Design Load: HS 20, Features Intersected: BRANCH Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.432, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Skew: 3 degrees, Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.7m (12.1ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006 Find on map >>
Structure Number: 230A8290003, Location: 1.9 MI NW JCT SR20&SR104 (Lat: 36.089639, Lng: -89.356583), Route carried "on" structure: City street 829, Year Built: 1998, Status: Open, Structure Length: 3.70m (12.14ft), Average Daily Traffic: 4,620 (year 2007), Truck Traffic: 1%, Average Future Daily Traffic: 7,392 (year 2028), Design Load: HS 20, Features Intersected: IC RAILROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 11.9m (39.0ft), Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 23.0m (75.5ft), Curb or Sidewalk Widths: Left: 2.0m (6.6ft), Right: 2.0m (6.6ft), Curb-To-Curb Width: 8.7m (28.5ft), Out-to-Out Width: 13.2m (43.3ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.70m (12.14ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $220,000, Roadway Improvement Cost: $23,000, Total Project Cost: $331,000 ( Estimate for 2008), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 23I01550026, Location: NORTH DYERSBURG (Lat: 36.068833, Lng: -89.397056), Route carried "on" structure: Interstate 155, Year Built: 1979, Status: Open, Structure Length: 6.92m (22.70ft), Average Daily Traffic: 14,050 (year 2007), Truck Traffic: 29%, Average Future Daily Traffic: 24,000 (year 2028), Design Load: HS 20, Features Intersected: I155 / SR 78 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 20.986, Lanes on structure: 3, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Skew: 10 degrees, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 2, Length of Maximum Span: 36.6m (120.1ft), Curb-To-Curb Width: 15.2m (49.9ft), Out-to-Out Width: 15.8m (51.8ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 23I01550035, Location: JUNCTION OF I-155 AND SR3 (Lat: 36.073000, Lng: -89.347194), Route carried "on" structure: State highway 3, Year Built: 1979, Year Reconstructed: 1997, Status: Open, Structure Length: 6.74m (22.11ft), Average Daily Traffic: 10,780 (year 2007), Truck Traffic: 20%, Average Future Daily Traffic: 18,416 (year 2028), Design Load: HS 20, Features Intersected: SR 3 / I155 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 20.133, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes (Inventory Route: 23SR0030, Subroute: 1), Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 1 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 2, Length of Maximum Span: 34.7m (113.8ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 9.8m (32.2ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 23I01550036, Location: JUNCTION OF I-155 & SR 3 (Lat: 36.072861, Lng: -89.347389), Route carried "on" structure: State highway 3, Year Built: 1979, Year Reconstructed: 1997, Status: Open, Structure Length: 6.74m (22.11ft), Average Daily Traffic: 10,780 (year 2007), Truck Traffic: 20%, Average Future Daily Traffic: 18,416 (year 2028), Design Load: HS 20, Features Intersected: SR 3 / I155 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 20.133, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes (Inventory Route: 23SR0030, Subroute: 1), Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 1 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 2, Length of Maximum Span: 34.7m (113.8ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 9.8m (32.2ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 6.74m (22.11ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $300,000, Roadway Improvement Cost: $31,000, Total Project Cost: $451,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 23M29260001, Location: IN DYERSBURG (Lat: 36.043917, Lng: -89.349583), Route carried "on" structure: City street 2926, Year Built: 1982, Status: Open, Structure Length: 2.83m (9.28ft), Average Daily Traffic: 1,850 (year 2007), Truck Traffic: 2%, Average Future Daily Traffic: 2,960 (year 2028), Design Load: HS 20, Features Intersected: LEWIS CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.154, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Number Of Spans In Main Unit: 3, Length of Maximum Span: 9.4m (30.8ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 11.1m (36.4ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Satisfactory, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 23S82400001, Location: 0.1 MI N OF DYERSBURG (Lat: 36.058556, Lng: -89.380472), Route carried "on" structure: City street 1433, Year Built: 1960, Status: Open, Structure Length: 0.70m (2.30ft), Average Daily Traffic: 9,590 (year 2007), Truck Traffic: 14%, Average Future Daily Traffic: 15,344 (year 2028), Design Load: H 15, Features Intersected: BRANCH Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.241, Lanes on structure: 4, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 10.4m (34.1ft), Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft) Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.70m (2.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $132,000, Roadway Improvement Cost: $14,000, Total Project Cost: $199,000 ( Estimate for 2008) Find on map >>
Structure Number: 23S82400003, Location: 0.6 MI N OF DYERSBURG (Lat: 36.064389, Lng: -89.379583), Route carried "on" structure: City street 1433, Year Built: 1990, Status: Open, Structure Length: 5.24m (17.19ft), Average Daily Traffic: 9,590 (year 2007), Truck Traffic: 14%, Average Future Daily Traffic: 15,344 (year 2028), Design Load: HS 20, Features Intersected: LEWIS CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.966, Lanes on structure: 4, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 21.9m (71.9ft), Skew: 3 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 17.7m (58.1ft), Curb-To-Curb Width: 21.9m (71.9ft), Out-to-Out Width: 22.6m (74.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Membrane: Epoxy, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 23SR0030005, Location: IN DYERSBURG (Lat: 36.022722, Lng: -89.389611), Route carried "on" structure: State highway 211, Year Built: 1933, Year Reconstructed: 1991, Status: Open, Structure Length: 16.52m (54.20ft), Average Daily Traffic: 8,200 (year 2007), Truck Traffic: 5%, Average Future Daily Traffic: 14,976 (year 2028), Design Load: H 15, Features Intersected: OVERFLOW Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.108, Lanes on structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 17.7m (58.1ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 19, Length of Maximum Span: 8.8m (28.9ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 16.2m (53.1ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Channel: Good, Operating Rating: 63.9 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 17.26m (56.63ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $4,094,000, Roadway Improvement Cost: $410,000, Total Project Cost: $6,142,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 23SR0030007, Location: IN DYERSBURG (Lat: 36.028111, Lng: -89.387083), Route carried "on" structure: State highway 211, Year Built: 1933, Year Reconstructed: 1991, Status: Open, Structure Length: 19.96m (65.49ft), Average Daily Traffic: 8,200 (year 2007), Truck Traffic: 5%, Average Future Daily Traffic: 14,976 (year 2028), Design Load: H 15, Features Intersected: N. FORK FORKED DEER RIVE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.752, Lanes on structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 17.7m (58.1ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 15, Length of Maximum Span: 24.4m (80.1ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 16.0m (52.5ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Channel: Satisfactory, Operating Rating: 36.9 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 27.0 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 20.48m (67.19ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $5,469,000, Roadway Improvement Cost: $547,000, Total Project Cost: $8,204,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 23SR0030009, Location: NEAR DYERSBURG (Lat: 36.053778, Lng: -89.361583), Route carried "on" structure: State highway 3, Year Built: 1923, Year Reconstructed: 1953, Status: Open, Structure Length: 3.41m (11.19ft), Average Daily Traffic: 14,250 (year 2007), Truck Traffic: 5%, Average Future Daily Traffic: 25,472 (year 2028), Design Load: HS 20, Features Intersected: LEWIS CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 17.172, Lanes on structure: 5, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 25.6m (84.0ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 11.6m (38.1ft), Curb-To-Curb Width: 25.3m (83.0ft), Out-to-Out Width: 26.3m (86.3ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Satisfactory, Operating Rating: 66.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Deck Protection: Cathodic Protection Find on map >>
Structure Number: 23SR0030011, Location: NEAR DYERSBURG (Lat: 36.055222, Lng: -89.359583), Route carried "on" structure: State highway 3, Year Built: 1980, Status: Open, Structure Length: 1.98m (6.50ft), Average Daily Traffic: 14,250 (year 2007), Truck Traffic: 5%, Average Future Daily Traffic: 25,472 (year 2028), Design Load: HS 20, Features Intersected: BRANCH Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 17.397, Lanes on structure: 5, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 25.6m (84.0ft), Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 4, Length of Maximum Span: 4.6m (15.1ft), Curb-To-Curb Width: 24.8m (81.4ft), Out-to-Out Width: 25.7m (84.3ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 23SR0030039, Location: 0.5 MI SE JCT I155 SR3 (Lat: 36.066222, Lng: -89.342861), Route carried "on" structure: State highway 3, Year Built: 1984, Status: Open, Structure Length: 8.41m (27.59ft), Average Daily Traffic: 10,780 (year 2007), Truck Traffic: 5%, Average Future Daily Traffic: 18,416 (year 2028), Design Load: HS 20, Features Intersected: SR 3 / SR 211 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 19.296, Lanes on structure: 3, Lanes under structure: 4, Base Highway Network: Yes (Inventory Route: 23SR0030, Subroute: 1), Owner: State Highway Agency, Approaching Roadway Width: 15.2m (49.9ft), Skew: 1 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Number Of Spans In Main Unit: 4, Length of Maximum Span: 30.2m (99.1ft), Curb-To-Curb Width: 15.2m (49.9ft), Out-to-Out Width: 15.8m (51.8ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Good, Operating Rating: 74.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 23SR003004, Location: 0.5 MI SE JCT I155 SR3 (Lat: 36.065806, Lng: -89.343306), Route carried "on" structure: State highway 3, Year Built: 1984, Status: Open, Structure Length: 8.41m (27.59ft), Average Daily Traffic: 10,780 (year 2007), Truck Traffic: 5%, Average Future Daily Traffic: 18,416 (year 2028), Design Load: HS 20, Features Intersected: SR 3 / SR 211 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 19.296, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes (Inventory Route: 23SR0030, Subroute: 1), Owner: State Highway Agency, Approaching Roadway Width: 15.2m (49.9ft), Skew: 1 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Number Of Spans In Main Unit: 4, Length of Maximum Span: 30.2m (99.1ft), Curb-To-Curb Width: 15.2m (49.9ft), Out-to-Out Width: 15.8m (51.8ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Good, Operating Rating: 74.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 23SR0034001, Location: S.OF SR 20 (Lat: 36.020306, Lng: -89.404722), Route carried "on" structure: US 412, Year Built: 1959, Status: Open, Structure Length: 9.54m (31.30ft), Average Daily Traffic: 11,990 (year 2007), Truck Traffic: 16%, Average Future Daily Traffic: 20,176 (year 2028), Design Load: HS 20, Features Intersected: OVERFLOW, Facility Carried by Structure: FAP 3 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 8.884, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Skew: 10 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 11, Length of Maximum Span: 8.9m (29.2ft), Curb-To-Curb Width: 8.9m (29.2ft), Out-to-Out Width: 10.5m (34.4ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Fair, Channel: Good, Operating Rating: 70.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 10.49m (34.42ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $1,612,000, Roadway Improvement Cost: $162,000, Total Project Cost: $2,419,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 23SR0034002, Location: SOUTH OF SR020 (Lat: 36.020167, Lng: -89.404861), Route carried "on" structure: US 412, Year Built: 1959, Status: Open, Structure Length: 9.54m (31.30ft), Average Daily Traffic: 11,990 (year 2007), Truck Traffic: 16%, Average Future Daily Traffic: 20,176 (year 2028), Design Load: HS 20, Features Intersected: OVERFLOW, Facility Carried by Structure: FAP 3 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 8.884, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Skew: 10 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 11, Length of Maximum Span: 8.8m (28.9ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 10.5m (34.4ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 70.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 10.49m (34.42ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $1,610,000, Roadway Improvement Cost: $162,000, Total Project Cost: $2,416,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 23SR0034003, Location: SOUTH OF SR020 (Lat: 36.021667, Lng: -89.406111), Route carried "on" structure: US 412, Year Built: 1959, Year Reconstructed: 1993, Status: Open, Structure Length: 13.23m (43.41ft), Average Daily Traffic: 11,990 (year 2007), Truck Traffic: 16%, Average Future Daily Traffic: 20,176 (year 2028), Design Load: HS 20, Features Intersected: N. FK. FORKED DEER RIVER, Facility Carried by Structure: FAP 3 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 9.093, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Skew: 10 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 10, Length of Maximum Span: 25.9m (85.0ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 10.5m (34.4ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Fair, Channel: Satisfactory, Operating Rating: 43.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 14.05m (46.10ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $2,438,000, Roadway Improvement Cost: $244,000, Total Project Cost: $3,658,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 23SR0034004, Location: SOUTH OF SR020 (Lat: 36.021556, Lng: -89.406306), Route carried "on" structure: US 412, Year Built: 1959, Year Reconstructed: 1993, Status: Open, Structure Length: 13.23m (43.41ft), Average Daily Traffic: 11,990 (year 2007), Truck Traffic: 16%, Average Future Daily Traffic: 20,176 (year 2028), Design Load: HS 20, Features Intersected: N. FK. FORKED DEER RIVER, Facility Carried by Structure: FAP 3 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 9.093, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Skew: 10 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 10, Length of Maximum Span: 25.9m (85.0ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 10.5m (34.4ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 43.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 14.05m (46.10ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $2,438,000, Roadway Improvement Cost: $244,000, Total Project Cost: $3,658,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 23SR1040001, Location: 0.6 M. E JCT SR104&SR211 (Lat: 36.031250, Lng: -89.375194), Route carried "on" structure: State highway 104, Year Built: 1936, Year Reconstructed: 1993, Status: Open, Structure Length: 6.86m (22.51ft), Average Daily Traffic: 6,340 (year 2007), Truck Traffic: 10%, Average Future Daily Traffic: 11,264 (year 2028), Design Load: H 20, Features Intersected: ILLIONIS CENTRAL R.R. Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 27.954, Lanes on structure: 3, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 5 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 6, Length of Maximum Span: 11.3m (37.1ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 1.8m (5.9ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 16.0m (52.5ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 36.0 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 24.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.90m (25.92ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $1,710,000, Roadway Improvement Cost: $172,000, Total Project Cost: $2,566,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 23SR1040003, Location: 1.4 M E JCT SR104 &SR211 (Lat: 36.027028, Lng: -89.362667), Route carried "on" structure: State highway 104, Year Built: 1940, Status: Open, Structure Length: 0.67m (2.20ft), Average Daily Traffic: 6,640 (year 2007), Truck Traffic: 10%, Average Future Daily Traffic: 11,920 (year 2028), Design Load: H 15, Features Intersected: JONES CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 29.161, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft), Curb-To-Curb Width: 9.5m (31.2ft), Out-to-Out Width: 10.5m (34.4ft) Condition: Channel: Fair, Culverts: Fair, Operating Rating: 36.0 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 24.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.30m (4.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $231,000, Roadway Improvement Cost: $24,000, Total Project Cost: $347,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 23SR2110001, Location: .2 M SW JCT SR3&SR211 (Lat: 36.050528, Lng: -89.366472), Route carried "on" structure: State highway 211, Year Built: 1987, Status: Open, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 5,940 (year 2007), Truck Traffic: 3%, Average Future Daily Traffic: 10,016 (year 2028), Design Load: HS 20, Features Intersected: LEWIS CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 6.276, Lanes on structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 25.6m (84.0ft), Skew: 2 degrees, Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.7m (12.1ft), Curb-To-Curb Width: 27.1m (88.9ft), Out-to-Out Width: 28.0m (91.9ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Gravel Find on map >>
Structure Number: 23029240001, Location: ON KIST AVE (Lat: 36.034278, Lng: -89.368139), Route carried "under" structure: City street 2924, Year Built: 1946, Structure Length: 0.79m (2.59ft), Average Daily Traffic: 3,080 (year 2007), Truck Traffic: 2%, Features Intersected: IC RR / FAU 2924, Facility Carried by Structure: IC RR Minimum Vertical Clearance: 0.30m (0.98ft), Kilometerpoint: 0.225, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Slab, Length of Maximum Span: 4.3m (14.1ft) Find on map >>
Structure Number: 23I01550025, Location: NORTH DYERSBURG (Lat: 36.068583, Lng: -89.397000), Route carried "under" structure: State highway 78, Year Built: 1979, Structure Length: 6.92m (22.70ft), Average Daily Traffic: 25,440 (year 2007), Truck Traffic: 2%, Features Intersected: I155 / SR 78, Facility Carried by Structure: I155 Minimum Vertical Clearance: 4.82m (15.81ft), Kilometerpoint: 0.375, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.6m (120.1ft) Find on map >>
Structure Number: 23I01550026, Location: NORTH DYERSBURG (Lat: 36.068833, Lng: -89.397056), Route carried "under" structure: State highway 78, Year Built: 1979, Structure Length: 6.92m (22.70ft), Average Daily Traffic: 7,460 (year 2007), Truck Traffic: 2%, Features Intersected: I155 / SR 78, Facility Carried by Structure: I155 Minimum Vertical Clearance: 0.50m (1.64ft), Kilometerpoint: 3.782, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.6m (120.1ft) Find on map >>
Structure Number: 23I01550035, Location: JUNCTION OF I-155 & SR 3 (Lat: 36.073000, Lng: -89.347194), Route carried "under" structure: Interstate 155, Year Built: 1979, Structure Length: 6.74m (22.11ft), Average Daily Traffic: 14,050 (year 2007), Truck Traffic: 5%, Features Intersected: SR 3 / I155, Facility Carried by Structure: FAP 3 Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 25.621, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 34.7m (113.8ft) Find on map >>
Structure Number: 23I01550036, Location: JUNCTION OF I-155 & SR 3 (Lat: 36.072861, Lng: -89.347389), Route carried "under" structure: Interstate 3, Year Built: 1979, Structure Length: 6.74m (22.11ft), Average Daily Traffic: 13,530 (year 2007), Truck Traffic: 5%, Features Intersected: SR 3 / I155 Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 20.181, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 35.4m (116.1ft) Find on map >>
Structure Number: 23SR0030039, Location: 0.5 MI SE JCT I155 ;SR3 (Lat: 36.066222, Lng: -89.342861), Route carried "under" structure: State highway 211, Year Built: 1984, Structure Length: 8.41m (27.59ft), Average Daily Traffic: 10,060 (year 2007), Truck Traffic: 5%, Features Intersected: SR 3 / SR 211, Facility Carried by Structure: FAP 3 Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 6.437, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 30.2m (99.1ft) Find on map >>
Structure Number: 23SR003004, Location: 0.5 MI SE JCT I155 & SR 3 (Lat: 36.065806, Lng: -89.343306), Route carried "under" structure: State highway 3, Year Built: 1984, Structure Length: 9.02m (29.59ft), Average Daily Traffic: 14,250 (year 2007), Truck Traffic: 2%, Features Intersected: SR 3 / SR 211 Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 19.264, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 30.2m (99.1ft) Discuss this city on our hugely popular Tennessee forum Back to: Dyersburg, TN, Tennessee, All US cities.
|
![]() |