Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Fall River, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 60Number of bridges
  • 513m1,683ftTotal length
  • $417,182,000Total costs
  • 1,456,320Total average daily traffic
  • 112,195Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Fall River
  • No street view available for this location

New bridges - Historical Statistics

  • 3Before 1900
  • 51900-1909
  • 11910-1919
  • 21930-1939
  • 91950-1959
  • 321960-1969
  • 51970-1979
  • 32010-2015

Reconstructed bridges - Historical Statistics

  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 21970-1979
  • 41980-1989
  • 21990-1999
  • 22000-2009
  • 12010-2015

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>   Show street view

Structure Number: B140020C7DOTNBI,  Location: 3.5 MI W OF RUSSELL TL (Lat: 42.178014,  Lng: -72.945597),  Route carried "on" structure: State highway 23,  Year Built: 1931,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,400 (year 2013),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,211 (year 2032),  Features Intersected: WATER BEDLAM BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.868,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 37.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 15,  Bridge Improvement Cost: $197,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $296,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: B140030C8DOTNBI,  Location: 3.9 MI W OF RUSSELL TL (Lat: 42.175272,  Lng: -72.950833),  Route carried "on" structure: State highway 23,  Year Built: 1930,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 1,400 (year 2003),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,211 (year 2032),  Features Intersected: WATER PEEBLE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.208,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 35.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.60m (8.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 15,  Bridge Improvement Cost: $557,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $836,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: F020033JDMUNNBI,  Location: BTWN I195 & QUARRY ST (Lat: 41.688589,  Lng: -71.139631),  Route carried "on" structure: City street ,  Year Built: 1895,  Year Reconstructed: 1940,  Status: Open,  Structure Length: 5.36m (17.59ft),  Average Daily Traffic: 29,900 (year 2014),  Truck Traffic: 5%,  Average Future Daily Traffic: 47,221 (year 2033),  Features Intersected: WATER QUEQUECHAN RIVER,  Facility Carried by Structure: HWY QUEQUECHAN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.435,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 60.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 38.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.40m (17.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 14,  Bridge Improvement Cost: $1,717,000,  Roadway Improvement Cost: $172,000,  Total Project Cost: $2,576,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: F020079FCMUNNBI,  Location: INTERSECTION BAY & CLUB S (Lat: 41.696967,  Lng: -71.176047),  Route carried "on" structure: City street ,  Year Built: 1912,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 1,200 (year 2013),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,895 (year 2032),  Features Intersected: RR (ABANDONED),  Facility Carried by Structure: HWY CLUB ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 15,  Bridge Improvement Cost: $871,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $1,307,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: F0200840BDOT634,  Location: .1 MI N OF WILLIAM ST (Lat: 41.699203,  Lng: -71.170431),  Route carried "on" structure: City street ,  Year Built: 1897,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 1.50m (4.92ft),  Average Daily Traffic: 7,400 (year 2014),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,687 (year 2033),  Design Load: HS 20,  Features Intersected: RR (ABANDONED),  Facility Carried by Structure: HWY ALMOND ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.0m (26.2ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.2m (43.3ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: Febuary 14,  Critical Feature Inspection Date: Febuary 14,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $751,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F0200940CDOT634,  Location: AT ST 138 (Lat: 41.700361,  Lng: -71.165825),  Route carried "on" structure: City street ,  Year Built: 1952,  Status: Open,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 1,600 (year 2011),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,527 (year 2032),  Design Load: H 20,  Features Intersected: COMB ST 138/RR(ABANDON),  Facility Carried by Structure: HWY EAGLE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.8m (101.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 13,  Bridge Improvement Cost: $1,426,000,  Roadway Improvement Cost: $143,000,  Total Project Cost: $2,140,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F02013407DOT634,  Location: AT ERNSHAWS DINER (Lat: 41.702222,  Lng: -71.161458),  Route carried "on" structure: City street ,  Year Built: 1904,  Year Reconstructed: 1977,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 7,100 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 7,896 (year 2032),  Design Load: HS 20,  Features Intersected: RR MACRR,  Facility Carried by Structure: HWY ANAWAN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 60.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 15,  Bridge Improvement Cost: $445,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $668,000 ( Estimate for 2015),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F0201640DDOT634,  Location: MM QNF 11 (Lat: 41.703906,  Lng: -71.159525),  Route carried "on" structure: City street ,  Year Built: 1904,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 8,000 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 12,634 (year 2032),  Features Intersected: RR MACRR,  Facility Carried by Structure: HWY CENTRAL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 16.3m (53.5ft)

Condition: Superstructure: Good,  Substructure: Good,  Operating Rating: 51.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 51.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 15,  Bridge Improvement Cost: $170,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $256,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: F02018408DOT634,  Location: .2 W OF N.MAIN ST (Lat: 41.721339,  Lng: -71.148553),  Route carried "on" structure: City street ,  Year Built: 1900,  Year Reconstructed: 1981,  Status: Posted for load,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 13,000 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 20,215 (year 2032),  Features Intersected: RR MACRR,  Facility Carried by Structure: HWY BRIGHTMAN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 28.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 15,  Bridge Improvement Cost: $353,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $530,000 ( Estimate for 2015),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: F02019409DOT634,  Location: JUST W OF N MAIN ST (Lat: 41.727422,  Lng: -71.140347),  Route carried "on" structure: City street ,  Year Built: 1850,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 2,200 (year 2014),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,474 (year 2033),  Design Load: H 20,  Features Intersected: RR MACRR,  Facility Carried by Structure: HWY WEAVER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 2.5m (8.2ft),  Right: 2.5m (8.2ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Underclear: High priority of replacement,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.60m (8.53ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 15,  Critical Feature Inspection Date: January 14,  Other Special Inspection Date: January 15,  Bridge Improvement Cost: $1,570,000,  Roadway Improvement Cost: $158,000,  Total Project Cost: $2,356,000 ( Estimate for 2015),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: F0202340EDOT634,  Location: .1 MI W OF N. MAIN ST (Lat: 41.742189,  Lng: -71.129653),  Route carried "on" structure: City street ,  Year Built: 1903,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 1.12m (3.67ft),  Average Daily Traffic: 600 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 948 (year 2032),  Design Load: HS 20,  Features Intersected: RR MACRR,  Facility Carried by Structure: HWY CLARK ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.3m (40.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Operating Rating: 88.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of replacement,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 15,  Bridge Improvement Cost: $948,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $1,423,000 ( Estimate for 2015),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F020403XDDOTNBI,  Location: AT EXIT 8 (Lat: 41.754094,  Lng: -71.118194),  Route carried "on" structure: Other road ,  Year Built: 1951,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 17,000 (year 2013),  Truck Traffic: 12%,  Average Future Daily Traffic: 26,848 (year 2032),  Design Load: H 20,  Features Intersected: ST 24,  Facility Carried by Structure: HWY AIRPORT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Serious,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 30.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 6 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: Febuary 15,  Other Special Inspection Date: Febuary 15,  Bridge Improvement Cost: $1,301,000,  Roadway Improvement Cost: $131,000,  Total Project Cost: $1,952,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F0204141ADOTNBI,  Location: NEAR ST 79/ST 24 SB (Lat: 41.742189,  Lng: -71.129653),  Route carried "on" structure: City street ,  Year Built: 1954,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 4.79m (15.72ft),  Average Daily Traffic: 17,000 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 26,848 (year 2032),  Design Load: HS 20,  Features Intersected: ST 24 SB,  Facility Carried by Structure: HWY HGHLND AV NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.701,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 46.9m (153.9ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 71.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: May 13,  Critical Feature Inspection Date: May 13,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F020423X5DOTNBI,  Location: .5 FROM HIGHLAND AVE (Lat: 41.739194,  Lng: -71.119528),  Route carried "on" structure: Other road ,  Year Built: 1955,  Status: Open,  Structure Length: 7.10m (23.29ft),  Average Daily Traffic: 6,500 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 10,265 (year 2031),  Design Load: H 20,  Features Intersected: ST 24,  Facility Carried by Structure: HWY WILSON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 48.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.20m (26.90ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 14,  Other Special Inspection Date: March 15,  Bridge Improvement Cost: $4,581,000,  Roadway Improvement Cost: $459,000,  Total Project Cost: $6,872,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: F0204341BDOTNBI,  Location: 2.4 M NO. OF I 195 (Lat: 41.713247,  Lng: -71.118181),  Route carried "on" structure: Other road ,  Year Built: 1955,  Status: Open,  Structure Length: 4.05m (13.29ft),  Average Daily Traffic: 14,000 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 22,110 (year 2032),  Design Load: H 20,  Features Intersected: ST 24,  Facility Carried by Structure: HWY PRESIDENT AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 23 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 27.1m (88.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 34.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.10m (13.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 15,  Bridge Improvement Cost: $2,675,000,  Roadway Improvement Cost: $268,000,  Total Project Cost: $4,013,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: F020443XEDOTNBI,  Location: AT ST 24 (Lat: 41.709964,  Lng: -71.118653),  Route carried "on" structure: City street ,  Year Built: 1955,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 3,900 (year 2011),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,159 (year 2032),  Design Load: H 20,  Features Intersected: ST 24,  Facility Carried by Structure: HWY MERIDIAN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.4m (50.5ft)

Condition: Deck: Serious,  Superstructure: Good,  Substructure: Good,  Operating Rating: 31.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 14.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 6 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: March 15,  Other Special Inspection Date: March 15,  Bridge Improvement Cost: $2,299,000,  Roadway Improvement Cost: $230,000,  Total Project Cost: $3,449,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: F020453MEDOTNBI,  Location: 1.0 MI N OF I 195 (Lat: 41.695986,  Lng: -71.122847),  Route carried "on" structure: State highway 24,  Year Built: 1955,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 42,000 (year 2013),  Truck Traffic: 11%,  Average Future Daily Traffic: 66,331 (year 2032),  Design Load: HS 20,  Features Intersected: HWY BEDFORD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.115,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 22.6m (74.1ft),  Out-to-Out Width: 27.2m (89.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 77.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 13,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F020503VDDOTNBI,  Location: ST 79 AT ST 24 (Lat: 41.746117,  Lng: -71.121975),  Route carried "on" structure: State highway 79,  Year Built: 1962,  Status: Open,  Structure Length: 5.15m (16.90ft),  Average Daily Traffic: 21,000 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 33,165 (year 2032),  Design Load: H 20,  Features Intersected: ST 24 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.115,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 50.6m (166.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 61.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.20m (17.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 13,  Bridge Improvement Cost: $1,715,000,  Roadway Improvement Cost: $172,000,  Total Project Cost: $2,573,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F020513VCDOTNBI,  Location: .6 MI S OF ST 24 (Lat: 41.740217,  Lng: -71.125475),  Route carried "on" structure: State highway 79,  Year Built: 1962,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 22,200 (year 2012),  Truck Traffic: 10%,  Average Future Daily Traffic: 47,379 (year 2032),  Design Load: H 20,  Features Intersected: HWY WILSON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 27.5m (90.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 13,  Bridge Improvement Cost: $1,258,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $1,888,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F020523XFDOTNBI,  Location: 1.4 MI S OF ST 24 (Lat: 41.731969,  Lng: -71.134978),  Route carried "on" structure: Other road ,  Year Built: 1958,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 4,800 (year 2014),  Truck Traffic: 4%,  Average Future Daily Traffic: 7,581 (year 2031),  Design Load: H 20,  Features Intersected: ST 79,  Facility Carried by Structure: HWY HERMAN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Poor,  Operating Rating: 60.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 14,  Other Special Inspection Date: March 15,  Bridge Improvement Cost: $1,244,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,867,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: F020533VBDOTNBI,  Location: 1.7 MI S OF ST 24 (Lat: 41.729172,  Lng: -71.138206),  Route carried "on" structure: State highway 79,  Year Built: 1958,  Status: Temporarily open,  Structure Length: 7.62m (25.00ft),  Average Daily Traffic: 19,000 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 25,901 (year 2033),  Design Load: H 20,  Features Intersected: ST 79,  Facility Carried by Structure: HWY N MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.70m (25.26ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 14,  Bridge Improvement Cost: $3,225,000,  Roadway Improvement Cost: $323,000,  Total Project Cost: $4,838,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F020543V9DOTNBI,  Location: MP QNF 9.34 (Lat: 41.729047,  Lng: -71.138953),  Route carried "on" structure: State highway 79,  Year Built: 1974,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 22,200 (year 2012),  Truck Traffic: 7%,  Average Future Daily Traffic: 63,330 (year 2033),  Design Load: HS 20,  Features Intersected: RR MACRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.701,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.1m (79.1ft),  Skew: 32 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 24.0m (78.7ft),  Out-to-Out Width: 29.4m (96.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 14,  Bridge Improvement Cost: $541,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $812,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F020553VADOTNBI,  Location: MP QNF 9.42 (Lat: 41.729100,  Lng: -71.138967),  Route carried "on" structure: State highway 79,  Year Built: 1974,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 6,700 (year 2014),  Truck Traffic: 7%,  Average Future Daily Traffic: 10,581 (year 2033),  Design Load: HS 20,  Features Intersected: RR MACRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.701,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 14,  Bridge Improvement Cost: $63,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $95,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F020563T9DOTNBI,  Location: AT I 195 (Lat: 41.702219,  Lng: -71.157289),  Route carried "on" structure: City street ,  Year Built: 1961,  Status: Open,  Structure Length: 17.25m (56.59ft),  Average Daily Traffic: 15,000 (year 2014),  Truck Traffic: 6%,  Average Future Daily Traffic: 23,690 (year 2031),  Design Load: H 20,  Features Intersected: COMB I 195 & RAMPS,  Facility Carried by Structure: HWY MILLIKEN BLV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.467,  Lanes on structure: 2,  Lanes under structure: 10,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 34.4m (112.9ft),  Curb or Sidewalk Widths: Left: 2.2m (7.2ft),  Right: 2.2m (7.2ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.30m (56.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 14,  Bridge Improvement Cost: $7,912,000,  Roadway Improvement Cost: $792,000,  Total Project Cost: $11,869,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: F020583TKDOTNBI,  Location: FALL RIVER/SOMERSET LINE (Lat: 41.703597,  Lng: -71.160250),  Route carried "on" structure: Interstate 195,  Year Built: 1965,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 176.17m (577.99ft),  Average Daily Traffic: 81,600 (year 2011),  Truck Traffic: 10%,  Average Future Daily Traffic: 128,871 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: COMB ST79 & TAUNTON RIV
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 17.702,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 31.1m (102.0ft),  Skew: 31 degrees,  Navigation Control: Yes ( Vertical Clearance: 41.1m (134.8ft), Horizontal Clearance: 121.9m (399.9ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 23,  Length of Maximum Span: 256.0m (839.9ft),  Curb-To-Curb Width: 28.0m (91.9ft),  Out-to-Out Width: 30.9m (101.4ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 17.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 5.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 176.20m (578.08ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 13,  Critical Feature Inspection Date: September 13,  Underwater Inspection Date: October 14,  Other Special Inspection Date: September 14,  Bridge Improvement Cost: $183,256,000,  Roadway Improvement Cost: $18,326,000,  Total Project Cost: $274,885,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F020593TBDOTNBI,  Location: AT E END OF BRAGA BR (Lat: 41.702242,  Lng: -71.158056),  Route carried "on" structure: Ramp Interstate 195,  Year Built: 1965,  Status: Temporarily open,  Structure Length: 33.60m (110.24ft),  Average Daily Traffic: 18,700 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 29,533 (year 2032),  Design Load: HS 20,  Features Intersected: COMB I 195 & CITY STS,  Facility Carried by Structure: HWY RAMP C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 15,  Length of Maximum Span: 28.0m (91.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 48.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 33.70m (110.56ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 13,  Other Special Inspection Date: June 14,  Bridge Improvement Cost: $10,602,000,  Roadway Improvement Cost: $1,061,000,  Total Project Cost: $15,904,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: F020593TDDOTNBI,  Location: AT E END OF BRAGA BR (Lat: 41.701633,  Lng: -71.158381),  Route carried "on" structure: Ramp Interstate 195,  Year Built: 1965,  Status: Open,  Structure Length: 1.20m (3.94ft),  Average Daily Traffic: 20,280 (year 2013),  Truck Traffic: 2%,  Average Future Daily Traffic: 32,028 (year 2032),  Design Load: HS 20,  Features Intersected: HWY POCASSET ST,  Facility Carried by Structure: HWY RAMP E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.1m (26.6ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.0m (39.4ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 13,  Other Special Inspection Date: May 14,  Bridge Improvement Cost: $313,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $470,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: F020593TGDOTNBI,  Location: CENTRAL ST TO 195 W.B. (Lat: 41.702808,  Lng: -71.157789),  Route carried "on" structure: Ramp Interstate 195,  Year Built: 1965,  Status: Open,  Structure Length: 4.16m (13.65ft),  Average Daily Traffic: 7,500 (year 2011),  Truck Traffic: 6%,  Average Future Daily Traffic: 11,845 (year 2032),  Design Load: H 20,  Features Intersected: HWY RMP F & G APPRCH,  Facility Carried by Structure: HWY RAMP L
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 56.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: May 13,  Critical Feature Inspection Date: May 13,  Bridge Improvement Cost: $1,011,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,517,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: F020633V5DOTNBI,  Location: AT I 195 (Lat: 41.701350,  Lng: -71.155300),  Route carried "on" structure: City street ,  Year Built: 1964,  Status: Open,  Structure Length: 4.12m (13.52ft),  Average Daily Traffic: 20,200 (year 2014),  Truck Traffic: 8%,  Average Future Daily Traffic: 28,743 (year 2031),  Design Load: HS 20,  Features Intersected: I 195,  Facility Carried by Structure: HWY S MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 4,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 33 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 55.8m (183.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 51.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 14,  Bridge Improvement Cost: $5,642,000,  Roadway Improvement Cost: $565,000,  Total Project Cost: $8,464,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F020643XHDOTNBI,  Location: AT CITY HALL (Lat: 41.700531,  Lng: -71.154089),  Route carried "on" structure: City street ,  Year Built: 1964,  Status: Open,  Structure Length: 4.13m (13.55ft),  Average Daily Traffic: 11,100 (year 2012),  Truck Traffic: 7%,  Average Future Daily Traffic: 17,530 (year 2031),  Design Load: HS 20,  Features Intersected: I 195,  Facility Carried by Structure: HWY THIRD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 7.3m (24.0ft),  Right: 6.2m (20.3ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 51.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 14,  Bridge Improvement Cost: $2,467,000,  Roadway Improvement Cost: $247,000,  Total Project Cost: $3,701,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F020653XJDOTNBI,  Location: AT JCT PLEASANT STREET (Lat: 41.699822,  Lng: -71.153336),  Route carried "on" structure: City street ,  Year Built: 1964,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 28,000 (year 2014),  Truck Traffic: 7%,  Average Future Daily Traffic: 25,269 (year 2031),  Design Load: HS 20,  Features Intersected: I 195,  Facility Carried by Structure: HWY FOURTH ST
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.160,  Lanes on structure: 4,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 32.9m (107.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 50.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.50m (14.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 14,  Bridge Improvement Cost: $3,564,000,  Roadway Improvement Cost: $357,000,  Total Project Cost: $5,347,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F020663TQDOTNBI,  Location: 1.2 MI E OF SOMERSETTL (Lat: 41.696678,  Lng: -71.149944),  Route carried "on" structure: Interstate 195,  Year Built: 1964,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 85,000 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 134,240 (year 2032),  Design Load: HS 20,  Features Intersected: ST 81 PLYMOUTH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.486,  Lanes on structure: 7,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 37.5m (123.0ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 37.5m (123.0ft),  Out-to-Out Width: 42.7m (140.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 15,  Bridge Improvement Cost: $5,139,000,  Roadway Improvement Cost: $514,000,  Total Project Cost: $7,709,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F020673TPDOTNBI,  Location: RODMAN/LOWELL ST PROPERTY (Lat: 41.686572,  Lng: -71.138511),  Route carried "on" structure: Interstate 195,  Year Built: 1965,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 76,200 (year 2014),  Truck Traffic: 8%,  Average Future Daily Traffic: 116,868 (year 2033),  Design Load: HS 20,  Features Intersected: RR (ABANDONED)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.776,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 38.1m (125.0ft),  Skew: 33 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 38.1m (125.0ft),  Out-to-Out Width: 43.3m (142.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 54.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 14,  Bridge Improvement Cost: $3,127,000,  Roadway Improvement Cost: $313,000,  Total Project Cost: $4,691,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F020683TMDOTNBI,  Location: 1 MI. E. OF ST.24 (Lat: 41.688150,  Lng: -71.140153),  Route carried "on" structure: Interstate 195,  Year Built: 1963,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 76,200 (year 2012),  Truck Traffic: 10%,  Average Future Daily Traffic: 115,289 (year 2032),  Design Load: HS 20,  Features Intersected: HWY QUEQUECHAN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 33.5m (109.9ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 33.5m (109.9ft),  Out-to-Out Width: 37.2m (122.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 13,  Bridge Improvement Cost: $1,075,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $1,613,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F020693TLDOTNBI,  Location: .2 MI W OF ST 24 (Lat: 41.687236,  Lng: -71.138772),  Route carried "on" structure: Interstate 195,  Year Built: 1963,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 81,400 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 128,555 (year 2031),  Design Load: HS 20,  Features Intersected: RR (ABANDONED)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.192,  Lanes on structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 41.1m (134.8ft),  Skew: 35 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 41.1m (134.8ft),  Out-to-Out Width: 46.4m (152.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 14,  Bridge Improvement Cost: $492,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $739,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F020703NWDOTNBI,  Location: AT I 195 (Lat: 41.682286,  Lng: -71.130658),  Route carried "on" structure: US 6,  Year Built: 1965,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 8,700 (year 2013),  Truck Traffic: 11%,  Average Future Daily Traffic: 21,478 (year 2032),  Design Load: H 20,  Features Intersected: I 195
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.976,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 50.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 13,  Bridge Improvement Cost: $1,092,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $1,639,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F020703NXDOTNBI,  Location: AT I 195 (Lat: 41.682239,  Lng: -71.130611),  Route carried "on" structure: US 6,  Year Built: 1965,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 4.24m (13.91ft),  Average Daily Traffic: 15,000 (year 2013),  Truck Traffic: 12%,  Average Future Daily Traffic: 23,690 (year 2032),  Design Load: H 20,  Features Intersected: I 195
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.976,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 50.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.30m (14.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 13,  Bridge Improvement Cost: $1,118,000,  Roadway Improvement Cost: $112,000,  Total Project Cost: $1,678,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F020713MJDOTNBI,  Location: AT WATTUPPA POND (Lat: 41.681078,  Lng: -71.123742),  Route carried "on" structure: State highway 24,  Year Built: 1961,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 16,000 (year 2013),  Truck Traffic: 7%,  Average Future Daily Traffic: 39,482 (year 2031),  Design Load: HS 20,  Features Intersected: I 195 WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.345,  Lanes on structure: 1,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.4m (139.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 71.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.40m (14.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 13,  Bridge Improvement Cost: $943,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $1,415,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Discuss Fall River, Massachusetts (MA) on our hugely popular Massachusetts forum.