![]() |
Bridge Statistics for East Greenwich, Rhode Island (RI) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: East Greenwich, RI, Rhode Island, Rhode Island forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 18 Total length: 100 meters (328ft) Total costs: $35,307,000 Total average daily traffic: 393,604 Total average daily truck traffic: 36,885 National Bridge Inventory (NBI) Registered Bridges for East Greenwich
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 335, Location: 0.5 Mi E of JCT RI 4 (Lat: 41.629500, Lng: -71.479833), Route carried "on" structure: State highway 402, Year Built: 1928, Year Reconstructed: 1964, Status: Open, Structure Length: 0.91m (2.99ft), Average Daily Traffic: 18,800 (year 2006), Truck Traffic: 5%, Average Future Daily Traffic: 23,550 (year 2028), Design Load: HS 20, Features Intersected: HUNT RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 22.9m (75.1ft), Skew: 6 degrees, Material/Design: Prestressed concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.6m (24.9ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.6m (2.0ft), Curb-To-Curb Width: 22.9m (75.1ft), Out-to-Out Width: 25.6m (84.0ft) Condition: Deck: Satisfactory, Superstructure: Poor, Substructure: Satisfactory, Channel: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.91m (2.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Bridge Improvement Cost: $485,000, Roadway Improvement Cost: $48,000, Total Project Cost: $727,000 ( Estimate for 2007), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 435, Location: 0.1 Mi E of JCT RI 4 (Lat: 41.627167, Lng: -71.483833), Route carried "on" structure: Alternate State highway 403, Year Built: 1955, Status: Open, Structure Length: 1.10m (3.61ft), Average Daily Traffic: 14,500 (year 2006), Truck Traffic: 5%, Average Future Daily Traffic: 18,989 (year 2028), Design Load: HS 20, Features Intersected: FRENCHTOWN BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 13.7m (44.9ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.8m (32.2ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 0.3m (1.0ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 14.6m (47.9ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 48.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 29.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.10m (3.61ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Bridge Improvement Cost: $193,000, Roadway Improvement Cost: $19,000, Total Project Cost: $290,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 516, Location: 1.0 Mi S of JCT RI 2 (Lat: 41.674500, Lng: -71.547333), Route carried "on" structure: City street , Year Built: 1957, Status: Open, Structure Length: 3.44m (11.29ft), Average Daily Traffic: 1,600 (year 2006), Truck Traffic: 10%, Design Load: HS 20, Features Intersected: I-95, Facility Carried by Structure: SHIPPEETOWN RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 12.5m (41.0ft), Material/Design: Concrete continuous, Design/Construction: Frame, Number Of Spans In Main Unit: 2, Length of Maximum Span: 15.8m (51.8ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 12.5m (41.0ft), Out-to-Out Width: 14.5m (47.6ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 3.47m (11.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2006, Bridge Improvement Cost: $1,038,000, Roadway Improvement Cost: $104,000, Total Project Cost: $1,558,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 76, Location: 0.5 Mi E of JCT RI 2 (Lat: 41.663333, Lng: -71.491000), Route carried "on" structure: State highway 401, Year Built: 1967, Status: Open, Structure Length: 6.19m (20.31ft), Average Daily Traffic: 25,500 (year 2006), Truck Traffic: 10%, Average Future Daily Traffic: 32,286 (year 2028), Design Load: HS 20, Features Intersected: RI 4 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 20 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 30.2m (99.1ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 14.6m (47.9ft), Out-to-Out Width: 23.5m (77.1ft) Condition: Deck: Fair, Superstructure: Poor, Substructure: Satisfactory, Operating Rating: 73.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 43.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 6.19m (20.31ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Bridge Improvement Cost: $5,972,000, Roadway Improvement Cost: $597,000, Total Project Cost: $8,958,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 761, Location: 0.3 Mi E of JCT RI 2 (Lat: 41.649500, Lng: -71.486333), Route carried "on" structure: City street , Year Built: 1969, Status: Open, Structure Length: 7.32m (24.02ft), Average Daily Traffic: 5,154 (year 1999), Truck Traffic: 10%, Average Future Daily Traffic: 6,364 (year 2028), Design Load: HS 20, Features Intersected: RI 4, Facility Carried by Structure: MIDDLE RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Steel continuous, Design/Construction: Frame, Number Of Spans In Main Unit: 5, Length of Maximum Span: 19.8m (65.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 12.8m (42.0ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.32m (24.02ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Bridge Improvement Cost: $991,000, Roadway Improvement Cost: $99,000, Total Project Cost: $1,487,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 763, Location: 0.5 Mi E of JCT RI 2 (Lat: 41.628833, Lng: -71.486833), Route carried "on" structure: State highway 402, Year Built: 1973, Status: Open, Structure Length: 11.09m (36.38ft), Average Daily Traffic: 16,200 (year 2006), Truck Traffic: 5%, Average Future Daily Traffic: 23,550 (year 2028), Design Load: HS 20, Features Intersected: RI 4 N&S BOUND Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 7, Owner: State Highway Agency, Approaching Roadway Width: 20.7m (67.9ft), Skew: 20 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 36.6m (120.1ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 20.7m (67.9ft), Out-to-Out Width: 24.5m (80.4ft) Condition: Deck: Satisfactory, Superstructure: Poor, Substructure: Fair, Operating Rating: 58.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 11.09m (36.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Bridge Improvement Cost: $5,654,000, Roadway Improvement Cost: $565,000, Total Project Cost: $8,481,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 764, Location: 0.5 Mi S of JCT RI 2 (Lat: 41.625500, Lng: -71.487333), Route carried "on" structure: State highway 4, Year Built: 1970, Year Reconstructed: 1991, Status: Open, Structure Length: 1.01m (3.31ft), Average Daily Traffic: 63,800 (year 1992), Truck Traffic: 10%, Design Load: HS 20, Features Intersected: FRENCHTOWN BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Base Highway Network: Yes (, Subroute: 1), Owner: State Highway Agency, Approaching Roadway Width: 23.2m (76.1ft), Skew: 25 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 4.9m (16.1ft), Curb-To-Curb Width: 23.2m (76.1ft), Out-to-Out Width: 23.5m (77.1ft) Condition: Channel: Very good, Culverts: Good, Operating Rating: 51.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below), Length Of Structure Improvement: 0.70m (2.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Bridge Improvement Cost: $514,000, Roadway Improvement Cost: $51,000, Total Project Cost: $770,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 765, Location: 0.5 N of JCT RI 2 (Lat: 41.626667, Lng: -71.486333), Route carried "on" structure: Ramp State highway 403, Year Built: 1973, Status: Open, Structure Length: 5.88m (19.29ft), Average Daily Traffic: 16,400 (year 1992), Truck Traffic: 10%, Design Load: HS 20, Features Intersected: RI 4 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 11.3m (37.1ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 29.9m (98.1ft), Curb-To-Curb Width: 11.3m (37.1ft), Out-to-Out Width: 12.5m (41.0ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 68.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 41.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 5.88m (19.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Bridge Improvement Cost: $1,469,000, Roadway Improvement Cost: $147,000, Total Project Cost: $2,204,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 766, Location: 1.5 Mi N of JCT RI 102 (Lat: 41.614167, Lng: -71.492833), Route carried "on" structure: State highway 2, Year Built: 1973, Year Reconstructed: 1991, Status: Open, Structure Length: 8.35m (27.40ft), Average Daily Traffic: 12,850 (year 1999), Truck Traffic: 10%, Average Future Daily Traffic: 16,248 (year 2028), Design Load: HS 20, Features Intersected: RI 4 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 5, Owner: State Highway Agency, Approaching Roadway Width: 28.0m (91.9ft), Skew: 25 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 43.0m (141.1ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 0.6m (2.0ft), Curb-To-Curb Width: 28.0m (91.9ft), Out-to-Out Width: 30.0m (98.4ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 62.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 38.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.29m (27.20ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Bridge Improvement Cost: $5,365,000, Roadway Improvement Cost: $536,000, Total Project Cost: $8,047,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 767, Location: 0.5 Mi S of JCT RI 2 (Lat: 41.609667, Lng: -71.495833), Route carried "on" structure: City street , Year Built: 1983, Year Reconstructed: 1991, Status: Open, Structure Length: 5.46m (17.91ft), Average Daily Traffic: 700 (year 1992), Truck Traffic: 10%, Design Load: HS 20, Features Intersected: RI 4, Facility Carried by Structure: SOUTH RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 1 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 26.8m (87.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.5m (4.9ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 11.5m (37.7ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 73.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 44.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 5.36m (17.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Bridge Improvement Cost: $1,282,000, Roadway Improvement Cost: $128,000, Total Project Cost: $1,923,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 827, Location: 0.3 Mi E of JCT US 1 (Lat: 41.656833, Lng: -71.450667), Route carried "on" structure: City street , Year Built: 1988, Year Reconstructed: 2002, Status: Open, Structure Length: 1.89m (6.20ft), Average Daily Traffic: 100 (year 1992), Truck Traffic: 10%, Design Load: HS 20, Features Intersected: AMTRAK, Facility Carried by Structure: ROCKY HOLLOW RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 10.4m (34.1ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 18.3m (60.0ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 1.8m (5.9ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 14.6m (47.9ft) Condition: Deck: Very good, Superstructure: Satisfactory, Substructure: Very good, Operating Rating: 93.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 56.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.89m (6.20ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Total Project Cost: $862,000 ( Estimate for 2007), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 516, Location: 1.0 Mi S of JCT RI 2 (Lat: 41.674500, Lng: -71.547333), Route carried "under" structure: Interstate 95, Year Built: 1957, Structure Length: 3.44m (11.29ft), Average Daily Traffic: 25,900 (year 2006), Truck Traffic: 10%, Features Intersected: I-95, Facility Carried by Structure: SHIPPEETOWN RD Minimum Vertical Clearance: 4.42m (14.50ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Frame, Length of Maximum Span: 15.8m (51.8ft) Find on map >>
Structure Number: 76, Location: 0.5 Mi E of JCT RI 2 (Lat: 41.663333, Lng: -71.491000), Route carried "under" structure: State highway 4, Year Built: 1967, Structure Length: 6.19m (20.31ft), Average Daily Traffic: 28,500 (year 2006), Truck Traffic: 10%, Features Intersected: RI 4 Minimum Vertical Clearance: 5.48m (17.98ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.2m (99.1ft) Find on map >>
Structure Number: 761, Location: 0.3 Mi E of JCT RI 2 (Lat: 41.649500, Lng: -71.486333), Route carried "under" structure: State highway 4, Year Built: 1969, Structure Length: 7.32m (24.02ft), Average Daily Traffic: 28,500 (year 2006), Truck Traffic: 10%, Features Intersected: RI 4, Facility Carried by Structure: MIDDLE RD Minimum Vertical Clearance: 5.39m (17.68ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Frame, Length of Maximum Span: 19.8m (65.0ft) Find on map >>
Structure Number: 763, Location: 0.5 Mi E of JCT RI 2 (Lat: 41.628833, Lng: -71.486833), Route carried "under" structure: State highway 4, Year Built: 1973, Structure Length: 11.09m (36.38ft), Average Daily Traffic: 35,500 (year 2006), Truck Traffic: 10%, Features Intersected: RI 4 N&S BOUND Minimum Vertical Clearance: 0.50m (1.64ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 7, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.6m (120.1ft) Find on map >>
Structure Number: 765, Location: 0.5 N of JCT RI 2 (Lat: 41.626667, Lng: -71.486333), Route carried "under" structure: Ramp State highway 4, Year Built: 1973, Structure Length: 5.88m (19.29ft), Average Daily Traffic: 28,600 (year 2006), Truck Traffic: 10%, Features Intersected: RI 4 Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.9m (98.1ft) Find on map >>
Structure Number: 766, Location: 1.5 Mi N of JCT RI 102 (Lat: 41.614167, Lng: -71.492833), Route carried "under" structure: State highway 4, Year Built: 1973, Structure Length: 8.35m (27.40ft), Average Daily Traffic: 35,500 (year 2006), Truck Traffic: 10%, Features Intersected: RI 4, Facility Carried by Structure: RI 2 SO COUNTY TRL Minimum Vertical Clearance: 4.54m (14.90ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 5, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 43.0m (141.1ft) Find on map >>
Structure Number: 767, Location: 0.5 Mi S of JCT RI 2 (Lat: 41.609667, Lng: -71.495833), Route carried "under" structure: State highway 4, Year Built: 1983, Structure Length: 5.46m (17.91ft), Average Daily Traffic: 35,500 (year 2006), Truck Traffic: 10%, Features Intersected: RI 4, Facility Carried by Structure: SOUTH RD Minimum Vertical Clearance: 4.99m (16.37ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.8m (87.9ft) Discuss this city on our hugely popular Rhode Island forum Back to: East Greenwich, RI, Rhode Island, All US cities.
|
![]() |