U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for El Cerrito, California (CA) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: El Cerrito, CA, California, California forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 12
Total length: 55 meters (180ft)
Total average daily traffic: 269,200
Total average daily truck traffic: 8,927
National Bridge Inventory (NBI) Registered Bridges for El Cerrito
No street view available for this location

New bridges - Historical Statistics

  • 1950-1959: 3
  • 1960-1969: 9

Average Daily Traffic

Find on map >>   Show street view

Structure Number: 28 0034,  Location: 04-CC-080-1.67-ECR (Lat: 37.920889,  Lng: -122.317861),  Route carried "on" structure: Interstate 80,  Year Built: 1956,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 10.64m (34.91ft),  Average Daily Traffic: 179,000 (year 2009),  Truck Traffic: 3%,  Average Future Daily Traffic: 221,000 (year 2027),  Design Load: HS 20,  Features Intersected: POTRERO AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.670,  Lanes on structure: 8,  Lanes under structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 38.9m (127.6ft),  Skew: 29 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 38.9m (127.6ft),  Out-to-Out Width: 40.7m (133.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 76.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2009,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 28 0034,  Location: 04-CC-080-1.67-ECR (Lat: 37.920889,  Lng: -122.317861),  Route carried "under" structure: City street A275,  Year Built: 1956,  Structure Length: 10.64m (34.91ft),  Average Daily Traffic: 6,300 (year 2009),  Truck Traffic: 7%,  Features Intersected: POTRERO AVENUE,  Facility Carried by Structure: INTERSTATE 80
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 28 0034,  Location: 04-CC-080-1.67-ECR (Lat: 37.920889,  Lng: -122.317861),  Route carried "under" structure: Ramp Interstate ,  Year Built: 1956,  Structure Length: 10.64m (34.91ft),  Average Daily Traffic: 7,400 (year 2009),  Truck Traffic: 7%,  Features Intersected: POTRERO AVENUE,  Facility Carried by Structure: INTERSTATE 80
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 28C014,  Location: 04-CC-038-0-ECR (Lat: 37.930833,  Lng: -122.321944),  Route carried "under" structure: City street A038,  Year Built: 1969,  Structure Length: 2.28m (7.48ft),  Average Daily Traffic: 26,780 (year 2005),  Truck Traffic: 6%,  Features Intersected: SAN PABLO AVE,  Facility Carried by Structure: BART
Minimum Vertical Clearance: 4.56m (14.96ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 12.1m (39.7ft)

Find on map >>   Show street view

Structure Number: 28C0304,  Location: 04-CC-700-0-ECR (Lat: 37.901944,  Lng: -122.298889),  Route carried "under" structure: City street A700,  Year Built: 1965,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 10,510 (year 2005),  Truck Traffic: 2%,  Features Intersected: FAIRMOUNT AVE,  Facility Carried by Structure: BART
Minimum Vertical Clearance: 4.84m (15.88ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 28C0305,  Location: 04-CC-701-0-ECR (Lat: 37.902778,  Lng: -122.300000),  Route carried "under" structure: City street A701,  Year Built: 1965,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 6,630 (year 2005),  Truck Traffic: 2%,  Features Intersected: CENTRAL AVE,  Facility Carried by Structure: BART
Minimum Vertical Clearance: 5.68m (18.64ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 24.7m (81.0ft)

Find on map >>   Show street view

Structure Number: 28C0306,  Location: 04-CC-702-0-ECR (Lat: 37.908889,  Lng: -122.303889),  Route carried "under" structure: City street A702,  Year Built: 1965,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 5,500 (year 2005),  Truck Traffic: 2%,  Features Intersected: STOCKTON AVE,  Facility Carried by Structure: BART (R3003)
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 28C0307,  Location: 04-CC-042-0-ECR (Lat: 37.911944,  Lng: -122.306944),  Route carried "under" structure: City street A042,  Year Built: 1965,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 7,260 (year 2005),  Truck Traffic: 2%,  Features Intersected: MOESER LANE,  Facility Carried by Structure: BARTD (R3003)
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 28C0308,  Location: 04-CC-703-0-ECR (Lat: 37.915833,  Lng: -122.310000),  Route carried "under" structure: City street A703,  Year Built: 1965,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 2,960 (year 2005),  Truck Traffic: 2%,  Features Intersected: MANILA AVE,  Facility Carried by Structure: BARTD (R3003)
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 28C0309,  Location: 04-CC-725-0-ECR (Lat: 37.920833,  Lng: -122.313889),  Route carried "under" structure: City street A725,  Year Built: 1965,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 8,080 (year 2005),  Truck Traffic: 2%,  Features Intersected: POTRERO AVE,  Facility Carried by Structure: BARTD (R3003)
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 28C031,  Location: 04-CC-044-0-ECR (Lat: 37.923889,  Lng: -122.315833),  Route carried "under" structure: City street A044,  Year Built: 1965,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 2,880 (year 2005),  Truck Traffic: 2%,  Features Intersected: HILL ST,  Facility Carried by Structure: BARTD (R3003)
Minimum Vertical Clearance: 5.81m (19.06ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 24.7m (81.0ft)

Find on map >>   Show street view

Structure Number: 28C0311,  Location: 04-CC-045-0-ECR (Lat: 37.925833,  Lng: -122.317778),  Route carried "under" structure: City street A045,  Year Built: 1965,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 5,900 (year 2010),  Truck Traffic: 2%,  Features Intersected: CUTTING BLVD,  Facility Carried by Structure: BARTD
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 0.000,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 25.3m (83.0ft)

Jump to a detailed profile or search site with Google Custom Search
Business Search - 14 Million verified businesses
Search for: near: 

Discuss this city on our hugely popular California forum

Back to: El Cerrito, CA, California, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2014 Advameg, Inc.