![]() |
Bridge Statistics for El Cerrito, California (CA) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: El Cerrito, CA, California, California forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 11 Total length: 38 meters (125ft) Total average daily traffic: 199,760 Total average daily truck traffic: 13,730 National Bridge Inventory (NBI) Registered Bridges for El Cerrito
Find on map >>
Structure Number: 28 0034, Location: 04-CC-080-1.67-ECR (Lat: 37.921389, Lng: -122.317778), Route carried "on" structure: Interstate 80, Year Built: 1956, Year Reconstructed: 1997, Status: Open, Structure Length: 7.47m (24.51ft), Average Daily Traffic: 159,800 (year 1997), Truck Traffic: 8%, Average Future Daily Traffic: 226,360 (year 2027), Design Load: HS 20, Features Intersected: POTRERO AVENUE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.670, Lanes on structure: 8, Lanes under structure: 4, Base Highway Network: Yes (, Subroute: 1), Owner: State Highway Agency, Approaching Roadway Width: 38.9m (127.6ft), Skew: 29 degrees, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 4, Length of Maximum Span: 25.0m (82.0ft), Curb-To-Curb Width: 38.9m (127.6ft), Out-to-Out Width: 40.7m (133.5ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 71.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 43.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 48 months, Inspection Date: October 2005, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 28 0034, Location: 04-CC-080-1.67-ECR (Lat: 37.921389, Lng: -122.317778), Route carried "under" structure: City street A275, Year Built: 1956, Structure Length: 7.47m (24.51ft), Average Daily Traffic: 4,910 (year 1998), Truck Traffic: 5%, Features Intersected: POTRERO AVENUE, Facility Carried by Structure: I 80 Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.0m (82.0ft) Find on map >>
Structure Number: 28C014, Location: 0.9 MI NORTH OF SR 123 (Lat: 37.930833, Lng: -122.321944), Route carried "under" structure: City street A038, Year Built: 1969, Structure Length: 2.28m (7.48ft), Truck Traffic: 6%, Features Intersected: SAN PABLO AVE, Facility Carried by Structure: BART Minimum Vertical Clearance: 4.56m (14.96ft), Kilometerpoint: 0.000, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 12.1m (39.7ft) Find on map >>
Structure Number: 28C0304, Location: 04-CC-700-0-ECR (Lat: 37.901944, Lng: -122.298889), Route carried "under" structure: City street A700, Year Built: 1965, Structure Length: 3.66m (12.01ft), Average Daily Traffic: 10,400 (year 1974), Truck Traffic: 2%, Features Intersected: FAIRMOUNT AVE, Facility Carried by Structure: BART Minimum Vertical Clearance: 4.84m (15.88ft), Kilometerpoint: 0.000, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Length of Maximum Span: 18.3m (60.0ft) Find on map >>
Structure Number: 28C0305, Location: 0.2 MI EAST OF SR 123 (Lat: 37.902778, Lng: -122.300000), Route carried "under" structure: City street A701, Year Built: 1965, Structure Length: 2.53m (8.30ft), Truck Traffic: 2%, Features Intersected: CENTRAL AVE, Facility Carried by Structure: BART Minimum Vertical Clearance: 0.57m (1.87ft), Kilometerpoint: 0.000, Lanes under structure: 3, Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Length of Maximum Span: 24.7m (81.0ft) Find on map >>
Structure Number: 28C0306, Location: OVER STOCKTON AVE (Lat: 37.908889, Lng: -122.303889), Route carried "under" structure: City street A702, Year Built: 1965, Structure Length: 2.53m (8.30ft), Average Daily Traffic: 5,000 (year 1974), Truck Traffic: 2%, Features Intersected: STOCKTON AVE, Facility Carried by Structure: BART (R3003) Minimum Vertical Clearance: 5.02m (16.47ft), Kilometerpoint: 0.000, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Length of Maximum Span: 25.0m (82.0ft) Find on map >>
Structure Number: 28C0307, Location: OVER MOESER LANE (Lat: 37.911944, Lng: -122.306944), Route carried "under" structure: City street A042, Year Built: 1965, Structure Length: 2.53m (8.30ft), Average Daily Traffic: 6,100 (year 1973), Truck Traffic: 2%, Features Intersected: MOESER LANE, Facility Carried by Structure: BARTD (R3003) Minimum Vertical Clearance: 4.87m (15.98ft), Kilometerpoint: 0.000, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Length of Maximum Span: 25.0m (82.0ft) Find on map >>
Structure Number: 28C0308, Location: OVER MANILA AVE (Lat: 37.915833, Lng: -122.310000), Route carried "under" structure: City street A703, Year Built: 1965, Structure Length: 2.62m (8.60ft), Average Daily Traffic: 3,000 (year 1974), Truck Traffic: 2%, Features Intersected: MANILA AVE, Facility Carried by Structure: BARTD (R3003) Minimum Vertical Clearance: 4.97m (16.31ft), Kilometerpoint: 0.000, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Length of Maximum Span: 25.9m (85.0ft) Find on map >>
Structure Number: 28C0309, Location: 04-CC-725-0-ECR (Lat: 37.920833, Lng: -122.313889), Route carried "under" structure: City street A725, Year Built: 1965, Structure Length: 2.56m (8.40ft), Average Daily Traffic: 5,100 (year 1974), Truck Traffic: 2%, Features Intersected: POTRERO AVE, Facility Carried by Structure: BARTD (R3003) Minimum Vertical Clearance: 5.49m (18.01ft), Kilometerpoint: 0.000, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Length of Maximum Span: 25.0m (82.0ft) Find on map >>
Structure Number: 28C031, Location: OVER HILL ST (Lat: 37.923889, Lng: -122.315833), Route carried "under" structure: City street A044, Year Built: 1965, Structure Length: 2.53m (8.30ft), Average Daily Traffic: 2,650 (year 1975), Truck Traffic: 2%, Features Intersected: HILL ST, Facility Carried by Structure: BARTD (R3003) Minimum Vertical Clearance: 5.81m (19.06ft), Kilometerpoint: 0.000, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Length of Maximum Span: 24.7m (81.0ft) Find on map >>
Structure Number: 28C0311, Location: OVER CUTTING BLVD (Lat: 37.925833, Lng: -122.317778), Route carried "under" structure: City street A045, Year Built: 1965, Structure Length: 2.53m (8.30ft), Average Daily Traffic: 2,800 (year 1975), Truck Traffic: 2%, Features Intersected: CUTTING BLVD, Facility Carried by Structure: BARTD Minimum Vertical Clearance: 0.55m (1.80ft), Kilometerpoint: 0.000, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Length of Maximum Span: 25.3m (83.0ft) Discuss this city on our hugely popular California forum Back to: El Cerrito, CA, California, All US cities.
|
![]() |