Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Fairfield, Idaho (ID)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 43ft / 13.3mTotal length
  • $2,457,000Total costs
  • 18,280Total average daily traffic
  • 1,764Total average daily truck traffic
  • 27,420Total future (year 2039) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Fairfield
  • No street view available for this location

New bridges in Fairfield, ID - historical statistics
  • New bridges - historical statistics
  • 41950-1959
  • 31960-1969
  • 11970-1979
  • 11990-1999
  • 12000-2009
  • 22010-2019
Average Bridge Daily Traffic in Fairfield, ID
Average Bridge Truck Traffic in Fairfield, ID
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.3%Very good
  • 8.3%Good
  • 75.0%Satisfactory
  • 8.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.3%Very good
  • 8.3%Good
  • 66.7%Satisfactory
  • 16.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Very good
  • 58.3%Satisfactory
  • 16.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.7%Very good
  • 25.0%Good
  • 50.0%Satisfactory
  • 8.3%Fair
Find on map >>   Show street view

Structure Number: 15045,  Location: 0.1 W. FAIRFIELD (Lat: 43.342194,  Lng: -114.794500),  Route carried "on" structure: US 20,  Year Built: 1958,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,800 (year 2019),  Truck Traffic: 19%,  Average Future Daily Traffic: 2,700 (year 2039),  Design Load: HS 20,  Features Intersected: W.FK.SOLDIER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 244.674,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: US0,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1505,  Location: 0.2 E. FAIRFIELD (Lat: 43.342194,  Lng: -114.787694),  Route carried "on" structure: US 20,  Year Built: 1958,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,800 (year 2019),  Truck Traffic: 19%,  Average Future Daily Traffic: 2,700 (year 2039),  Design Load: HS 20,  Features Intersected: SOLDIER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 245.228,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: US0,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $290,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $436,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 15055,  Location: 1.2 E. FAIRFIELD (Lat: 43.341972,  Lng: -114.769667),  Route carried "on" structure: US 20,  Year Built: 1958,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,800 (year 2019),  Truck Traffic: 19%,  Average Future Daily Traffic: 2,700 (year 2039),  Design Load: HS 20,  Features Intersected: E.FK.SOLDIER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 246.688,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: US0,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2019,  Bridge Improvement Cost: $290,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $435,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1506,  Location: 1.9 E. FAIRFIELD (Lat: 43.342194,  Lng: -114.754361),  Route carried "on" structure: US 20,  Year Built: 1958,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,800 (year 2019),  Truck Traffic: 19%,  Average Future Daily Traffic: 2,700 (year 2039),  Design Load: HS 20,  Features Intersected: JOHNSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 247.928,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: US0,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $290,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $436,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19531,  Location: 2.0 N. FAIRFIELD (Lat: 43.369722,  Lng: -114.789139),  Route carried "on" structure: County highway 2802,  Year Built: 1992,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 190 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 285 (year 2039),  Design Load: HS 20,  Features Intersected: SOLDIER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.291,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.0m (16.4ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 19721,  Location: 0.8 S. 0.3 E. MIDDLETON (Lat: 43.693806,  Lng: -116.612972),  Route carried "on" structure: County highway 3750,  Year Built: 2004,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 10,500 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 15,750 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: FIFTEEN MILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.040,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23841,  Location: 3.9 S. 0.5 W. FAIRFIELD (Lat: 43.285611,  Lng: -114.801972),  Route carried "on" structure: County highway ,  Year Built: 2016,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 30 (year 2019),  Truck Traffic: 33%,  Average Future Daily Traffic: 45 (year 2039),  Design Load: HS 20,  Features Intersected: CAMAS CREEK,  Facility Carried by Structure: MORMON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.595,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.3m (30.5ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Very good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23846,  Location: 3.8 S. 0.5 W. FAIRFIELD (Lat: 43.287639,  Lng: -114.801972),  Route carried "on" structure: County highway ,  Year Built: 2016,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 30 (year 2019),  Truck Traffic: 33%,  Average Future Daily Traffic: 45 (year 2039),  Design Load: HS 20,  Features Intersected: CAMAS CREEK,  Facility Carried by Structure: MORMON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.816,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 23855,  Location: 2.2 S. FAIRFIELD (Lat: 43.310500,  Lng: -114.791944),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 100 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 150 (year 2039),  Design Load: H 10,  Features Intersected: W.FK.SOLDIER CREEK,  Facility Carried by Structure: MORMON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 162.265,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 5.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $267,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $401,000 ( Estimate for 2019),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 2674,  Location: 1.3 N. 3.5 E. MARSING (Lat: 43.567667,  Lng: -116.742917),  Route carried "on" structure: County highway ,  Year Built: 1967,  Status: Posted for load,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 90 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 135 (year 2039),  Design Load: HS 20,  Features Intersected: HIGH LINE CANAL,  Facility Carried by Structure: WALKER LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 163.422,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $296,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $444,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2676,  Location: 1.6 S. 1.7 E. PARMA (Lat: 43.763944,  Lng: -116.912222),  Route carried "on" structure: County highway ,  Year Built: 1963,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 100 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 150 (year 2039),  Design Load: HS 20,  Features Intersected: SAND HOLLOW CR,  Facility Carried by Structure: SAND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 165.268,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2677,  Location: 0.8 N. 1.4 W. PARMA (Lat: 43.799694,  Lng: -116.975333),  Route carried "on" structure: County highway ,  Year Built: 1975,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 40 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 60 (year 2039),  Design Load: HS 20,  Features Intersected: SAND RUN GULCH,  Facility Carried by Structure: SHARP LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 162.328,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $203,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $305,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Fairfield, Idaho (ID) on our hugely popular Idaho forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.