![]() |
Bridge Statistics for Farmington, Utah (UT) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Farmington, UT, Utah, Utah forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 26 Total length: 219 meters (719ft) Total costs: $13,820,000 Total average daily traffic: 875,868 Total average daily truck traffic: 172,433 National Bridge Inventory (NBI) Registered Bridges for Farmington
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 11021D, Location: 1000 W. 500 S.,FARMINGTON (Lat: 40.972111, Lng: -111.910611), Route carried "on" structure: City street , Year Built: 1993, Status: Open, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 200 (year 2002), Truck Traffic: 1%, Average Future Daily Traffic: 243 (year 2022), Design Load: HS 20, Features Intersected: FARMINGTON CREEK, Facility Carried by Structure: 500 SOUTH STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.9m (25.9ft), Curb-To-Curb Width: 15.5m (50.9ft), Out-to-Out Width: 16.8m (55.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.50m (4.92ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Bridge Improvement Cost: $164,000, Roadway Improvement Cost: $16,000, Total Project Cost: $270,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: C 448, Location: 200 W.GLOVERS LN.FARMINGT (Lat: 40.965444, Lng: -111.892111), Route carried "on" structure: County highway , Year Built: 1973, Status: Open, Structure Length: 12.31m (40.39ft), Average Daily Traffic: 1,000 (year 2002), Truck Traffic: 1%, Average Future Daily Traffic: 1,215 (year 2022), Design Load: HS 20, Features Intersected: I-15 (SR-15) & UPRR, Facility Carried by Structure: GLOVER'S LANE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 519.059, Lanes on structure: 2, Lanes under structure: 9, Owner: State Highway Agency, Approaching Roadway Width: 17.1m (56.1ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 42.7m (140.1ft), Curb-To-Curb Width: 9.3m (30.5ft), Out-to-Out Width: 10.5m (34.4ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 13.20m (43.31ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $891,000, Roadway Improvement Cost: $89,000, Total Project Cost: $1,470,000 ( Estimate for 2001), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: C 449, Location: WEST STATE ST.FARMINGTON (Lat: 40.980500, Lng: -111.898083), Route carried "on" structure: City street , Year Built: 1973, Status: Open, Structure Length: 12.31m (40.39ft), Average Daily Traffic: 4,800 (year 2002), Truck Traffic: 1%, Average Future Daily Traffic: 5,832 (year 2022), Design Load: HS 20, Features Intersected: I-15 (SR-15) & UPRR, Facility Carried by Structure: STATE STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 520.856, Lanes on structure: 2, Lanes under structure: 9, Owner: State Highway Agency, Approaching Roadway Width: 9.8m (32.2ft), Skew: 1 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 45.7m (149.9ft), Curb-To-Curb Width: 9.3m (30.5ft), Out-to-Out Width: 10.4m (34.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 13.20m (43.31ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $1,094,000, Roadway Improvement Cost: $109,000, Total Project Cost: $1,805,000 ( Estimate for 2001), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: C 893, Location: CHERRY HILLS INTERCHANGE (Lat: 41.012000, Lng: -111.911497), Route carried "on" structure: State highway 273, Year Built: 2000, Status: Open, Structure Length: 8.20m (26.90ft), Average Daily Traffic: 14,605 (year 2002), Truck Traffic: 3%, Average Future Daily Traffic: 17,745 (year 2022), Design Load: HS 20, Features Intersected: US-89 (SR-89) Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.031, Lanes on structure: 6, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 29.0m (95.1ft), Skew: 2 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 38.2m (125.3ft), Curb or Sidewalk Widths: Left: 2.0m (6.6ft), Right: 2.0m (6.6ft), Curb-To-Curb Width: 29.0m (95.1ft), Out-to-Out Width: 34.0m (111.5ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Very good, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 9.20m (30.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $2,018,000, Roadway Improvement Cost: $202,000, Total Project Cost: $3,330,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: E2491, Location: 10 W.600 N.FARMINGTON (Lat: 40.990278, Lng: -111.890556), Route carried "on" structure: State highway 106, Year Built: 2004, Status: Open, Structure Length: 0.82m (2.69ft), Average Daily Traffic: 9,875 (year 2002), Truck Traffic: 3%, Average Future Daily Traffic: 11,998 (year 2022), Design Load: HS 20, Features Intersected: FARMINGTON CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 13.047, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 12.6m (41.3ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.6m (24.9ft), Curb or Sidewalk Widths: Left: 2.1m (6.9ft), Right: 2.1m (6.9ft), Curb-To-Curb Width: 12.6m (41.3ft), Out-to-Out Width: 19.6m (64.3ft) Condition: Channel: Very good, Culverts: Very good, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007 Find on map >>
Structure Number: F 695, Location: AT SHEPHARD LANE INTSEC. (Lat: 41.000333, Lng: -111.907556), Route carried "on" structure: US 89, Year Built: 2004, Status: Open, Structure Length: 4.14m (13.58ft), Average Daily Traffic: 33,495 (year 2002), Truck Traffic: 4%, Average Future Daily Traffic: 40,696 (year 2022), Design Load: HS 25, Features Intersected: SR-106, SHEPHARD LANE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 542.735, Lanes on structure: 6, Lanes under structure: 5, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 33.0m (108.3ft), Skew: 32 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 38.3m (125.7ft), Curb-To-Curb Width: 33.0m (108.3ft), Out-to-Out Width: 37.0m (121.4ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 40.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 40.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $1,713,000, Total Project Cost: $1,713,000 ( Estimate for 2004), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: F 714, Location: WEST OF LAGOON INTCHG. (Lat: 40.988500, Lng: -111.906583), Route carried "on" structure: State highway 225, Year Built: 2004, Status: Open, Structure Length: 4.87m (15.98ft), Average Daily Traffic: 3,001 (year 2002), Truck Traffic: 1%, Average Future Daily Traffic: 3,646 (year 2022), Design Load: HS 25, Features Intersected: UNION PACIFIC RAILROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.475, Lanes on structure: 5, Owner: State Highway Agency, Approaching Roadway Width: 28.3m (92.8ft), Skew: 20 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 45.7m (149.9ft), Curb-To-Curb Width: 28.3m (92.8ft), Out-to-Out Width: 37.1m (121.7ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 40.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 40.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: F 715, Location: Farmington Interchange (Lat: 40.989444, Lng: -111.907500), Route carried "on" structure: State highway 225, Year Built: 2004, Status: Open, Structure Length: 11.21m (36.78ft), Average Daily Traffic: 5,000 (year 2004), Truck Traffic: 5%, Average Future Daily Traffic: 6,075 (year 2024), Design Load: HS 25, Features Intersected: I-15 (SR-15) Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.579, Lanes on structure: 4, Lanes under structure: 15, Owner: State Highway Agency, Approaching Roadway Width: 24.7m (81.0ft), Skew: 20 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 42.3m (138.8ft), Curb-To-Curb Width: 24.7m (81.0ft), Out-to-Out Width: 25.7m (84.3ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 40.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 40.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: F 716, Location: LAGOON INTERCHANGE (Lat: 40.991389, Lng: -111.902556), Route carried "on" structure: State highway 225, Year Built: 2004, Status: Open, Structure Length: 5.05m (16.57ft), Average Daily Traffic: 8,910 (year 2002), Truck Traffic: 4%, Average Future Daily Traffic: 10,826 (year 2022), Design Load: HS 25, Features Intersected: US-89 (SR-89) Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.869, Lanes on structure: 4, Lanes under structure: 8, Owner: State Highway Agency, Approaching Roadway Width: 25.2m (82.7ft), Skew: 20 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 47.5m (155.8ft), Curb-To-Curb Width: 25.2m (82.7ft), Out-to-Out Width: 26.3m (86.3ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 40.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 40.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Better than present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 1F 296, Location: 1.0 MI.SO.of LAGOON INT. (Lat: 40.973111, Lng: -111.892528), Route carried "on" structure: City street , Year Built: 1973, Status: Open, Structure Length: 3.05m (10.01ft), Average Daily Traffic: 2,343 (year 2002), Truck Traffic: 1%, Average Future Daily Traffic: 2,847 (year 2022), Design Load: HS 20, Features Intersected: SR-227 SBL, Facility Carried by Structure: LAGOON DRIVE ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Owner: State Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 28.7m (94.2ft), Curb-To-Curb Width: 8.1m (26.6ft), Out-to-Out Width: 9.6m (31.5ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 3.90m (12.80ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $324,000, Roadway Improvement Cost: $32,000, Total Project Cost: $534,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 1F 692, Location: CHERRY HILLS INTCHG. (Lat: 41.008944, Lng: -111.911333), Route carried "on" structure: Ramp US 89, Year Built: 2004, Status: Open, Structure Length: 9.79m (32.12ft), Average Daily Traffic: 5,000 (year 2004), Truck Traffic: 12%, Average Future Daily Traffic: 6,075 (year 2024), Design Load: HS 25, Features Intersected: NB.FRONTAGE ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 543.600, Lanes on structure: 2, Lanes under structure: 1, Owner: State Highway Agency, Approaching Roadway Width: 12.5m (41.0ft), Skew: 7 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 46.8m (153.5ft), Curb-To-Curb Width: 12.5m (41.0ft), Out-to-Out Width: 16.6m (54.5ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 40.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 40.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $1,593,000, Total Project Cost: $1,593,000 ( Estimate for 2004), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 3C 521, Location: 0.5 Mi. N. of Glover Lane (Lat: 40.970806, Lng: -111.892331), Route carried "on" structure: Ramp State highway 227, Year Built: 1973, Status: Open, Structure Length: 11.80m (38.71ft), Average Daily Traffic: 2,638 (year 2002), Truck Traffic: 5%, Average Future Daily Traffic: 3,205 (year 2022), Design Load: HS 20, Features Intersected: I-15 (SR-15) NBL & SBL Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.483, Lanes on structure: 2, Lanes under structure: 8, Owner: State Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Skew: 5 degrees, Material/Design: Steel continuous, Design/Construction: Frame, Number Of Spans In Main Unit: 4, Length of Maximum Span: 39.6m (129.9ft), Curb-To-Curb Width: 8.1m (26.6ft), Out-to-Out Width: 9.2m (30.2ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 12.70m (41.67ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $1,054,000, Roadway Improvement Cost: $105,000, Total Project Cost: $1,739,000 ( Estimate for 2001), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 3C 869, Location: LAGOON INTERCHANGE (Lat: 40.987889, Lng: -111.902028), Route carried "on" structure: US 89, Year Built: 2004, Status: Open, Structure Length: 17.24m (56.56ft), Average Daily Traffic: 21,820 (year 2002), Truck Traffic: 6%, Average Future Daily Traffic: 26,511 (year 2022), Design Load: HS 25, Features Intersected: I-15 (SR-15) Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 541.992, Lanes on structure: 3, Lanes under structure: 10, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.4m (50.5ft), Skew: 5 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 67.3m (220.8ft), Curb-To-Curb Width: 15.6m (51.2ft), Out-to-Out Width: 16.6m (54.5ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 40.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 40.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Better than present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 3F 691, Location: CHERRY HILLS INTCHG. (Lat: 41.009944, Lng: -111.912806), Route carried "on" structure: Ramp US 89, Year Built: 2004, Status: Open, Structure Length: 4.99m (16.37ft), Average Daily Traffic: 3,000 (year 2004), Truck Traffic: 12%, Average Future Daily Traffic: 3,645 (year 2024), Design Load: HS 25, Features Intersected: SB. SHEPHERD LANE RAMP Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 543.882, Lanes on structure: 1, Lanes under structure: 1, Owner: State Highway Agency, Approaching Roadway Width: 8.1m (26.6ft), Skew: 6 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 46.8m (153.5ft), Curb-To-Curb Width: 8.1m (26.6ft), Out-to-Out Width: 10.1m (33.1ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 40.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 40.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $1,366,000, Total Project Cost: $1,366,000 ( Estimate for 2004), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: C 448, Location: 200 W.GLOVERS LN.FARMINGT (Lat: 40.965444, Lng: -111.892111), Route carried "under" structure: Interstate 15, Year Built: 1973, Structure Length: 12.31m (40.39ft), Average Daily Traffic: 130,136 (year 2002), Truck Traffic: 26%, Features Intersected: I-15 (SR-15) & UPRR, Facility Carried by Structure: GLOVER'S LANE Minimum Vertical Clearance: 6.53m (21.42ft), Kilometerpoint: 519.059, Lanes on structure: 2, Lanes under structure: 9, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 42.7m (140.1ft) Find on map >>
Structure Number: C 449, Location: WEST STATE ST.FARMINGTON (Lat: 40.980500, Lng: -111.898083), Route carried "under" structure: Interstate 15, Year Built: 1973, Structure Length: 12.31m (40.39ft), Average Daily Traffic: 120,360 (year 2002), Truck Traffic: 26%, Features Intersected: I-15 (SR-15) & UPRR, Facility Carried by Structure: STATE STREET Minimum Vertical Clearance: 0.70m (2.30ft), Kilometerpoint: 520.856, Lanes on structure: 2, Lanes under structure: 9, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 45.7m (149.9ft) Find on map >>
Structure Number: C 893, Location: CHERRY HILLS INTERCHANGE (Lat: 41.012000, Lng: -111.911497), Route carried "under" structure: US 89, Year Built: 2000, Structure Length: 8.20m (26.90ft), Average Daily Traffic: 33,130 (year 2002), Truck Traffic: 4%, Features Intersected: US-89 (SR-89), Facility Carried by Structure: SR-273 Minimum Vertical Clearance: 6.51m (21.36ft), Kilometerpoint: 544.904, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.2m (125.3ft) Find on map >>
Structure Number: F 583, Location: ADJ. TO STATE ST. STRUCT. (Lat: 40.980417, Lng: -111.898025), Route carried "under" structure: Interstate 15, Year Built: 1993, Structure Length: 12.28m (40.29ft), Average Daily Traffic: 130,136 (year 2002), Truck Traffic: 26%, Features Intersected: I-15 (SR-15) NBL & SBL, Facility Carried by Structure: PEDESTRIAN WALKWAY Minimum Vertical Clearance: 6.53m (21.42ft), Kilometerpoint: 520.842, Lanes under structure: 9, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 45.7m (149.9ft) Find on map >>
Structure Number: F 695, Location: AT SHEPHARD LANE INTSEC. (Lat: 41.000333, Lng: -111.907556), Route carried "under" structure: State highway 106, Year Built: 2004, Structure Length: 4.14m (13.58ft), Average Daily Traffic: 10,000 (year 2002), Truck Traffic: 5%, Features Intersected: SR-106, SHEPHARD LANE, Facility Carried by Structure: US-89 (SR-89) Minimum Vertical Clearance: 0.52m (1.71ft), Kilometerpoint: 15.208, Lanes on structure: 6, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.3m (125.7ft) Find on map >>
Structure Number: F 715, Location: Farmington Interchange (Lat: 40.989444, Lng: -111.907500), Route carried "under" structure: Interstate 15, Year Built: 2004, Structure Length: 11.21m (36.78ft), Average Daily Traffic: 100,001 (year 2004), Truck Traffic: 10%, Features Intersected: I-15 (SR-15), Facility Carried by Structure: SR-225 Park Lane Minimum Vertical Clearance: 7.66m (25.13ft), Kilometerpoint: 522.426, Lanes on structure: 4, Lanes under structure: 14, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 42.3m (138.8ft) Find on map >>
Structure Number: F 716, Location: LAGOON INTERCHANGE (Lat: 40.991389, Lng: -111.902556), Route carried "under" structure: US 89, Year Built: 2004, Structure Length: 5.05m (16.57ft), Average Daily Traffic: 34,215 (year 2002), Truck Traffic: 15%, Features Intersected: US-89 (SR-89), Facility Carried by Structure: SR-225, BURKE LANE Minimum Vertical Clearance: 5.31m (17.42ft), Kilometerpoint: 542.346, Lanes on structure: 4, Lanes under structure: 8, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 47.5m (155.8ft) Find on map >>
Structure Number: 1F 296, Location: 1.0 MI.SO.of LAGOON INT. (Lat: 40.973111, Lng: -111.892528), Route carried "under" structure: State highway 227, Year Built: 1973, Structure Length: 3.05m (10.01ft), Average Daily Traffic: 2,618 (year 2002), Truck Traffic: 5%, Features Intersected: SR-227 SBL, Facility Carried by Structure: LAGOON DRIVE ROAD Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 0.579, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.7m (94.2ft) Find on map >>
Structure Number: 1F 692, Location: CHERRY HILLS INTCHG. (Lat: 41.008944, Lng: -111.911333), Route carried "under" structure: Ramp US 89, Year Built: 2004, Structure Length: 9.79m (32.12ft), Average Daily Traffic: 3,000 (year 2004), Truck Traffic: 10%, Features Intersected: NB.FRONTAGE ROAD Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 46.8m (153.5ft) Find on map >>
Structure Number: 3C 521, Location: 0.5 Mi. N. of Glover Lane (Lat: 40.970806, Lng: -111.892331), Route carried "under" structure: Interstate 15, Year Built: 1973, Structure Length: 11.80m (38.71ft), Average Daily Traffic: 120,360 (year 2002), Truck Traffic: 26%, Features Intersected: I-15 (SR-15) NBL & SBL, Facility Carried by Structure: SR-227,SB.WALKER L Minimum Vertical Clearance: 5.66m (18.57ft), Kilometerpoint: 519.682, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Steel continuous, Design/Construction: Frame, Length of Maximum Span: 39.6m (129.9ft) Find on map >>
Structure Number: 3C 869, Location: LAGOON INTERCHANGE (Lat: 40.987889, Lng: -111.902028), Route carried "under" structure: Interstate 15, Year Built: 2004, Structure Length: 17.24m (56.56ft), Average Daily Traffic: 74,225 (year 2002), Truck Traffic: 26%, Features Intersected: I-15 (SR-15), Facility Carried by Structure: US-89 (SR-89), SBL Minimum Vertical Clearance: 5.19m (17.03ft), Kilometerpoint: 521.426, Lanes on structure: 3, Lanes under structure: 10, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 67.3m (220.8ft) Find on map >>
Structure Number: 3F 691, Location: CHERRY HILLS INTCHG. (Lat: 41.009944, Lng: -111.912806), Route carried "under" structure: Ramp US 89, Year Built: 2004, Structure Length: 4.99m (16.37ft), Average Daily Traffic: 2,000 (year 2002), Truck Traffic: 15%, Features Intersected: SB. SHEPHERD LANE RAMP Minimum Vertical Clearance: 0.60m (1.97ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 46.8m (153.5ft) Discuss this city on our hugely popular Utah forum Back to: Farmington, UT, Utah, All US cities.
|
![]() |