U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Elkhart, Indiana (IN) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Elkhart, IN, Indiana, Indiana forum, All US cities.





Parts: 1, 2, 3


National Bridge Inventory (NBI) Statistics
Number of bridges: 120
Total length: 687 meters (2,254ft)
Total costs: $13,671,000
Total average daily traffic: 1,148,164
Total average daily truck traffic: 73,922
National Bridge Inventory (NBI) Registered Bridges for Elkhart

New bridges - Historical Statistics

  • 1910-1919: 1
  • 1920-1929: 3
  • 1930-1939: 4
  • 1940-1949: 0
  • 1950-1959: 31
  • 1960-1969: 17
  • 1970-1979: 6
  • 1980-1989: 7
  • 1990-1999: 48
  • 2000-2009: 3

Reconstructed bridges - Historical Statistics

  • 1970-1979: 9
  • 1980-1989: 7
  • 1990-1999: 13
  • 2000-2009: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 4803,  Location: 2.2 km E SR 19 (Lat: 41.731667,  Lng: -85.948333),  Route carried "under" structure: County highway ,  Year Built: 1956,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 1,613 (year 2004),  Truck Traffic: 5%,  Features Intersected: COUNTY ROAD 11,  Facility Carried by Structure: I-90 WBL
Minimum Vertical Clearance: 4.26m (13.98ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 10.0m (32.8ft)

Find on map >>

Structure Number: 4804,  Location: 3.8 km E SR 19 (Lat: 41.730000,  Lng: -85.928333),  Route carried "under" structure: Interstate 90,  Year Built: 1956,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 29,747 (year 2004),  Truck Traffic: 5%,  Features Intersected: I-90,  Facility Carried by Structure: CR 13
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 151.326,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.9m (65.3ft)

Find on map >>

Structure Number: 4805,  Location: 5 km E SR 19 (Lat: 41.730000,  Lng: -85.913333),  Route carried "under" structure: Interstate 90,  Year Built: 1956,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 29,747 (year 2004),  Truck Traffic: 5%,  Features Intersected: I-90,  Facility Carried by Structure: CR 113
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 152.533,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.9m (65.3ft)

Find on map >>

Structure Number: 4806,  Location: 6.2 km E SR 19 (Lat: 41.730000,  Lng: -85.898333),  Route carried "under" structure: County highway ,  Year Built: 1956,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 5,644 (year 2004),  Truck Traffic: 5%,  Features Intersected: COUNTY ROAD 15,  Facility Carried by Structure: I-90 EBL
Minimum Vertical Clearance: 4.31m (14.14ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 10.0m (32.8ft)

Find on map >>

Structure Number: 4807,  Location: 6.2 km E SR 19 (Lat: 41.730000,  Lng: -85.898333),  Route carried "under" structure: County highway ,  Year Built: 1956,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 5,644 (year 2004),  Truck Traffic: 5%,  Features Intersected: COUNTY ROAD 15,  Facility Carried by Structure: I-90 WBL
Minimum Vertical Clearance: 4.31m (14.14ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 10.0m (32.8ft)

Find on map >>

Structure Number: 48073,  Location: 7 km E SR 19 (Lat: 41.731667,  Lng: -85.890000),  Route carried "under" structure: Interstate 90,  Year Built: 1996,  Structure Length: 8.59m (28.18ft),  Average Daily Traffic: 29,747 (year 2004),  Truck Traffic: 5%,  Features Intersected: I-90,  Facility Carried by Structure: CR 17
Minimum Vertical Clearance: 5.02m (16.47ft),  Kilometerpoint: 154.576,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>

Structure Number: 48076,  Location: 7.1 km E SR 19 (Lat: 41.731667,  Lng: -85.885000),  Route carried "under" structure: Interstate 90,  Year Built: 1997,  Structure Length: 7.13m (23.39ft),  Average Daily Traffic: 29,747 (year 2004),  Truck Traffic: 5%,  Features Intersected: I-90 (TOLL ROAD)
Minimum Vertical Clearance: 5.02m (16.47ft),  Kilometerpoint: 154.624,  Lanes on structure: 2,  Lanes under structure: 5,  Toll: On toll road,  Material/Design: Steel continuous,  Length of Maximum Span: 35.2m (115.5ft)

Find on map >>

Structure Number: 7519,  Location: 4.5 km E SR 19 (Lat: 41.646667,  Lng: -85.953333),  Route carried "under" structure: County highway ,  Year Built: 1991,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 118 (year 2004),  Truck Traffic: 5%,  Features Intersected: COUNTY ROAD 20,  Facility Carried by Structure: US 20 EBL
Minimum Vertical Clearance: 0.51m (1.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>

Structure Number: 752,  Location: 4.5 km E SR 19 (Lat: 41.646667,  Lng: -85.953333),  Route carried "under" structure: County highway ,  Year Built: 1991,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 118 (year 2004),  Truck Traffic: 5%,  Features Intersected: COUNTY ROAD 20,  Facility Carried by Structure: US 20 WBL
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>

Structure Number: 7521,  Location: 5.6 km E SR 19 (Lat: 41.653333,  Lng: -85.941667),  Route carried "under" structure: US 33,  Year Built: 1991,  Structure Length: 14.23m (46.69ft),  Average Daily Traffic: 12,067 (year 2004),  Truck Traffic: 5%,  Features Intersected: US 33 & CONRAIL,  Facility Carried by Structure: US 20 EBL
Minimum Vertical Clearance: 7.77m (25.49ft),  Kilometerpoint: 36.299,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>

Structure Number: 7522,  Location: 5.6 km E SR 19 (Lat: 41.653333,  Lng: -85.941667),  Route carried "under" structure: US 33,  Year Built: 1991,  Structure Length: 14.23m (46.69ft),  Average Daily Traffic: 12,067 (year 2004),  Truck Traffic: 5%,  Features Intersected: US 33 & CONRAIL,  Facility Carried by Structure: US 20 WBL
Minimum Vertical Clearance: 7.77m (25.49ft),  Kilometerpoint: 36.315,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>

Structure Number: 7523,  Location: 0.2 km E US 33 (Lat: 41.653333,  Lng: -85.940000),  Route carried "under" structure: County highway ,  Year Built: 1992,  Structure Length: 4.90m (16.08ft),  Average Daily Traffic: 118 (year 2004),  Truck Traffic: 5%,  Features Intersected: COUNTY ROAD 45,  Facility Carried by Structure: US 20 EBL
Minimum Vertical Clearance: 6.83m (22.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.5m (60.7ft)

Find on map >>

Structure Number: 7524,  Location: 0.2 km E US 33 (Lat: 41.653333,  Lng: -85.940000),  Route carried "under" structure: County highway ,  Year Built: 1992,  Structure Length: 4.90m (16.08ft),  Average Daily Traffic: 118 (year 2004),  Truck Traffic: 5%,  Features Intersected: COUNTY ROAD 45,  Facility Carried by Structure: US 20 WBL
Minimum Vertical Clearance: 6.93m (22.74ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.5m (60.7ft)

Find on map >>

Structure Number: 7526,  Location: 1.7 km E US 33 (Lat: 41.658333,  Lng: -85.921667),  Route carried "under" structure: County highway ,  Year Built: 1991,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 118 (year 2004),  Truck Traffic: 5%,  Features Intersected: COUNTY ROAD 13,  Facility Carried by Structure: US 20 EBL
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>

Structure Number: 75265,  Location: 1.7 km E US 33 (Lat: 41.658333,  Lng: -85.921667),  Route carried "under" structure: County highway ,  Year Built: 1991,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 118 (year 2004),  Truck Traffic: 5%,  Features Intersected: COUNTY ROAD 13,  Facility Carried by Structure: US 20 WBL
Minimum Vertical Clearance: 4.49m (14.73ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>

Structure Number: 7528,  Location: 2.3 km E US 33 (Lat: 41.658333,  Lng: -85.915000),  Route carried "under" structure: US 20,  Year Built: 1991,  Structure Length: 6.97m (22.87ft),  Average Daily Traffic: 131 (year 2004),  Truck Traffic: 5%,  Features Intersected: US 20,  Facility Carried by Structure: CR 115
Minimum Vertical Clearance: 5.02m (16.47ft),  Kilometerpoint: 13.145,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.2m (112.2ft)

Find on map >>

Structure Number: 7529,  Location: 3.3 km E US 33 (Lat: 41.660000,  Lng: -85.905000),  Route carried "under" structure: US 20,  Year Built: 1991,  Structure Length: 9.47m (31.07ft),  Average Daily Traffic: 131 (year 2004),  Truck Traffic: 5%,  Features Intersected: US 20,  Facility Carried by Structure: CR 18
Minimum Vertical Clearance: 0.50m (1.64ft),  Kilometerpoint: 14.094,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.4m (152.2ft)

Find on map >>

Structure Number: 753,  Location: 4.4 km E US 33 (Lat: 41.666667,  Lng: -85.895000),  Route carried "under" structure: US 20,  Year Built: 1991,  Structure Length: 14.47m (47.47ft),  Average Daily Traffic: 131 (year 2004),  Truck Traffic: 5%,  Features Intersected: US 20 & WB RAMP
Minimum Vertical Clearance: 0.52m (1.71ft),  Kilometerpoint: 15.188,  Lanes on structure: 1,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.5m (165.7ft)

Find on map >>

Structure Number: 7531,  Location: 4.6 km E US 33 (Lat: 41.668333,  Lng: -85.888333),  Route carried "under" structure: US 20,  Year Built: 1991,  Structure Length: 4.20m (13.78ft),  Average Daily Traffic: 131 (year 2004),  Truck Traffic: 5%,  Features Intersected: US 20 SW RAMP
Minimum Vertical Clearance: 0.52m (1.71ft),  Kilometerpoint: 15.414,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.5m (60.7ft)

Find on map >>

Structure Number: 7532,  Location: 4.9 km E US 33 (Lat: 41.668333,  Lng: -85.886667),  Route carried "under" structure: County highway ,  Year Built: 1992,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 131 (year 2004),  Truck Traffic: 5%,  Features Intersected: COUNTY ROAD 17,  Facility Carried by Structure: US 20 EB RAMP
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.1m (95.5ft)

Find on map >>

Structure Number: 7533,  Location: 4.9 km E US 33 (Lat: 41.668333,  Lng: -85.888333),  Route carried "under" structure: County highway ,  Year Built: 1992,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 131 (year 2004),  Truck Traffic: 5%,  Features Intersected: COUNTY ROAD 17,  Facility Carried by Structure: US 20 EBL
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.1m (95.5ft)

Find on map >>

Structure Number: 75335,  Location: 4.9 km E US 33 (Lat: 41.668333,  Lng: -85.888333),  Route carried "under" structure: County highway ,  Year Built: 1992,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 131 (year 2004),  Truck Traffic: 5%,  Features Intersected: COUNTY ROAD 17,  Facility Carried by Structure: US 20 WBL
Minimum Vertical Clearance: 0.53m (1.74ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.1m (95.5ft)


Parts: 1, 2, 3

Discuss this city on our hugely popular Indiana forum

Back to: Elkhart, IN, Indiana, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.