Bridge Statistics for Erving, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 180ft / 54.7mTotal length
  • $35,615,000Total costs
  • 41,951Total average daily traffic
  • 2,682Total average daily truck traffic
  • 56,397Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Erving
  • No street view available for this location

New bridges in Erving, MA - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11910-1919
  • 21930-1939
  • 11940-1949
  • 11950-1959
  • 11980-1989
  • 11990-1999
  • 22000-2009
Reconstructed bridges in Erving, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 21980-1989
  • 01990-1999
  • 22000-2009
Average Bridge Daily Traffic in Erving, MA
Average Bridge Truck Traffic in Erving, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 44.4%Good
  • 44.4%Satisfactory
  • 11.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 22.2%Very good
  • 22.2%Good
  • 11.1%Satisfactory
  • 33.3%Fair
  • 11.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Very good
  • 33.3%Good
  • 22.2%Satisfactory
  • 33.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.5%Very good
  • 37.5%Good
  • 25.0%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: E100020W3DOTNBI,  Location: JCT RT 63 & MILLERS RIVER (Lat: 42.580581,  Lng: -72.495506),  Route carried "on" structure: State highway 63,  Year Built: 1953,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 6.13m (20.11ft),  Average Daily Traffic: 4,400 (year 2004),  Truck Traffic: 9%,  Average Future Daily Traffic: 11,371 (year 2031),  Design Load: HS 20,  Features Intersected: WATER MILLERS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.150,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.8m (97.8ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 96.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $527,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $791,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: E100050PVMUNNBI,  Location: 150' N OF INT NEWTON ST (Lat: 42.579167,  Lng: -72.490564),  Route carried "on" structure: City street ,  Year Built: 1937,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 4.76m (15.62ft),  Average Daily Traffic: 1,140 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,224 (year 2033),  Design Load: H 20,  Features Intersected: WATER MILLERS RIVER,  Facility Carried by Structure: HWY PAPER MLL RD
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 46.9m (153.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 50.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.80m (15.75ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Critical Feature Inspection Date: January 2022,  Bridge Improvement Cost: $1,264,000,  Roadway Improvement Cost: $127,000,  Total Project Cost: $1,897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: E100060LGMUNNBI,  Location: 600' E OF RT 2 (Lat: 42.597753,  Lng: -72.437897),  Route carried "on" structure: City street ,  Year Built: 1889,  Status: Posted for load,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 140 (year 2018),  Average Future Daily Traffic: 2,251 (year 2033),  Design Load: H 10,  Features Intersected: WATER MILLERS RIVER,  Facility Carried by Structure: HWY FARLEY RD
Minimum Vertical Clearance: 5.02m (16.47ft),  Kilometerpoint: 0.032,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Aluminum, Iron,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.4m (122.7ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 16.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 12.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.90m (16.08ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: January 2022,  Critical Feature Inspection Date: January 2022,  Underwater Inspection Date: September 2021,  Bridge Improvement Cost: $2,978,000,  Roadway Improvement Cost: $298,000,  Total Project Cost: $4,468,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: E100080PTMUNNBI,  Location: 0.2 MI S OF RT 2 (Lat: 42.598278,  Lng: -72.402756),  Route carried "on" structure: City street ,  Year Built: 1910,  Year Reconstructed: 1987,  Status: Posted for load,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 33 (year 2020),  Average Future Daily Traffic: 158 (year 2031),  Design Load: H 15,  Features Intersected: WATER MILLERS RIVER,  Facility Carried by Structure: HWY ARCH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.6m (51.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 38.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 4.10m (13.45ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 47 months,  Inspection Date: March 2022,  Underwater Inspection Date: July 2018,  Bridge Improvement Cost: $1,139,000,  Roadway Improvement Cost: $114,000,  Total Project Cost: $1,709,000 ( Estimate for 2022),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: E100110PWMUNNBI,  Location: 0.2 MI N OF ST 2 (Lat: 42.602444,  Lng: -72.399639),  Route carried "on" structure: City street ,  Year Built: 1940,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 905 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 474 (year 2031),  Features Intersected: WATER KEYUP BROOK,  Facility Carried by Structure: HWY CHURCH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.4m (27.6ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 9.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 5.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $1,140,000,  Roadway Improvement Cost: $115,000,  Total Project Cost: $1,711,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: E100138UWDOTNBI,  Location: 0.7 M E CONN RIVER (Lat: 42.589219,  Lng: -72.490158),  Route carried "on" structure: Other road ,  Year Built: 2008,  Status: Open,  Structure Length: 3.99m (13.09ft),  Average Daily Traffic: 8,668 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 12,254 (year 2031),  Design Load: HS 25 or greater,  Features Intersected: RR NECRR,  Facility Carried by Structure: ST 2 MOWHAWK TRAI
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 94.144,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.1m (46.3ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 70.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $225,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $338,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: E100140UCDOTNBI,  Location: JCT ST 2 & CONN RIVER (Lat: 42.597856,  Lng: -72.496611),  Route carried "on" structure: State highway 2,  Year Built: 1931,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 26.40m (86.61ft),  Average Daily Traffic: 17,500 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 14,214 (year 2032),  Design Load: H 20,  Features Intersected: COMB RIVER RD&CONN RIV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 90.394,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 3,  Length of Maximum Span: 140.2m (460.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 32.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 26.50m (86.94ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $15,718,000,  Roadway Improvement Cost: $1,572,000,  Total Project Cost: $23,578,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: E10015BDPMDCNBI,  Location: ENTRANCE ERVING ST. PARK (Lat: 42.619378,  Lng: -72.393042),  Route carried "on" structure: State lands road ,  Year Built: 1994,  Year Reconstructed: 2011,  Status: Posted for load,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 100 (year 2012),  Average Future Daily Traffic: 158 (year 2033),  Features Intersected: WATER KEYUP BROOK,  Facility Carried by Structure: HWY LAUREL LK RD
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: State Agenciy,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 12.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 9.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $487,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $731,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: E100168RMDOTNBI,  Location: 1 MILE EAST OF CONN. RIV. (Lat: 42.584667,  Lng: -72.489475),  Route carried "on" structure: State highway 2,  Year Built: 2008,  Status: Open,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 8,936 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 14,214 (year 2031),  Design Load: HS 25 or greater,  Features Intersected: ST 63 LESTER MOORE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 94.627,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.7m (51.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 98.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: E100270PUMUNNBI,  Location: SO.OF 2, EAST OF ARCH ST (Lat: 42.598986,  Lng: -72.401103),  Route carried "on" structure: City street ,  Year Built: 1980,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 129 (year 2019),  Truck Traffic: 40%,  Average Future Daily Traffic: 79 (year 2032),  Features Intersected: WATER KEYUP BROOK,  Facility Carried by Structure: HWY CRESCENT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.40m (1.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $261,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $392,000 ( Estimate for 2022)
Discuss Erving, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.