U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Elba, Alabama (AL) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Elba, AL, Alabama, Alabama forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 10
Total length: 74 meters (243ft)
Total costs: $20,550,000
Total average daily traffic: 25,470
Total average daily truck traffic: 1,532
Total future (year 2023) average daily traffic: 37,267
National Bridge Inventory (NBI) Registered Bridges for Elba

New bridges - Historical Statistics

  • 1930-1939: 2
  • 1940-1949: 0
  • 1950-1959: 1
  • 1960-1969: 0
  • 1970-1979: 1
  • 1980-1989: 3
  • 1990-1999: 3

Reconstructed bridges - Historical Statistics

  • 1950-1959: 1
  • 1960-1969: 0
  • 1970-1979: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 3994,  Location: ELBA (Lat: 31.400000,  Lng: -86.066667),  Route carried "on" structure: City street ,  Year Built: 1951,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 540 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 800 (year 2023),  Design Load: H 15,  Features Intersected: BEAVER DAM CREEK,  Facility Carried by Structure: CAROLINE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.219,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 47.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.97m (26.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $798,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $1,197,000 ( Estimate for 2008),  Deck Structure Type: Concrete Precast Panels
Find on map >>

Structure Number: 6434,  Location: CITY OF ELBA (Lat: 31.400000,  Lng: -86.050000),  Route carried "on" structure: US 84,  Year Built: 1930,  Year Reconstructed: 1959,  Status: Temporarily open,  Structure Length: 21.03m (69.00ft),  Average Daily Traffic: 5,040 (year 2007),  Truck Traffic: 9%,  Average Future Daily Traffic: 5,070 (year 2027),  Design Load: H 15,  Features Intersected: PEA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 265.405,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 15,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 34.2 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 20.5 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 21.03m (69.00ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Underwater Inspection Date: January 2007,  Bridge Improvement Cost: $2,955,000,  Roadway Improvement Cost: $296,000,  Total Project Cost: $4,433,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 10989,  Location: 1.3 MI.N.SR 189 (Lat: 31.433333,  Lng: -86.066667),  Route carried "on" structure: State highway 87,  Year Built: 1973,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 3,400 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,474 (year 2027),  Design Load: H 15,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.287,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 65.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $312,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $468,000 ( Estimate for 2008)
Find on map >>

Structure Number: 11317,  Location: 1.0 MI.W.87 (Lat: 31.416667,  Lng: -86.066667),  Route carried "on" structure: US 84,  Year Built: 1938,  Year Reconstructed: 1975,  Status: Open,  Structure Length: 8.75m (28.71ft),  Average Daily Traffic: 4,240 (year 2007),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,180 (year 2027),  Design Load: H 15,  Features Intersected: BEAVER DAM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 263.722,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 23 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 30.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.72m (31.89ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Underwater Inspection Date: January 2007,  Bridge Improvement Cost: $2,088,000,  Roadway Improvement Cost: $209,000,  Total Project Cost: $3,132,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 12274,  Location: 2.0 MILES WEST ELBA (Lat: 31.400000,  Lng: -86.083333),  Route carried "on" structure: City street 400,  Year Built: 1980,  Status: Open,  Structure Length: 4.05m (13.29ft),  Average Daily Traffic: 160 (year 2003),  Truck Traffic: 5%,  Average Future Daily Traffic: 270 (year 2023),  Design Load: H 15,  Features Intersected: MOORES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 45.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.01m (16.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $505,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $758,000 ( Estimate for 2008),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 134,  Location: 0.3 MI. N. US 84 (Lat: 31.416667,  Lng: -86.083333),  Route carried "on" structure: State highway 203,  Year Built: 1984,  Status: Open,  Structure Length: 9.85m (32.32ft),  Average Daily Traffic: 3,890 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 12,788 (year 2027),  Design Load: HS 20,  Features Intersected: BEAVER DAM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.952,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 8,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.78m (35.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $2,008,000,  Roadway Improvement Cost: $201,000,  Total Project Cost: $3,012,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 13401,  Location: 0.2 MI. N. SR 87 (Lat: 31.416667,  Lng: -86.050000),  Route carried "on" structure: State highway 203,  Year Built: 1984,  Status: Open,  Structure Length: 9.63m (31.59ft),  Average Daily Traffic: 2,070 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,390 (year 2027),  Design Load: HS 20,  Features Intersected: WHITEWATER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.262,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.57m (34.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $1,969,000,  Roadway Improvement Cost: $197,000,  Total Project Cost: $2,954,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 15242,  Location: 1 MI. S.JCT US 84 (Lat: 31.400000,  Lng: -86.066667),  Route carried "on" structure: State highway 189,  Year Built: 1990,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 3,040 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,043 (year 2027),  Design Load: HS 20,  Features Intersected: BEAVER DAM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.342,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.25m (23.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $1,488,000,  Roadway Improvement Cost: $149,000,  Total Project Cost: $2,232,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 1571,  Location: 0.2 MI.N COFFEE 42 (Lat: 31.383333,  Lng: -86.083333),  Route carried "on" structure: State highway 189,  Year Built: 1993,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 2,300 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,302 (year 2027),  Design Load: HS 20,  Features Intersected: MOORE'S CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.822,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.2m (17.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.91m (9.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $662,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $993,000 ( Estimate for 2008)
Find on map >>

Structure Number: 16825,  Location: ELBA (Lat: 31.416667,  Lng: -86.083333),  Route carried "on" structure: City street ,  Year Built: 1996,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 790 (year 2003),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,950 (year 2023),  Design Load: HS 20,  Features Intersected: BEAVER DAM CREEK,  Facility Carried by Structure: ELBA CITY SCHOOL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $914,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $1,371,000 ( Estimate for 2008),  Deck Structure Type: Concrete Precast Panels

Discuss this city on our hugely popular Alabama forum

Back to: Elba, AL, Alabama, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.