U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Eden, Vermont (VT) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Eden, VT, Vermont, Vermont forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 10
Total length: 10 meters (33ft)
Total costs: $5,007,000
Total average daily traffic: 18,120
Total average daily truck traffic: 1,594
Total future (year 2018) average daily traffic: 27,180
National Bridge Inventory (NBI) Registered Bridges for Eden

New bridges - Historical Statistics

  • 1920-1929: 1
  • 1930-1939: 4
  • 1940-1949: 0
  • 1950-1959: 0
  • 1960-1969: 0
  • 1970-1979: 1
  • 1980-1989: 1
  • 1990-1999: 2
  • 2000-2009: 1

Reconstructed bridges - Historical Statistics

  • 1940-1949: 1
  • 1950-1959: 0
  • 1960-1969: 2
  • 1970-1979: 2

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 100803001408031,  Location: 2.3 MI TO JCT W VT100 (Lat: 44.690000,  Lng: -72.613056),  Route carried "on" structure: Other road C4003,  Year Built: 1998,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 10 (year 1999),  Truck Traffic: 2%,  Average Future Daily Traffic: 15 (year 2019),  Features Intersected: WILD BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Poor,  Channel: Poor,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $337,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $487,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber,  Deck Protection: Internally Sealed
Find on map >>

Structure Number: 100803001908031,  Location: 1.2 MI TO JCT C4 TH36 (Lat: 44.693056,  Lng: -72.468889),  Route carried "on" structure: Other road C4035,  Year Built: 2000,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 10 (year 2004),  Truck Traffic: 2%,  Average Future Daily Traffic: 15 (year 2024),  Design Load: HS 25,  Features Intersected: WILD BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft)

Condition: Channel: Fair,  Culverts: Very good,  Operating Rating: 54.0 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $87,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $112,000 ( Estimate for 2007)
Find on map >>

Structure Number: 100803002208031,  Location: 0.1 MI JCT TH 17 + VT100 (Lat: 44.702222,  Lng: -72.558889),  Route carried "on" structure: Other road C3017,  Year Built: 1999,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 100 (year 1999),  Truck Traffic: 2%,  Average Future Daily Traffic: 150 (year 2019),  Design Load: HS 25,  Features Intersected: GIHON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 54.0 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $634,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $784,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 100803002308031,  Location: 0.6 MI JCT TH 13 + VT100 (Lat: 44.708889,  Lng: -72.569722),  Route carried "on" structure: Other road C3013,  Year Built: 1976,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 250 (year 1999),  Truck Traffic: 2%,  Average Future Daily Traffic: 375 (year 2019),  Design Load: HS 20,  Features Intersected: WHITE BR. GIHON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Poor,  Operating Rating: 54.0 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: August 2007,  Underwater Inspection Date: August 2007,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $150,000 ( Estimate for 2007)
Find on map >>

Structure Number: 100803002708031,  Location: 0.1 MI E JCT VT 100 (Lat: 44.697778,  Lng: -72.576944),  Route carried "on" structure: Other road C3007,  Year Built: 1983,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 150 (year 1999),  Truck Traffic: 2%,  Average Future Daily Traffic: 225 (year 2019),  Design Load: HS 20,  Features Intersected: GIHON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $388,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $538,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 200029022008032,  Location: 1.8 MI S JCT. VT.118 (Lat: 44.696667,  Lng: -72.577500),  Route carried "on" structure: State highway 100,  Year Built: 1932,  Year Reconstructed: 1971,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 4,200 (year 1998),  Truck Traffic: 9%,  Average Future Daily Traffic: 6,300 (year 2018),  Design Load: H 15,  Features Intersected: GIHON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 273.654,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1500001,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $465,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $615,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 200029022108032,  Location: 1.3 MI S JCT. VT.118 (Lat: 44.700556,  Lng: -72.569167),  Route carried "on" structure: State highway 100,  Year Built: 1932,  Year Reconstructed: 1971,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 4,200 (year 1998),  Truck Traffic: 9%,  Average Future Daily Traffic: 6,300 (year 2018),  Design Load: H 15,  Features Intersected: GIHON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 274.442,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1500001,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 81.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 53.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $460,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $610,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 200029022208032,  Location: 0.6 MI N JCT. VT.118 (Lat: 44.711111,  Lng: -72.534444),  Route carried "on" structure: State highway 100,  Year Built: 1929,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 3,200 (year 1998),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,800 (year 2018),  Design Load: H 15,  Features Intersected: GIHON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 277.435,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1500001,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 58.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $545,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $695,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 200029022308032,  Location: 1.2 MI N JCT. VT.118 (Lat: 44.713611,  Lng: -72.522500),  Route carried "on" structure: State highway 100,  Year Built: 1931,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 3,200 (year 1998),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,800 (year 2018),  Design Load: H 15,  Features Intersected: GIHON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 278.465,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1500001,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $353,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $503,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 200029022408032,  Location: 1.4 MI N JCT. VT.118 (Lat: 44.713611,  Lng: -72.521111),  Route carried "on" structure: State highway 100,  Year Built: 1931,  Year Reconstructed: 1952,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,800 (year 1998),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,200 (year 2018),  Design Load: H 15,  Features Intersected: GIHON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 278.577,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1500001,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $363,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $513,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric

Discuss this city on our hugely popular Vermont forum

Back to: Eden, VT, Vermont, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.