![]() |
Bridge Statistics for East Fishkill, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: East Fishkill, NY, New York, New York forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 52 Total length: 240 meters (787ft) Total costs: $49,293,000 Total average daily traffic: 747,047 Total average daily truck traffic: 89,657 National Bridge Inventory (NBI) Registered Bridges for East Fishkill
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 102685, Location: 1.5 MI E JCT RTS 52+82 (Lat: 41.538428, Lng: -73.842408), Route carried "on" structure: State highway 52, Year Built: 1935, Year Reconstructed: 1977, Status: Open, Structure Length: 1.31m (4.30ft), Average Daily Traffic: 12,733 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 16,590 (year 2026), Design Load: H 20, Features Intersected: WICOPEE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 12.463, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.1m (39.7ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 8.8m (28.9ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Channel: Satisfactory, Operating Rating: 60.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 1.31m (4.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Bridge Improvement Cost: $805,000, Roadway Improvement Cost: $479,000, Total Project Cost: $1,284,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 102686, Location: .1 MI E JCT SH 52 & SH376 (Lat: 41.553528, Lng: -73.793778), Route carried "on" structure: State highway 52, Year Built: 1935, Status: Open, Structure Length: 1.00m (3.28ft), Average Daily Traffic: 16,196 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 21,073 (year 2026), Design Load: H 20, Features Intersected: GAYHEAD POND INLT Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 18.499, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.1m (29.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 8.8m (28.9ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Channel: Satisfactory, Operating Rating: 64.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 38.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 1.00m (3.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $196,000, Roadway Improvement Cost: $117,000, Total Project Cost: $313,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1026879, Location: JCT TSP & RTE 52 (Lat: 41.557747, Lng: -73.780497), Route carried "on" structure: Other road 987G, Year Built: 1937, Status: Open, Structure Length: 1.46m (4.79ft), Average Daily Traffic: 3,242 (year 2002), Truck Traffic: 6%, Average Future Daily Traffic: 4,706 (year 2022), Design Load: H 20, Features Intersected: RTE 52 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 7.041, Lanes on structure: 4, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.4m (40.7ft), Skew: 22 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 14.6m (47.9ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 0.3m (1.0ft), Curb-To-Curb Width: 13.0m (42.7ft), Out-to-Out Width: 14.6m (47.9ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 57.2 metric tons, Inventory Rating: 23.4 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 1.46m (4.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $472,000, Roadway Improvement Cost: $281,000, Total Project Cost: $753,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 10323, Location: .3 MI N JCT SH 82 & SH376 (Lat: 41.583306, Lng: -73.804022), Route carried "on" structure: State highway 82, Year Built: 1936, Status: Open, Structure Length: 3.50m (11.48ft), Average Daily Traffic: 18,736 (year 2005), Truck Traffic: 6%, Average Future Daily Traffic: 24,411 (year 2025), Design Load: H 20, Features Intersected: MNRR BE LINE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 7.287, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.3m (33.8ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 1, Length of Maximum Span: 33.8m (110.9ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 7.7m (25.3ft), Out-to-Out Width: 9.4m (30.8ft) Condition: Deck: Poor, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 86.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 50.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 3.50m (11.48ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: June 2007, Critical Feature Inspection Date: June 2007, Bridge Improvement Cost: $729,000, Roadway Improvement Cost: $434,000, Total Project Cost: $1,163,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1032319, Location: JCT TSP & RTE 82 (Lat: 41.625367, Lng: -73.774292), Route carried "on" structure: Other road 987G, Year Built: 1938, Status: Open, Structure Length: 1.15m (3.77ft), Average Daily Traffic: 26,688 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 38,743 (year 2027), Design Load: HS 20, Features Intersected: RTE 82 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 15.602, Lanes on structure: 4, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Skew: 21 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.0m (32.8ft), Curb-To-Curb Width: 14.1m (46.3ft), Out-to-Out Width: 16.7m (54.8ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 79.7 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 1.15m (3.77ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $428,000, Roadway Improvement Cost: $255,000, Total Project Cost: $683,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 103253, Location: 2.4 MI E JCT I84 & US 9 (Lat: 41.530714, Lng: -73.845531), Route carried "on" structure: City street , Year Built: 1963, Status: Open, Structure Length: 9.63m (31.59ft), Average Daily Traffic: 20,800 (year 1977), Truck Traffic: 8%, Average Future Daily Traffic: 27,664 (year 1997), Design Load: H 20, Features Intersected: RTE I84, Facility Carried by Structure: FISHKILL HOOK RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Maintenance Responsibility: State Toll Authority, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 18.2m (59.7ft), Curb or Sidewalk Widths: Left: 0.4m (1.3ft), Right: 0.4m (1.3ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.9m (29.2ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 74.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 44.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 9.63m (31.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Bridge Improvement Cost: $652,000, Roadway Improvement Cost: $388,000, Total Project Cost: $1,040,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 1032541, Location: 2.8 MI E JCT RTS I84+9 (Lat: 41.531950, Lng: -73.838783), Route carried "on" structure: Interstate 84, Year Built: 1963, Status: Open, Structure Length: 1.03m (3.38ft), Average Daily Traffic: 49,248 (year 2005), Truck Traffic: 18%, Average Future Daily Traffic: 77,546 (year 2025), Design Load: HS 20, Features Intersected: WICCOPEE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 14.943, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Maintenance Responsibility: State Toll Authority, Approaching Roadway Width: 12.4m (40.7ft), Skew: 1 degrees, Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 4.8m (15.7ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 59.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.03m (3.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $321,000, Roadway Improvement Cost: $191,000, Total Project Cost: $512,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1032542, Location: 2.8 MI E JCT RTS I84+9 (Lat: 41.531950, Lng: -73.838783), Route carried "on" structure: Interstate 84, Year Built: 1963, Status: Open, Structure Length: 1.03m (3.38ft), Average Daily Traffic: 24,543 (year 1999), Truck Traffic: 18%, Average Future Daily Traffic: 38,645 (year 2019), Design Load: HS 20, Features Intersected: WICCOPEE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 14.943, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Maintenance Responsibility: State Toll Authority, Approaching Roadway Width: 12.4m (40.7ft), Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 4.8m (15.7ft) Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 78.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 47.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.03m (3.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $321,000, Roadway Improvement Cost: $191,000, Total Project Cost: $512,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 103255, Location: 4.1 MI E JCT RTS I84+9 (Lat: 41.529906, Lng: -73.812125), Route carried "on" structure: Other road , Year Built: 1963, Year Reconstructed: 1991, Status: Open, Structure Length: 8.13m (26.67ft), Average Daily Traffic: 3,000 (year 1980), Truck Traffic: 6%, Average Future Daily Traffic: 4,351 (year 2000), Design Load: HS 20+Mod, Features Intersected: RTE I84, Facility Carried by Structure: LIMEKILN RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 5, Owner: State Highway Agency, Maintenance Responsibility: State Toll Authority, Approaching Roadway Width: 19.2m (63.0ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 26.2m (86.0ft), Curb-To-Curb Width: 19.2m (63.0ft), Out-to-Out Width: 20.1m (65.9ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Satisfactory, Operating Rating: 82.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.13m (26.67ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $3,613,000, Roadway Improvement Cost: $2,097,000, Total Project Cost: $5,710,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 103256, Location: 5.0 MI E JCT RTS I84+9 (Lat: 41.532756, Lng: -73.795389), Route carried "on" structure: City street , Year Built: 1963, Status: Open, Structure Length: 8.59m (28.18ft), Average Daily Traffic: 500 (year 1980), Truck Traffic: 8%, Average Future Daily Traffic: 665 (year 2000), Design Load: H 20, Features Intersected: RTE I84, Facility Carried by Structure: SHENANDOAH ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Maintenance Responsibility: State Toll Authority, Approaching Roadway Width: 9.1m (29.9ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 18.5m (60.7ft), Curb or Sidewalk Widths: Left: 0.4m (1.3ft), Right: 0.4m (1.3ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 10.1m (33.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 83.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.59m (28.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $3,613,000, Roadway Improvement Cost: $2,097,000, Total Project Cost: $5,710,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 1032571, Location: INT RTS I84(WB)& TSP (Lat: 41.539247, Lng: -73.771547), Route carried "on" structure: Interstate 84, Year Built: 1963, Year Reconstructed: 1989, Status: Open, Structure Length: 10.57m (34.68ft), Average Daily Traffic: 25,688 (year 2007), Truck Traffic: 18%, Average Future Daily Traffic: 40,448 (year 2027), Design Load: HS 20, Features Intersected: RTE 987G Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 18.450, Lanes on structure: 3, Lanes under structure: 6, Base Highway Network: Yes, Owner: State Highway Agency, Maintenance Responsibility: State Toll Authority, Approaching Roadway Width: 12.1m (39.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 19.8m (65.0ft), Curb-To-Curb Width: 12.9m (42.3ft), Out-to-Out Width: 13.8m (45.3ft) Condition: Deck: Good, Superstructure: Good, Substructure: Poor, Operating Rating: 56.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 10.57m (34.68ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $3,613,000, Roadway Improvement Cost: $2,097,000, Total Project Cost: $5,710,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 1032572, Location: INT RTS I84(EB) & TSP (Lat: 41.538750, Lng: -73.771422), Route carried "on" structure: Interstate 84, Year Built: 1963, Year Reconstructed: 1989, Status: Open, Structure Length: 10.91m (35.79ft), Average Daily Traffic: 25,688 (year 2007), Truck Traffic: 18%, Average Future Daily Traffic: 40,448 (year 2027), Design Load: HS 20, Features Intersected: RTE 987G Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 18.449, Lanes on structure: 3, Lanes under structure: 6, Base Highway Network: Yes, Owner: State Highway Agency, Maintenance Responsibility: State Toll Authority, Approaching Roadway Width: 12.1m (39.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 20.7m (67.9ft), Curb-To-Curb Width: 12.9m (42.3ft), Out-to-Out Width: 13.8m (45.3ft) Condition: Deck: Good, Superstructure: Good, Substructure: Poor, Operating Rating: 56.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 10.91m (35.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $3,613,000, Roadway Improvement Cost: $2,097,000, Total Project Cost: $5,710,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 104697, Location: 0.1 MI N JCT RTS 376+52 (Lat: 41.554858, Lng: -73.795961), Route carried "on" structure: State highway , Year Built: 1935, Year Reconstructed: 1974, Status: Open, Structure Length: 0.79m (2.59ft), Average Daily Traffic: 9,945 (year 2002), Truck Traffic: 6%, Average Future Daily Traffic: 12,957 (year 2022), Design Load: H 20, Features Intersected: GAYHEAD POND STRM, Facility Carried by Structure: Ramp State highway 6 37 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 161.318, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.0m (23.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 8.6m (28.2ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Channel: Fair, Operating Rating: 70.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 42.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 0.79m (2.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2007, Bridge Improvement Cost: $344,000, Roadway Improvement Cost: $205,000, Total Project Cost: $549,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 104698, Location: 1.5 MI N JCT RTS 376+52 (Lat: 41.571497, Lng: -73.806806), Route carried "on" structure: State highway 376, Year Built: 1947, Year Reconstructed: 1988, Status: Open, Structure Length: 3.41m (11.19ft), Average Daily Traffic: 11,571 (year 2005), Truck Traffic: 6%, Average Future Daily Traffic: 16,783 (year 2025), Design Load: HS 20, Features Intersected: FISHKILL CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.492, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.0m (32.8ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 16.4m (53.8ft), Curb-To-Curb Width: 9.7m (31.8ft), Out-to-Out Width: 10.3m (33.8ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Channel: Satisfactory, Operating Rating: 77.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 46.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 3.41m (11.19ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Bridge Improvement Cost: $344,000, Roadway Improvement Cost: $205,000, Total Project Cost: $549,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 104699, Location: .3 MI N JCT SH 376 & SH82 (Lat: 41.584283, Lng: -73.809042), Route carried "on" structure: State highway 376, Year Built: 2005, Status: Open, Structure Length: 0.79m (2.59ft), Average Daily Traffic: 6,389 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 9,267 (year 2027), Design Load: HS 25, Features Intersected: WHORTLE KLL CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.821, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 9.4m (30.8ft), Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.4m (24.3ft), Curb-To-Curb Width: 9.4m (30.8ft), Out-to-Out Width: 10.0m (32.8ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Channel: Excellent, Structural Evaluation: High priority of corrective action, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.79m (2.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2006, Bridge Improvement Cost: $175,000, Roadway Improvement Cost: $104,000, Total Project Cost: $279,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1047, Location: 3.1 MI N JCT RTS 376+82 (Lat: 41.607192, Lng: -73.842247), Route carried "on" structure: State highway 376, Year Built: 1962, Status: Open, Structure Length: 2.74m (8.99ft), Average Daily Traffic: 12,300 (year 2005), Truck Traffic: 6%, Average Future Daily Traffic: 17,840 (year 2025), Design Load: HS 20, Features Intersected: SPROUT CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 8.981, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 25.2m (82.7ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 9.7m (31.8ft), Out-to-Out Width: 11.3m (37.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Channel: Good, Operating Rating: 78.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 46.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.74m (8.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $175,000, Roadway Improvement Cost: $104,000, Total Project Cost: $279,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1052351, Location: .9 MI E JCT I84 & TSP (Lat: 41.543311, Lng: -73.754692), Route carried "on" structure: Interstate 84, Year Built: 1968, Status: Open, Structure Length: 3.77m (12.37ft), Average Daily Traffic: 22,005 (year 1998), Truck Traffic: 18%, Average Future Daily Traffic: 34,649 (year 2018), Design Load: HS 20, Features Intersected: HOSNER MTN ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 21.865, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Maintenance Responsibility: State Toll Authority, Approaching Roadway Width: 12.1m (39.7ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 36.2m (118.8ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 11.8m (38.7ft), Out-to-Out Width: 12.7m (41.7ft) Condition: Deck: Satisfactory, Superstructure: Very good, Substructure: Good, Operating Rating: 75.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 44.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.77m (12.37ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $494,000, Roadway Improvement Cost: $294,000, Total Project Cost: $788,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 1052352, Location: .9 MI E JCT I84 & TSP (Lat: 41.543311, Lng: -73.754692), Route carried "on" structure: Interstate 84, Year Built: 1968, Status: Open, Structure Length: 4.23m (13.88ft), Average Daily Traffic: 22,005 (year 1998), Truck Traffic: 18%, Average Future Daily Traffic: 34,649 (year 2018), Design Load: HS 20, Features Intersected: HOSNER MTN ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 21.861, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Maintenance Responsibility: State Toll Authority, Approaching Roadway Width: 11.8m (38.7ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 40.8m (133.9ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 11.8m (38.7ft), Out-to-Out Width: 12.7m (41.7ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Operating Rating: 67.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.23m (13.88ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $494,000, Roadway Improvement Cost: $294,000, Total Project Cost: $788,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 1052361, Location: 2.1 MILES E JCT I84 & TSP (Lat: 41.548344, Lng: -73.732200), Route carried "on" structure: Interstate 84, Year Built: 1968, Year Reconstructed: 1980, Status: Open, Structure Length: 9.78m (32.09ft), Average Daily Traffic: 22,005 (year 1998), Truck Traffic: 18%, Average Future Daily Traffic: 34,649 (year 2018), Design Load: HS 20, Features Intersected: 52 52 82042154 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 21.995, Lanes on structure: 2, Lanes under structure: 3, Base Highway Network: Yes, Owner: State Highway Agency, Maintenance Responsibility: State Toll Authority, Approaching Roadway Width: 14.6m (47.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 32.0m (105.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.9m (32.5ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 87.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 51.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of corrective action, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 9.78m (32.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $494,000, Roadway Improvement Cost: $294,000, Total Project Cost: $788,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 1052362, Location: 2.1 MILES E JCT I84 & TSP (Lat: 41.548344, Lng: -73.732200), Route carried "on" structure: Interstate 84, Year Built: 1968, Year Reconstructed: 1977, Status: Open, Structure Length: 9.14m (29.99ft), Average Daily Traffic: 22,005 (year 1998), Truck Traffic: 18%, Average Future Daily Traffic: 34,649 (year 2018), Design Load: HS 20, Features Intersected: 52 52 82042154 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 21.998, Lanes on structure: 3, Lanes under structure: 3, Base Highway Network: Yes, Owner: State Highway Agency, Maintenance Responsibility: State Toll Authority, Approaching Roadway Width: 12.8m (42.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 29.8m (97.8ft), Curb or Sidewalk Widths: Left: 0.4m (1.3ft), Right: 0.4m (1.3ft), Curb-To-Curb Width: 11.5m (37.7ft), Out-to-Out Width: 13.0m (42.7ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 92.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 55.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 9.14m (29.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $494,000, Roadway Improvement Cost: $294,000, Total Project Cost: $788,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 105237, Location: 3.1 MI E JCT I84 & TSP (Lat: 41.543792, Lng: -73.714089), Route carried "on" structure: City street , Year Built: 1968, Status: Open, Structure Length: 8.41m (27.59ft), Average Daily Traffic: 627 (year 1998), Truck Traffic: 8%, Average Future Daily Traffic: 834 (year 2018), Design Load: HS 20, Features Intersected: RTE I84, Facility Carried by Structure: STORMVILLE MTN RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Maintenance Responsibility: State Toll Authority, Approaching Roadway Width: 7.6m (24.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 28.9m (94.8ft), Curb-To-Curb Width: 7.6m (24.9ft), Out-to-Out Width: 8.7m (28.5ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 74.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 44.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.41m (27.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $494,000, Roadway Improvement Cost: $294,000, Total Project Cost: $788,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 105239, Location: 5.4 MI E JCT I84+TSP (Lat: 41.520367, Lng: -73.690356), Route carried "on" structure: County highway , Year Built: 1968, Status: Open, Structure Length: 9.17m (30.09ft), Average Daily Traffic: 1,672 (year 1998), Truck Traffic: 6%, Average Future Daily Traffic: 2,425 (year 2018), Design Load: HS 20, Features Intersected: RTE I84, Facility Carried by Structure: HOLMES ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Maintenance Responsibility: State Toll Authority, Approaching Roadway Width: 8.2m (26.9ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 30.4m (99.7ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.6m (28.2ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 87.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 51.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 9.17m (30.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $494,000, Roadway Improvement Cost: $294,000, Total Project Cost: $788,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 107846, Location: 0.4 Mi NW JCT I-84 & TSP (Lat: 41.544775, Lng: -73.774775), Route carried "on" structure: Other road , Year Built: 2006, Status: Open, Structure Length: 2.40m (7.87ft), Average Daily Traffic: 400 (year 2002), Truck Traffic: 5%, Average Future Daily Traffic: 400 (year 2022), Design Load: HS 25, Features Intersected: 987G 987G82031036, Facility Carried by Structure: HOSNER MTN. RD. Minimum Vertical Clearance: 99.00m (324.80ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 8.4m (27.6ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 22.6m (74.1ft), Curb or Sidewalk Widths: Left: 1.7m (5.6ft), Right: 0.0m, Curb-To-Curb Width: 8.4m (27.6ft), Out-to-Out Width: 11.2m (36.7ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 93.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 55.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.40m (7.87ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2007, Bridge Improvement Cost: $180,000, Roadway Improvement Cost: $107,000, Total Project Cost: $287,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 107847, Location: 0.4 Mi NW of I84 & TSP (Lat: 41.544636, Lng: -73.775250), Route carried "on" structure: Other road , Year Built: 2006, Status: Open, Structure Length: 2.40m (7.87ft), Truck Traffic: 5%, Design Load: HS 25, Features Intersected: 987G 987G82031036, Facility Carried by Structure: HOSNER MTN. ROAD Minimum Vertical Clearance: 0.00m, Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 8.4m (27.6ft), Material/Design: Concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 22.6m (74.1ft), Curb or Sidewalk Widths: Left: 1.7m (5.6ft), Right: 0.0m, Curb-To-Curb Width: 8.4m (27.6ft), Out-to-Out Width: 11.2m (36.7ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 93.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 55.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Superior to present desirable criteria, Deck Geometry: High priority of corrective action, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.40m (7.87ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2007, Bridge Improvement Cost: $180,000, Roadway Improvement Cost: $107,000, Total Project Cost: $287,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 109135, Location: NW QUAD RAMPS I84+TSP INT (Lat: 41.540469, Lng: -73.773533), Route carried "on" structure: Ramp Interstate 84, Year Built: 1962, Status: Open, Structure Length: 0.82m (2.69ft), Average Daily Traffic: 50,800 (year 1989), Truck Traffic: 18%, Average Future Daily Traffic: 79,990 (year 2009), Design Load: HS 20, Features Intersected: STERN STREAM Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: State Highway Agency, Maintenance Responsibility: State Toll Authority, Approaching Roadway Width: 3.9m (12.8ft), Skew: 4 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.3m (24.0ft), Curb-To-Curb Width: 4.2m (13.8ft), Out-to-Out Width: 18.9m (62.0ft) Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 51.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.82m (2.69ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $344,000, Roadway Improvement Cost: $205,000, Total Project Cost: $549,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 226278, Location: 0.8 MI SE OF HOPEWELL JCT (Lat: 41.581700, Lng: -73.794286), Route carried "on" structure: City street , Year Built: 1987, Status: Open, Structure Length: 2.01m (6.59ft), Average Daily Traffic: 577 (year 1996), Truck Traffic: 8%, Average Future Daily Traffic: 767 (year 2016), Features Intersected: FISH KILL CREEK, Facility Carried by Structure: CAROL DRIVE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Wood or Timber, Number Of Spans In Main Unit: 3, Length of Maximum Span: 7.9m (25.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 7.9m (25.9ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Channel: Satisfactory, Operating Rating: 40.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 28.1 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 2.01m (6.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $397,000, Roadway Improvement Cost: $236,000, Total Project Cost: $633,000 ( Estimate for 2007), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 226871, Location: 1.1 MI S JCT I84 & HOOK (Lat: 41.505089, Lng: -73.791253), Route carried "on" structure: City street , Year Built: 1980, Year Reconstructed: 2000, Status: Open, Structure Length: 0.88m (2.89ft), Average Daily Traffic: 200 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 266 , Features Intersected: WICCOPEE CREEK, Facility Carried by Structure: WARREN FARM ROAD Minimum Vertical Clearance: 0.00m, Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Wood or Timber, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.9m (25.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 7.2m (23.6ft), Out-to-Out Width: 7.8m (25.6ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 65.3 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 49.0 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 0.88m (2.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2007, Bridge Improvement Cost: $221,000, Roadway Improvement Cost: $132,000, Total Project Cost: $353,000 ( Estimate for 2007), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 334308, Location: 2.3 MI NE OF HOPEWELL JCT (Lat: 41.595636, Lng: -73.762831), Route carried "on" structure: County highway , Year Built: 1989, Status: Open, Structure Length: 1.24m (4.07ft), Average Daily Traffic: 6,373 (year 1998), Truck Traffic: 6%, Average Future Daily Traffic: 9,243 (year 2018), Design Load: HS 20, Features Intersected: SYLVAN LAKE OUTLT, Facility Carried by Structure: BEEKMAN ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 3, Owner: County Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Skew: 3 degrees, Material/Design: Prestressed concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.6m (34.8ft), Curb-To-Curb Width: 14.6m (47.9ft), Out-to-Out Width: 23.7m (77.8ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Fair, Channel: Good, Operating Rating: 67.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 28.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.24m (4.07ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $265,000, Roadway Improvement Cost: $158,000, Total Project Cost: $423,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 334309, Location: 1.2 MI NE OF HOPEWELL JCT (Lat: 41.588325, Lng: -73.787578), Route carried "on" structure: County highway , Year Built: 1940, Year Reconstructed: 2001, Status: Open, Structure Length: 2.59m (8.50ft), Average Daily Traffic: 1,800 (year 2000), Truck Traffic: 8%, Average Future Daily Traffic: 2,394 (year 2020), Design Load: HS 20, Features Intersected: FISHKILL CREEK, Facility Carried by Structure: CARPENTR RD CR 29 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 9.0m (29.5ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 24.5m (80.4ft), Curb-To-Curb Width: 9.4m (30.8ft), Out-to-Out Width: 10.0m (32.8ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Very good, Channel: Good, Operating Rating: 88.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 52.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.59m (8.50ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $265,000, Roadway Improvement Cost: $158,000, Total Project Cost: $423,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 33431, Location: 2.2 MI NE OF HOPEWELL JCT (Lat: 41.588325, Lng: -73.767997), Route carried "on" structure: City street , Year Built: 1940, Year Reconstructed: 1962, Status: Open, Structure Length: 1.46m (4.79ft), Average Daily Traffic: 407 (year 1996), Truck Traffic: 8%, Average Future Daily Traffic: 541 (year 2016), Design Load: H 10, Features Intersected: FISHKILL CREEK, Facility Carried by Structure: STORMVILLE ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: County Highway Agency, Approaching Roadway Width: 4.8m (15.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 13.7m (44.9ft), Curb-To-Curb Width: 4.8m (15.7ft), Out-to-Out Width: 5.4m (17.7ft) Condition: Deck: Very good, Superstructure: Satisfactory, Substructure: Poor, Channel: Poor, Operating Rating: 48.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 29.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of corrective action, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.46m (4.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $177,000, Roadway Improvement Cost: $105,000, Total Project Cost: $282,000 ( Estimate for 2007), Deck Structure Type: Corrugated Steel, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 334311, Location: 3.6 ME SE OF POUGHQUAG (Lat: 41.585733, Lng: -73.745792), Route carried "on" structure: City street , Year Built: 1932, Status: Open, Structure Length: 1.24m (4.07ft), Average Daily Traffic: 1,877 (year 1996), Truck Traffic: 8%, Average Future Daily Traffic: 2,496 (year 2016), Features Intersected: FISHKILL CREEK, Facility Carried by Structure: PHILIPS ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.4m (21.0ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 11.8m (38.7ft), Curb-To-Curb Width: 7.0m (23.0ft), Out-to-Out Width: 7.7m (25.3ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 65.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 1.24m (4.07ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $177,000, Roadway Improvement Cost: $105,000, Total Project Cost: $282,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 334312, Location: 1.1 MI SW OF HOPEWEL JCT (Lat: 41.570111, Lng: -73.821619), Route carried "on" structure: County highway , Year Built: 1963, Status: Open, Structure Length: 2.71m (8.89ft), Average Daily Traffic: 10,070 (year 1998), Truck Traffic: 6%, Average Future Daily Traffic: 14,606 (year 2018), Features Intersected: FISHKILL CREEK, Facility Carried by Structure: COUNTY ROAD 31 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Skew: 3 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 2, Length of Maximum Span: 13.1m (43.0ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 0.3m (1.0ft), Curb-To-Curb Width: 7.4m (24.3ft), Out-to-Out Width: 8.0m (26.2ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Fair, Operating Rating: 55.3 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 2.71m (8.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $480,000, Roadway Improvement Cost: $286,000, Total Project Cost: $766,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 336744, Location: 4.1MI N JCT T.S.PWY & 84I (Lat: 41.595097, Lng: -73.762914), Route carried "on" structure: County highway , Year Built: 1989, Status: Open, Structure Length: 6.18m (20.28ft), Average Daily Traffic: 6,749 (year 1998), Truck Traffic: 6%, Average Future Daily Traffic: 9,789 (year 2018), Design Load: HS 20, Features Intersected: RTE 987G, Facility Carried by Structure: CR 9BEEKMAN RD. Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 5, Owner: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Skew: 2 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 2, Length of Maximum Span: 30.1m (98.8ft), Curb-To-Curb Width: 14.3m (46.9ft), Out-to-Out Width: 15.2m (49.9ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 56.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 38.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.18m (20.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $2,085,000, Roadway Improvement Cost: $1,210,000, Total Project Cost: $3,295,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 337016, Location: .5 MILE NW JCT I84 & TSP (Lat: 41.543167, Lng: -73.778386), Route carried "on" structure: Other road , Year Built: 2004, Status: Open, Structure Length: 1.19m (3.90ft), Truck Traffic: 8%, Design Load: HS 25, Features Intersected: SHENANDOAH CREEK, Facility Carried by Structure: SOMERSET ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 9 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 11.0m (36.1ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 12.2m (40.0ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Channel: Very good, Operating Rating: 97.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 58.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.19m (3.90ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2006, Bridge Improvement Cost: $289,000, Roadway Improvement Cost: $172,000, Total Project Cost: $461,000 ( Estimate for 2007), Deck Structure Type: Other Find on map >>
Structure Number: 370206, Location: 2.0 MI SE OF HOPEWELL JCT (Lat: 41.568342, Lng: -73.776436), Route carried "on" structure: County highway , Year Built: 1998, Status: Open, Structure Length: 2.74m (8.99ft), Average Daily Traffic: 828 (year 1998), Truck Traffic: 8%, Average Future Daily Traffic: 1,101 (year 2018), Design Load: HS 25, Features Intersected: MNRR BE LINE, Facility Carried by Structure: CARPENTER ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Railroad, Maintenance Responsibility: County Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Prestressed concrete, Design/Construction: Channel Beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 26.2m (86.0ft), Curb-To-Curb Width: 9.7m (31.8ft), Out-to-Out Width: 12.4m (40.7ft) Condition: Deck: Excellent, Superstructure: Very good, Substructure: Excellent, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 44.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 2.74m (8.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $753,000, Roadway Improvement Cost: $448,000, Total Project Cost: $1,201,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 5502349, Location: 1.7 MI SE OF HOPEWELL JCT (Lat: 41.569989, Lng: -73.780436), Route carried "on" structure: Other road 987G, Year Built: 1937, Year Reconstructed: 1994, Status: Open, Structure Length: 2.22m (7.28ft), Average Daily Traffic: 26,688 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 38,743 (year 2027), Design Load: HS 20, Features Intersected: MNRR BE LINE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 8.436, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Skew: 31 degrees, Material/Design: Steel, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 19.8m (65.0ft), Curb-To-Curb Width: 18.9m (62.0ft), Out-to-Out Width: 19.9m (65.3ft) Condition: Deck: Excellent, Superstructure: Very good, Substructure: Good, Operating Rating: 64.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 2.22m (7.28ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2007, Critical Feature Inspection Date: August 2007, Bridge Improvement Cost: $979,000, Roadway Improvement Cost: $582,000, Total Project Cost: $1,561,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 5502359, Location: 2.3 MI NE OF HOPEWEL JCT (Lat: 41.589022, Lng: -73.765775), Route carried "on" structure: Other road 987G, Year Built: 1936, Status: Open, Structure Length: 2.10m (6.89ft), Average Daily Traffic: 26,688 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 38,743 (year 2027), Design Load: H 20, Features Intersected: FISHKILL CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 13.506, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Skew: 30 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 19.5m (64.0ft), Curb-To-Curb Width: 14.3m (46.9ft), Out-to-Out Width: 17.6m (57.7ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Channel: Satisfactory, Operating Rating: 58.0 metric tons, Inventory Rating: 22.8 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 2.10m (6.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Bridge Improvement Cost: $818,000, Roadway Improvement Cost: $487,000, Total Project Cost: $1,305,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 552353, Location: 4MI N JCT TSP & 84I (Lat: 41.595097, Lng: -73.764569), Route carried "on" structure: Ramp Other road , Year Built: 1989, Status: Open, Structure Length: 0.76m (2.49ft), Average Daily Traffic: 1,986 (year 1998), Truck Traffic: 8%, Average Future Daily Traffic: 2,566 (year 2018), Design Load: HS 20, Features Intersected: Sylvan Lake Outle, Facility Carried by Structure: FromTSP(BeekmanRd Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 11.2m (36.7ft), Skew: 20 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.3m (24.0ft), Curb or Sidewalk Widths: Left: 1.9m (6.2ft), Right: 1.9m (6.2ft), Curb-To-Curb Width: 11.2m (36.7ft), Out-to-Out Width: 17.2m (56.4ft) Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 81.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.76m (2.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $290,000, Roadway Improvement Cost: $173,000, Total Project Cost: $463,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 552465, Location: 1.8 MI SOUTH JCT I84 &TSP (Lat: 41.512356, Lng: -73.787589), Route carried "on" structure: Other road 987G, Year Built: 1999, Status: Open, Structure Length: 1.88m (6.17ft), Average Daily Traffic: 26,959 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 35,076 (year 2027), Design Load: HS 25, Features Intersected: MILLER HILL ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.788, Lanes on structure: 4, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 21.6m (70.9ft), Skew: 29 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 17.0m (55.8ft), Curb-To-Curb Width: 21.6m (70.9ft), Out-to-Out Width: 24.0m (78.7ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 74.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.88m (6.17ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2006, Bridge Improvement Cost: $776,000, Roadway Improvement Cost: $462,000, Total Project Cost: $1,238,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 1026879, Location: JCT TSP & RTE 52 (Lat: 41.557747, Lng: -73.780497), Route carried "under" structure: State highway 52, Year Built: 1937, Structure Length: 1.46m (4.79ft), Average Daily Traffic: 16,196 (year 2006), Truck Traffic: 6%, Features Intersected: RTE 52, Facility Carried by Structure: RTE 987G Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 18.584, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 14.6m (47.9ft) Find on map >>
Structure Number: 1032319, Location: JCT TSP & RTE 82 (Lat: 41.625367, Lng: -73.774292), Route carried "under" structure: State highway 82, Year Built: 1938, Structure Length: 1.15m (3.77ft), Average Daily Traffic: 7,090 (year 2007), Truck Traffic: 6%, Features Intersected: RTE 82, Facility Carried by Structure: RTE 987G Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 12.631, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 10.0m (32.8ft) Find on map >>
Structure Number: 103253, Location: 2.4 MI E JCT I84 & US 9 (Lat: 41.530714, Lng: -73.845531), Route carried "under" structure: Interstate 84, Year Built: 1963, Structure Length: 9.63m (31.59ft), Average Daily Traffic: 19,000 (year 1972), Truck Traffic: 18%, Features Intersected: RTE I84, Facility Carried by Structure: FISHKILL HOOK RD Minimum Vertical Clearance: 5.41m (17.75ft), Kilometerpoint: 11.939, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 18.2m (59.7ft) Find on map >>
Structure Number: 103255, Location: 4.1 MI E JCT RTS I84+9 (Lat: 41.529906, Lng: -73.812125), Route carried "under" structure: Interstate 84, Year Built: 1963, Structure Length: 8.13m (26.67ft), Average Daily Traffic: 15,900 (year 1972), Truck Traffic: 18%, Features Intersected: RTE I84, Facility Carried by Structure: LIMEKILN RD Minimum Vertical Clearance: 5.02m (16.47ft), Kilometerpoint: 14.835, Lanes on structure: 5, Lanes under structure: 5, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.2m (86.0ft) Find on map >>
Structure Number: 103256, Location: 5.0 MI E JCT RTS I84+9 (Lat: 41.532756, Lng: -73.795389), Route carried "under" structure: Interstate 84, Year Built: 1963, Structure Length: 8.59m (28.18ft), Average Daily Traffic: 51,376 (year 2007), Truck Traffic: 18%, Features Intersected: RTE I84, Facility Carried by Structure: SHENANDOAH ROAD Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 16.299, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 18.5m (60.7ft) Find on map >>
Structure Number: 1032571, Location: INT RTS I84(WB)& TSP (Lat: 41.539247, Lng: -73.771547), Route carried "under" structure: Other road 987G, Year Built: 1963, Structure Length: 10.57m (34.68ft), Average Daily Traffic: 100 (year 2007), Truck Traffic: 6%, Features Intersected: RTE 987G, Facility Carried by Structure: RTE I84 Minimum Vertical Clearance: 4.82m (15.81ft), Kilometerpoint: 4.747, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 19.8m (65.0ft) Find on map >>
Structure Number: 1032572, Location: INT RTS I84(EB) & TSP (Lat: 41.538750, Lng: -73.771422), Route carried "under" structure: Other road 987G, Year Built: 1963, Structure Length: 10.91m (35.79ft), Average Daily Traffic: 26,959 (year 2007), Truck Traffic: 6%, Features Intersected: RTE 987G, Facility Carried by Structure: RTE I84 Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 4.682, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 20.7m (67.9ft) Find on map >>
Structure Number: 1052361, Location: 2.1 MILES E JCT I84 & TSP (Lat: 41.548344, Lng: -73.732200), Route carried "under" structure: State highway , Year Built: 1968, Structure Length: 9.78m (32.09ft), Average Daily Traffic: 1,300 (year 1972), Truck Traffic: 8%, Features Intersected: 52 52 82042154, Facility Carried by Structure: RTE I84 Minimum Vertical Clearance: 22.99m (75.43ft), Kilometerpoint: 26.291, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.0m (105.0ft) Discuss this city on our hugely popular New York forum Back to: East Fishkill, NY, New York, All US cities.
|
![]() |