![]() |
Bridge Statistics for Florence, Alabama (AL) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Florence, AL, Alabama, Alabama forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 24 Total length: 122 meters (400ft) Total costs: $131,576,000 Total average daily traffic: 213,752 Total average daily truck traffic: 14,931 National Bridge Inventory (NBI) Registered Bridges for Florence
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Bridge Condition - Culverts Find on map >>
Structure Number: 315, Location: 0.2 M S INT W HELTON DR (Lat: 34.816667, Lng: -87.666667), Route carried "on" structure: City street , Year Built: 1925, Status: Posted for load, Structure Length: 4.08m (13.39ft), Average Daily Traffic: 16,050 (year 2004), Truck Traffic: 10%, Average Future Daily Traffic: 25,000 (year 2022), Features Intersected: L & N RR AND CITY STREET, Facility Carried by Structure: HERMITAGE DRIVE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 10.4m (34.1ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 8.8m (28.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 6.1m (20.0ft) Condition: Deck: Poor, Superstructure: Fair, Substructure: Fair, Operating Rating: 9.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 5.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of replacement, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below), Length Of Structure Improvement: 5.04m (16.54ft), Designated Inspection Frequency: Every 12 months, Inspection Date: April 2006, Bridge Improvement Cost: $400,000, Roadway Improvement Cost: $40,000, Total Project Cost: $600,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1709, Location: JCT SR 20 & US 72 (Lat: 34.783333, Lng: -87.666667), Route carried "on" structure: US 43, Year Built: 1938, Status: Open, Structure Length: 3.66m (12.01ft), Average Daily Traffic: 41,790 (year 2000), Truck Traffic: 5%, Average Future Daily Traffic: 35,811 (year 2027), Design Load: H 20, Features Intersected: AL 20 & TENN RV RELIEF Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 51.190, Lanes on structure: 4, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 17.1m (56.1ft), Skew: 20 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 9.1m (29.9ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 14.6m (47.9ft), Out-to-Out Width: 18.4m (60.4ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Good, Channel: Very good, Operating Rating: 30.8 metric tons, Inventory Rating: 22.7 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.58m (15.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2006, Bridge Improvement Cost: $1,098,000, Roadway Improvement Cost: $110,000, Total Project Cost: $1,647,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 273, Location: APPROX 150 FT N UNION AVE (Lat: 34.800000, Lng: -87.650000), Route carried "on" structure: City street , Year Built: 1942, Status: Open, Structure Length: 0.75m (2.46ft), Average Daily Traffic: 1,050 (year 2004), Truck Traffic: 10%, Average Future Daily Traffic: 2,294 (year 2022), Features Intersected: UN-NAMED CREEK, Facility Carried by Structure: COMMERCE ST Minimum Vertical Clearance: 7.56m (24.80ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 2, Length of Maximum Span: 4.0m (13.1ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.2m (30.2ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Channel: Poor, Operating Rating: 14.5 metric tons, Inventory Rating: 10.9 metric tons, Structural Evaluation: High priority of replacement, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.38m (4.53ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $165,000, Roadway Improvement Cost: $17,000, Total Project Cost: $248,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 309, Location: 0.2 M E INT SWEETWATER AV (Lat: 34.800000, Lng: -87.650000), Route carried "on" structure: City street , Year Built: 1947, Status: Open, Structure Length: 0.84m (2.76ft), Average Daily Traffic: 1,200 (year 2004), Truck Traffic: 2%, Average Future Daily Traffic: 1,552 (year 2022), Features Intersected: SWEETWATER CREEK, Facility Carried by Structure: BRANCH STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.7m (22.0ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 6.0m (19.7ft), Out-to-Out Width: 6.4m (21.0ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 14.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 10.9 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: High priority of replacement, Deck Geometry: High priority of replacement, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 1.49m (4.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $124,000, Roadway Improvement Cost: $12,000, Total Project Cost: $186,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 5004, Location: 0.5 M N INT COX CREEK PKY (Lat: 34.833333, Lng: -87.650000), Route carried "on" structure: City street , Year Built: 1948, Year Reconstructed: 1955, Status: Open, Structure Length: 1.07m (3.51ft), Average Daily Traffic: 2,500 (year 2004), Truck Traffic: 5%, Average Future Daily Traffic: 3,600 (year 2022), Features Intersected: COX CREEK, Facility Carried by Structure: MARS HILL ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 8.2m (26.9ft), Skew: 3 degrees, Material/Design: Concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 5.2m (17.1ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 0.3m (1.0ft), Curb-To-Curb Width: 6.6m (21.7ft), Out-to-Out Width: 6.9m (22.6ft) Condition: Deck: Poor, Superstructure: Poor, Substructure: Fair, Channel: Satisfactory, Operating Rating: 14.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 10.9 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: High priority of replacement, Deck Geometry: High priority of replacement, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 1.73m (5.68ft), Designated Inspection Frequency: Every 12 months, Inspection Date: April 2006, Bridge Improvement Cost: $155,000, Roadway Improvement Cost: $16,000, Total Project Cost: $233,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 519, Location: 2.2 MI N TENN RIVER (Lat: 34.783333, Lng: -87.683333), Route carried "on" structure: State highway 20, Year Built: 1955, Status: Open, Structure Length: 12.50m (41.01ft), Average Daily Traffic: 7,580 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 7,746 (year 2027), Design Load: HS 20, Features Intersected: CYPRESS CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 33.122, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 5, Length of Maximum Span: 24.4m (80.1ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 8.2m (26.9ft), Out-to-Out Width: 10.1m (33.1ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Channel: Satisfactory, Operating Rating: 43.5 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 13.33m (43.73ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 24 months, Inspection Date: April 2007, Underwater Inspection Date: October 2007, Bridge Improvement Cost: $1,751,000, Roadway Improvement Cost: $175,000, Total Project Cost: $2,626,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 7762, Location: 1.5 MI N JCT SR 20 (Lat: 34.800000, Lng: -87.666667), Route carried "on" structure: City street , Year Built: 1962, Status: Open, Structure Length: 9.27m (30.41ft), Average Daily Traffic: 18,000 (year 2004), Truck Traffic: 6%, Average Future Daily Traffic: 25,000 (year 2022), Design Load: HS 20, Features Intersected: CIRCULAR ROAD, Facility Carried by Structure: PINE STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 17.7m (58.1ft), Material/Design: Concrete continuous, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 4, Length of Maximum Span: 19.5m (64.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 14.6m (47.9ft), Out-to-Out Width: 18.3m (60.0ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 43.5 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below), Length Of Structure Improvement: 10.22m (33.53ft), Designated Inspection Frequency: Every 12 months, Inspection Date: April 2006, Bridge Improvement Cost: $2,434,000, Roadway Improvement Cost: $243,000, Total Project Cost: $3,651,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 1149, Location: 0.1 MI E JCT SR 157 (Lat: 34.833333, Lng: -87.683333), Route carried "on" structure: State highway 133, Year Built: 1975, Status: Open, Structure Length: 3.32m (10.89ft), Average Daily Traffic: 15,170 (year 2007), Truck Traffic: 5%, Average Future Daily Traffic: 15,473 (year 2027), Design Load: HS 20, Features Intersected: COX CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 21.868, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 21.9m (71.9ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 7, Length of Maximum Span: 3.7m (12.1ft) Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 43.5 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.19m (13.75ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Bridge Improvement Cost: $1,575,000, Roadway Improvement Cost: $158,000, Total Project Cost: $2,363,000 ( Estimate for 2008) Find on map >>
Structure Number: 11491, Location: 1.5 MI E JCT SR 20 (Lat: 34.816667, Lng: -87.700000), Route carried "on" structure: State highway 133, Year Built: 1975, Status: Open, Structure Length: 12.13m (39.80ft), Average Daily Traffic: 8,230 (year 2007), Truck Traffic: 7%, Average Future Daily Traffic: 8,435 (year 2027), Design Load: HS 20, Features Intersected: CYPRESS CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 23.817, Lanes on structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 22.0m (72.2ft), Skew: 23 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 4, Length of Maximum Span: 30.5m (100.1ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 17.1m (56.1ft), Out-to-Out Width: 18.3m (60.0ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Good, Operating Rating: 44.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 12.98m (42.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Bridge Improvement Cost: $3,091,000, Roadway Improvement Cost: $309,000, Total Project Cost: $4,636,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 11492, Location: 1.3 MI E JCT SR 20 (Lat: 34.816667, Lng: -87.700000), Route carried "on" structure: State highway 133, Year Built: 1975, Status: Open, Structure Length: 6.22m (20.41ft), Average Daily Traffic: 8,230 (year 2007), Truck Traffic: 7%, Average Future Daily Traffic: 8,435 (year 2027), Design Load: HS 20, Features Intersected: CYPRESS CREEK RELIEF Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 24.010, Lanes on structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 21.4m (70.2ft), Skew: 20 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 10.4m (34.1ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 17.1m (56.1ft), Out-to-Out Width: 18.3m (60.0ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Very good, Operating Rating: 63.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 39.0 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.26m (23.82ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Bridge Improvement Cost: $1,729,000, Roadway Improvement Cost: $173,000, Total Project Cost: $2,594,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 11493, Location: 1.1 MI E JCT SR 20 (Lat: 34.816667, Lng: -87.700000), Route carried "on" structure: State highway 133, Year Built: 1975, Status: Open, Structure Length: 8.29m (27.20ft), Average Daily Traffic: 8,230 (year 2007), Truck Traffic: 7%, Average Future Daily Traffic: 8,435 (year 2027), Design Load: HS 20, Features Intersected: CYPRESS CREEK RELIEF Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 24.314, Lanes on structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 21.6m (70.9ft), Skew: 20 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 8, Length of Maximum Span: 10.4m (34.1ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 17.1m (56.1ft), Out-to-Out Width: 18.3m (60.0ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Very good, Operating Rating: 63.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 39.0 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 9.29m (30.48ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Bridge Improvement Cost: $2,212,000, Roadway Improvement Cost: $221,000, Total Project Cost: $3,318,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 11874, Location: 0.1 M S JCT SR 133 (Lat: 34.816667, Lng: -87.683333), Route carried "on" structure: City street , Year Built: 1977, Status: Posted for load, Structure Length: 2.96m (9.71ft), Average Daily Traffic: 2,450 (year 2004), Truck Traffic: 2%, Average Future Daily Traffic: 4,100 (year 2022), Design Load: H 15, Features Intersected: COX CREEK, Facility Carried by Structure: JACKSON ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 9.8m (32.2ft), Material/Design: Concrete continuous, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 7.3m (24.0ft), Curb-To-Curb Width: 8.3m (27.2ft), Out-to-Out Width: 8.8m (28.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Fair, Channel: Satisfactory, Operating Rating: 42.6 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 25.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below), Length Of Structure Improvement: 3.85m (12.63ft), Designated Inspection Frequency: Every 12 months, Inspection Date: April 2006, Bridge Improvement Cost: $442,000, Roadway Improvement Cost: $44,000, Total Project Cost: $663,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 11886, Location: 800 F S INT MARS HILL RD (Lat: 34.850000, Lng: -87.633333), Route carried "on" structure: City street , Year Built: 1977, Status: Open, Structure Length: 1.37m (4.49ft), Average Daily Traffic: 950 (year 2004), Truck Traffic: 6%, Average Future Daily Traffic: 1,600 (year 2022), Features Intersected: WILSON CREEK, Facility Carried by Structure: KNIGHT'S BRIDGE R Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 9.4m (30.8ft), Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 4.3m (14.1ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 11.9m (39.0ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 14.5 metric tons, Inventory Rating: 10.9 metric tons, Structural Evaluation: High priority of replacement, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.52m (4.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $50,000,000, Roadway Improvement Cost: $12,000,000, Total Project Cost: $64,000,000 ( Estimate for 2006) Find on map >>
Structure Number: 12846, Location: 1.5 M N SR 133/MARS HILL (Lat: 34.850000, Lng: -87.633333), Route carried "on" structure: City street , Year Built: 1982, Status: Open, Structure Length: 1.52m (4.99ft), Average Daily Traffic: 2,500 (year 2004), Truck Traffic: 20%, Average Future Daily Traffic: 4,500 (year 2022), Design Load: HS 20, Features Intersected: COX CREEK, Facility Carried by Structure: MARS HILL ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.0m (23.0ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 7.6m (24.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.4m (30.8ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 43.5 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.20m (7.22ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $269,000, Roadway Improvement Cost: $27,000, Total Project Cost: $404,000 ( Estimate for 2008), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 14013, Location: 6// F N INT COX CREEK PKY (Lat: 34.833333, Lng: -87.666667), Route carried "on" structure: City street , Year Built: 1986, Status: Open, Structure Length: 2.19m (7.19ft), Average Daily Traffic: 7,510 (year 2004), Truck Traffic: 40%, Average Future Daily Traffic: 9,308 (year 2022), Design Load: HS 20, Features Intersected: COX CREEK, Facility Carried by Structure: HELTON DRIVE Minimum Vertical Clearance: 7.56m (24.80ft), Kilometerpoint: 0.010, Lanes on structure: 5, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 25.6m (84.0ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 7, Length of Maximum Span: 4.3m (14.1ft), Curb-To-Curb Width: 19.4m (63.6ft), Out-to-Out Width: 36.9m (121.1ft) Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 43.5 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.99m (9.81ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $801,000, Roadway Improvement Cost: $80,000, Total Project Cost: $1,201,000 ( Estimate for 2008) Find on map >>
Structure Number: 14035, Location: .2 MI S AL 157 / 133 (Lat: 34.833333, Lng: -87.683333), Route carried "on" structure: City street , Year Built: 1986, Status: Open, Structure Length: 3.14m (10.30ft), Average Daily Traffic: 16,000 (year 2004), Truck Traffic: 2%, Average Future Daily Traffic: 25,000 (year 2022), Design Load: HS 20, Features Intersected: COX CREEK, Facility Carried by Structure: WOOD AVENUE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 4, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 19.5m (64.0ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 7, Length of Maximum Span: 4.3m (14.1ft) Condition: Channel: Good, Culverts: Very good, Operating Rating: 43.5 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Equal to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 3.98m (13.06ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $1,572,000, Roadway Improvement Cost: $157,000, Total Project Cost: $2,358,000 ( Estimate for 2008) Find on map >>
Structure Number: 1777, Location: 1 MILE EAST OF AL 20 (Lat: 34.800000, Lng: -87.700000), Route carried "on" structure: City street , Year Built: 2003, Status: Open, Structure Length: 10.00m (32.81ft), Average Daily Traffic: 2,500 (year 2004), Truck Traffic: 2%, Average Future Daily Traffic: 4,500 (year 2022), Design Load: HS 20, Features Intersected: CYPRESS CREEK, Facility Carried by Structure: WATERLOO ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 25.0m (82.0ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 0.0m, Curb-To-Curb Width: 11.1m (36.4ft), Out-to-Out Width: 14.6m (47.9ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Very good, Operating Rating: 63.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 38.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 10.92m (35.83ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $2,080,000, Roadway Improvement Cost: $208,000, Total Project Cost: $3,120,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 18686, Location: NORTH OF PATTON ISLAND BR (Lat: 34.800000, Lng: -87.650000), Route carried "on" structure: City street , Year Built: 2003, Status: Open, Structure Length: 10.39m (34.09ft), Average Daily Traffic: 3,000 (year 2004), Truck Traffic: 5%, Average Future Daily Traffic: 4,500 (year 2024), Design Load: HS 20, Features Intersected: AL 133, Facility Carried by Structure: VETERANS DRIVE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.145, Lanes on structure: 4, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 7.1m (23.3ft), Skew: 11 degrees, Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 37.9m (124.3ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.0m, Curb-To-Curb Width: 24.4m (80.1ft), Out-to-Out Width: 27.3m (89.6ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 43.6 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 11.30m (37.07ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Bridge Improvement Cost: $4,016,000, Roadway Improvement Cost: $402,000, Total Project Cost: $6,024,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 19404, Location: JUST WEST OF AL 133 (Lat: 34.800000, Lng: -87.650000), Route carried "on" structure: City street , Year Built: 2004, Status: Open, Structure Length: 1.77m (5.81ft), Average Daily Traffic: 6,178 (year 2002), Truck Traffic: 13%, Average Future Daily Traffic: 16,392 (year 2024), Design Load: HS 20, Features Intersected: SWEET WATER CREEK, Facility Carried by Structure: VETERANS DR. Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.997, Lanes on structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 28.7m (94.2ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 4, Length of Maximum Span: 4.3m (14.1ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.0m, Curb-To-Curb Width: 19.5m (64.0ft), Out-to-Out Width: 58.5m (191.9ft) Condition: Channel: Very good, Culverts: Very good, Operating Rating: 43.6 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.46m (8.07ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Bridge Improvement Cost: $1,688,000, Roadway Improvement Cost: $169,000, Total Project Cost: $2,532,000 ( Estimate for 2008) Find on map >>
Structure Number: 19405, Location: JUST WEST OF AL 133 (Lat: 34.800000, Lng: -87.650000), Route carried "on" structure: City street , Year Built: 2004, Status: Open, Structure Length: 0.67m (2.20ft), Average Daily Traffic: 4,804 (year 2000), Average Future Daily Traffic: 15,493 (year 2024), Design Load: HS 20, Features Intersected: HOLLOW BRANCH, Facility Carried by Structure: HUNTSVILLE ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.335, Lanes on structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 32.3m (106.0ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.3m (10.8ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 21.3m (69.9ft), Out-to-Out Width: 44.5m (146.0ft) Condition: Channel: Very good, Culverts: Good, Operating Rating: 43.6 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.28m (4.20ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Bridge Improvement Cost: $875,000, Roadway Improvement Cost: $88,000, Total Project Cost: $1,313,000 ( Estimate for 2008) Find on map >>
Structure Number: 19406, Location: 500'SOUTH OF HUNTSVILE RD (Lat: 34.800000, Lng: -87.650000), Route carried "on" structure: State highway 133, Year Built: 2004, Status: Open, Structure Length: 3.22m (10.56ft), Average Daily Traffic: 16,350 (year 2007), Truck Traffic: 4%, Average Future Daily Traffic: 16,529 (year 2027), Design Load: HS 20, Features Intersected: SWEET WATER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 12.872, Lanes on structure: 7, Owner: State Highway Agency, Approaching Roadway Width: 36.3m (119.1ft), Skew: 17 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 4, Length of Maximum Span: 16.1m (52.8ft) Condition: Channel: Very good, Culverts: Very good, Operating Rating: 43.6 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Equal to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.09m (13.42ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Bridge Improvement Cost: $18,573,000, Roadway Improvement Cost: $1,857,000, Total Project Cost: $27,859,000 ( Estimate for 2008) Find on map >>
Structure Number: 1709, Location: JCT US 72 AND SR 20 (Lat: 34.783333, Lng: -87.666667), Route carried "under" structure: State highway 20, Year Built: 1938, Structure Length: 3.66m (12.01ft), Average Daily Traffic: 7,130 (year 1998), Truck Traffic: 8%, Features Intersected: US 43 & 72,SR 2,13,17,15, Facility Carried by Structure: US 43 Minimum Vertical Clearance: 4.44m (14.57ft), Kilometerpoint: 35.567, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Concrete, Design/Construction: Tee Beam, Length of Maximum Span: 9.1m (29.9ft) Find on map >>
Structure Number: 7762, Location: UNA CAMPUS (Lat: 34.800000, Lng: -87.666667), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 9.27m (30.41ft), Features Intersected: ????????????????????????, Facility Carried by Structure: PINE STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Tee Beam, Length of Maximum Span: 19.5m (64.0ft) Find on map >>
Structure Number: 18686, Location: 0.52 MI. N. OF CO. LINE (Lat: 34.800000, Lng: -87.650000), Route carried "under" structure: State highway 133, Year Built: 2003, Structure Length: 10.39m (34.09ft), Average Daily Traffic: 16,350 (year 2007), Truck Traffic: 4%, Features Intersected: ALA 133, Facility Carried by Structure: VETERANS DRIVE Minimum Vertical Clearance: 5.48m (17.98ft), Kilometerpoint: 12.517, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Length of Maximum Span: 37.9m (124.3ft) Discuss this city on our hugely popular Alabama forum Back to: Florence, AL, Alabama, All US cities.
|
![]() |