U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Essex, Vermont (VT) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Essex, VT, Vermont, Vermont forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 13
Total length: 52 meters (171ft)
Total costs: $18,777,000
Total average daily traffic: 64,300
Total average daily truck traffic: 5,550
National Bridge Inventory (NBI) Registered Bridges for Essex

New bridges - Historical Statistics

  • 1910-1919: 1
  • 1920-1929: 0
  • 1930-1939: 0
  • 1940-1949: 1
  • 1950-1959: 0
  • 1960-1969: 2
  • 1970-1979: 0
  • 1980-1989: 0
  • 1990-1999: 9

Average Daily Traffic

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 100406001904061,  Location: 0.1 MI TO JCT W VT128 (Lat: 44.554444,  Lng: -73.034722),  Route carried "on" structure: Other road C3044,  Year Built: 1967,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 50 (year 1999),  Truck Traffic: 2%,  Average Future Daily Traffic: 75 (year 2019),  Design Load: H 20,  Features Intersected: BROWNS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 5.1m (16.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 36.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.87m (9.42ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Critical Feature Inspection Date: October 2007,  Bridge Improvement Cost: $463,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $613,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 100406002004061,  Location: 0.04 MI TO JCT W VT2A (Lat: 44.519444,  Lng: -73.122500),  Route carried "on" structure: Other road C3023,  Year Built: 1910,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 1,500 (year 1999),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,250 (year 2019),  Features Intersected: NEW ENGLAND CENTRAL RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Fair,  Operating Rating: 54.0 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.47m (8.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $481,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $631,000 ( Estimate for 2007),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200030000504062,  Location: 2.1 MI E JCT. VT.128 (Lat: 44.502222,  Lng: -73.021389),  Route carried "on" structure: State highway 15,  Year Built: 1968,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 10,400 (year 1998),  Truck Traffic: 9%,  Average Future Daily Traffic: 15,600 (year 2018),  Design Load: HS 20,  Features Intersected: BROWNS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.342,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.14m (10.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $972,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $1,122,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200030002A04062,  Location: 1.5 MI E JCT. VT. 2A (Lat: 44.506944,  Lng: -73.088333),  Route carried "on" structure: State highway 15,  Year Built: 1993,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 11,000 (year 1998),  Truck Traffic: 10%,  Average Future Daily Traffic: 16,500 (year 2018),  Design Load: HS 25,  Features Intersected: VT 15 OVER VT 289
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.405,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 44.5m (146.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 18.7m (61.4ft),  Out-to-Out Width: 21.7m (71.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 81.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.55m (18.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $3,416,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $3,566,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 200033001304062,  Location: 0.1 MI E JCT. VT. 2A (Lat: 44.518333,  Lng: -73.121944),  Route carried "on" structure: Ramp State highway 289,  Year Built: 1993,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 6,500 (year 1998),  Truck Traffic: 10%,  Average Future Daily Traffic: 9,750 (year 2018),  Design Load: HS 25,  Features Intersected: RAMP D OVER NEC RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.598,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.3m (96.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 81.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 41.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.04m (19.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $1,599,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $1,749,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 200033001404062,  Location: 0.1 MI E JCT. VT. 2A (Lat: 44.516667,  Lng: -73.120833),  Route carried "on" structure: Ramp State highway 289,  Year Built: 1993,  Status: Open,  Structure Length: 10.21m (33.50ft),  Average Daily Traffic: 6,500 (year 1998),  Truck Traffic: 10%,  Average Future Daily Traffic: 9,750 (year 2018),  Design Load: HS 25,  Features Intersected: RAMP A OVER NEC RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.615,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 52.7m (172.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 77.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.22m (36.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $2,975,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $3,125,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 200033001704062,  Location: 0.9 MI E VT 15 (Lat: 44.500833,  Lng: -73.071944),  Route carried "on" structure: Ramp State highway 289,  Year Built: 1993,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 3,200 (year 1996),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,800 (year 2016),  Design Load: HS 25,  Features Intersected: ALDER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.814,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 89.1 metric tons,  Inventory Rating: 89.1 metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $194,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $219,000 ( Estimate for 2007)
Find on map >>

Structure Number: 200033001804062,  Location: 2.0 MI E JCT VT 15 (Lat: 44.487778,  Lng: -73.063611),  Route carried "on" structure: Ramp State highway 289,  Year Built: 1993,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 4,200 (year 1998),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,300 (year 2018),  Design Load: HS 25,  Features Intersected: ALDER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.450,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.2m (17.1ft)

Condition: Channel: Poor,  Culverts: Good,  Operating Rating: 89.1 metric tons,  Inventory Rating: 89.1 metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $229,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $254,000 ( Estimate for 2007)
Find on map >>

Structure Number: 200229000304062,  Location: 1.0 MI N JCT. VT.15 (Lat: 44.516389,  Lng: -73.040000),  Route carried "on" structure: State highway 128,  Year Built: 1940,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 4,200 (year 1998),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,300 (year 2018),  Design Load: H 15,  Features Intersected: BROWNS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.32m (10.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $712,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $862,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 2004060D1604061,  Location: 0.6 MI S JCT. VT 15 (Lat: 44.504722,  Lng: -73.078889),  Route carried "on" structure: County highway TH95,  Year Built: 1993,  Status: Open,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 670 (year 1997),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,005 (year 2017),  Design Load: HS 25,  Features Intersected: TH 95 OVER VT 289,  Facility Carried by Structure: TH 95 (ESSEX WAY)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 18.6m (61.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 43.3m (142.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 3.2m (10.5ft),  Curb-To-Curb Width: 18.7m (61.4ft),  Out-to-Out Width: 22.9m (75.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 43.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.43m (17.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $3,513,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $3,663,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 205408000804062,  Location: 0.34 MI TO JCT W VT117 (Lat: 44.471111,  Lng: -73.043889),  Route carried "on" structure: City street NWILR,  Year Built: 1993,  Status: Open,  Structure Length: 8.60m (28.22ft),  Average Daily Traffic: 3,800 (year 2004),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,700 (year 2024),  Design Load: HS 25,  Features Intersected: WINOOSKI RIVER,  Facility Carried by Structure: N. WILLISTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 42.1m (138.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 72.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.45m (31.00ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: August 2006,  Underwater Inspection Date: September 2003,  Bridge Improvement Cost: $2,823,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $2,973,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 200030002A04062,  Location: EXIT 9 (Lat: 44.506944,  Lng: -73.088333),  Route carried "under" structure: Ramp State highway 289,  Year Built: 1993,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 9,150 (year 1998),  Truck Traffic: 10%,  Features Intersected: VT 15 OVER VT 289,  Facility Carried by Structure: VT 00015 ML
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 15.286,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.5m (146.0ft)

Find on map >>

Structure Number: 2004060D1604061,  Location: EXIT 10 (Lat: 44.504722,  Lng: -73.078889),  Route carried "under" structure: Ramp State highway 289,  Year Built: 1993,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 3,130 (year 1997),  Truck Traffic: 6%,  Features Intersected: VT 289 UNDER TH 95,  Facility Carried by Structure: TH 0095
Minimum Vertical Clearance: 0.49m (1.61ft),  Kilometerpoint: 16.042,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.3m (142.1ft)

Discuss this city on our hugely popular Vermont forum

Back to: Essex, VT, Vermont, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.