![]() |
Bridge Statistics for Forestport, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Forestport, NY, New York, New York forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 14 Total length: 30 meters (98ft) Total costs: $6,317,000 Total average daily traffic: 12,329 Total average daily truck traffic: 849 National Bridge Inventory (NBI) Registered Bridges for Forestport
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 102021, Location: 1.6 MI NE JCT SH12 & SH28 (Lat: 43.438853, Lng: -75.204050), Route carried "on" structure: State highway 28, Year Built: 1938, Year Reconstructed: 1967, Status: Open, Structure Length: 5.48m (17.98ft), Average Daily Traffic: 3,597 (year 2005), Truck Traffic: 8%, Average Future Daily Traffic: 4,088 (year 2025), Design Load: HS 20, Features Intersected: FORESTPORT RESRVR Minimum Vertical Clearance: 4.49m (14.73ft), Kilometerpoint: 26.586, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 1, Length of Maximum Span: 53.3m (174.9ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 0.7m (2.3ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.6m (31.5ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Very good, Operating Rating: 49.0 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 30.8 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.48m (17.98ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2006, Critical Feature Inspection Date: October 2006, Bridge Improvement Cost: $525,000, Roadway Improvement Cost: $312,000, Total Project Cost: $837,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 102022, Location: 1.8 MI NE JCT SH28 & SH12 (Lat: 43.439775, Lng: -75.202767), Route carried "on" structure: State highway 28, Year Built: 1985, Status: Open, Structure Length: 2.83m (9.28ft), Average Daily Traffic: 3,597 (year 2005), Truck Traffic: 8%, Average Future Daily Traffic: 4,088 (year 2025), Design Load: HS 20, Features Intersected: COUNTY ROAD 72 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 26.759, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 27.4m (89.9ft), Curb-To-Curb Width: 11.8m (38.7ft), Out-to-Out Width: 12.8m (42.0ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 68.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.83m (9.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $783,000, Roadway Improvement Cost: $466,000, Total Project Cost: $1,249,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 220569, Location: 3 MI NE OF FORESTPORT (Lat: 43.455350, Lng: -75.152489), Route carried "on" structure: City street , Year Built: 1940, Year Reconstructed: 1972, Status: Posted for load, Structure Length: 0.97m (3.18ft), Average Daily Traffic: 85 (year 2001), Truck Traffic: 5%, Average Future Daily Traffic: 105 (year 2021), Features Intersected: LITT WOODHULL CRK, Facility Carried by Structure: KINCAID ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 6.0m (19.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.2m (26.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 7.5m (24.6ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Channel: Fair, Operating Rating: 44.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Somewhat better than minimum adequacy, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below), Length Of Structure Improvement: 0.97m (3.18ft), Designated Inspection Frequency: Every 12 months, Inspection Date: August 2007, Bridge Improvement Cost: $214,000, Roadway Improvement Cost: $127,000, Total Project Cost: $341,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 22057, Location: 0.125 MI S OF FORESTPORT (Lat: 43.436589, Lng: -75.180428), Route carried "on" structure: City street , Year Built: 1971, Status: Open, Structure Length: 1.31m (4.30ft), Average Daily Traffic: 115 (year 2001), Truck Traffic: 5%, Average Future Daily Traffic: 143 (year 2021), Design Load: H 20, Features Intersected: LIT WOODHULL CRK, Facility Carried by Structure: MEEKERVILLE ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 5.1m (16.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.1m (39.7ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 6.8m (22.3ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 52.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 30.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.31m (4.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $214,000, Roadway Improvement Cost: $127,000, Total Project Cost: $341,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 220573, Location: 3 MI NE OF FORESTPORT (Lat: 43.463442, Lng: -75.172400), Route carried "on" structure: City street , Year Built: 1970, Status: Open, Structure Length: 1.70m (5.58ft), Average Daily Traffic: 97 (year 1996), Truck Traffic: 5%, Average Future Daily Traffic: 120 (year 2016), Design Load: H 20, Features Intersected: BIG WOODHULL CRK, Facility Carried by Structure: HORTON ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 5.1m (16.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 14.9m (48.9ft), Curb-To-Curb Width: 7.4m (24.3ft), Out-to-Out Width: 7.7m (25.3ft) Condition: Deck: Poor, Superstructure: Satisfactory, Substructure: Fair, Channel: Fair, Operating Rating: 47.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 1.70m (5.58ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $235,000, Roadway Improvement Cost: $139,000, Total Project Cost: $374,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 220574, Location: 5.5 MI N FORESTPORT (Lat: 43.518092, Lng: -75.204714), Route carried "on" structure: City street , Year Built: 1981, Status: Posted for load, Structure Length: 0.76m (2.49ft), Average Daily Traffic: 17 (year 1996), Truck Traffic: 5%, Average Future Daily Traffic: 21 (year 2016), Design Load: H 20, Features Intersected: LONG LAKE OUTLET, Facility Carried by Structure: ROUND LAKE ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Town or Township Highway Agency, Approaching Roadway Width: 3.0m (9.8ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.4m (21.0ft), Curb-To-Curb Width: 3.5m (11.5ft), Out-to-Out Width: 3.6m (11.8ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Channel: Fair, Operating Rating: 47.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 28.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Somewhat better than minimum adequacy, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below), Length Of Structure Improvement: 0.76m (2.49ft), Designated Inspection Frequency: Every 12 months, Inspection Date: April 2007, Bridge Improvement Cost: $60,000, Roadway Improvement Cost: $36,000, Total Project Cost: $96,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 220575, Location: 1.5 MI W FORESTPORT STA. (Lat: 43.440542, Lng: -75.207033), Route carried "on" structure: City street , Year Built: 1901, Status: Posted for load, Structure Length: 2.22m (7.28ft), Average Daily Traffic: 750 (year 1999), Truck Traffic: 5%, Average Future Daily Traffic: 930 (year 2019), Features Intersected: BLACK RIVER, Facility Carried by Structure: RIVER ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Town or Township Highway Agency, Approaching Roadway Width: 4.8m (15.7ft), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 1, Length of Maximum Span: 21.0m (68.9ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.0m, Curb-To-Curb Width: 4.7m (15.4ft), Out-to-Out Width: 4.8m (15.7ft) Condition: Deck: Fair, Superstructure: Poor, Substructure: Fair, Channel: Satisfactory, Operating Rating: 12.7 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 6.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: High priority of corrective action, Deck Geometry: High priority of replacement, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Somewhat better than minimum adequacy, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below), Length Of Structure Improvement: 2.22m (7.28ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: August 2007, Critical Feature Inspection Date: August 2007, Bridge Improvement Cost: $234,000, Roadway Improvement Cost: $139,000, Total Project Cost: $373,000 ( Estimate for 2007), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Wood or Timber Find on map >>
Structure Number: 220576, Location: 1.5 MI W FORESTPORT STA. (Lat: 43.441044, Lng: -75.206950), Route carried "on" structure: City street , Year Built: 1901, Status: Posted for load, Structure Length: 1.82m (5.97ft), Average Daily Traffic: 760 (year 2000), Truck Traffic: 5%, Average Future Daily Traffic: 942 (year 2020), Features Intersected: BLACK RIVER, Facility Carried by Structure: RIVER ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Town or Township Highway Agency, Approaching Roadway Width: 4.5m (14.8ft), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 1, Length of Maximum Span: 17.6m (57.7ft), Curb or Sidewalk Widths: Left: 1.6m (5.2ft), Right: 0.0m, Curb-To-Curb Width: 4.7m (15.4ft), Out-to-Out Width: 4.9m (16.1ft) Condition: Deck: Satisfactory, Superstructure: Serious, Substructure: Poor, Channel: Satisfactory, Operating Rating: 10.9 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 6.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: High priority of corrective action, Deck Geometry: High priority of replacement, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Somewhat better than minimum adequacy, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below), Length Of Structure Improvement: 1.82m (5.97ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: August 2007, Critical Feature Inspection Date: August 2007, Bridge Improvement Cost: $193,000, Roadway Improvement Cost: $115,000, Total Project Cost: $308,000 ( Estimate for 2007), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Wood or Timber Find on map >>
Structure Number: 331066, Location: 1.0 MI SE OF FORESTPORT (Lat: 43.432247, Lng: -75.192808), Route carried "on" structure: County highway , Year Built: 1948, Status: Open, Structure Length: 3.35m (10.99ft), Average Daily Traffic: 1,337 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 1,649 (year 2027), Design Load: H 20, Features Intersected: WOODHULL CREEK, Facility Carried by Structure: WOODHULL ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Skew: 2 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 16.4m (53.8ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 7.5m (24.6ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 42.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 25.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 3.35m (10.99ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: November 2006, Underwater Inspection Date: August 2007, Bridge Improvement Cost: $546,000, Roadway Improvement Cost: $324,000, Total Project Cost: $870,000 ( Estimate for 2007), Deck Structure Type: Open Grating Find on map >>
Structure Number: 331067, Location: 1.8 MI. E. JCT 28<61 (Lat: 43.529003, Lng: -75.127181), Route carried "on" structure: City street , Year Built: 1940, Status: Posted for load, Structure Length: 1.98m (6.50ft), Average Daily Traffic: 198 (year 2002), Truck Traffic: 5%, Average Future Daily Traffic: 246 (year 2022), Design Load: H 20, Features Intersected: BEAR CREEK, Facility Carried by Structure: BEAR CREEK ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 4.5m (14.8ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 18.8m (61.7ft), Curb-To-Curb Width: 6.0m (19.7ft), Out-to-Out Width: 6.0m (19.7ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Channel: Satisfactory, Operating Rating: 27.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 16.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below), Length Of Structure Improvement: 1.98m (6.50ft), Designated Inspection Frequency: Every 12 months, Inspection Date: April 2007, Bridge Improvement Cost: $260,000, Roadway Improvement Cost: $155,000, Total Project Cost: $415,000 ( Estimate for 2007), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 331068, Location: 6.0 MI SE OF FORESTPORT (Lat: 43.410978, Lng: -75.096150), Route carried "on" structure: City street , Year Built: 1954, Status: Open, Structure Length: 2.19m (7.19ft), Average Daily Traffic: 62 (year 1999), Truck Traffic: 5%, Average Future Daily Traffic: 77 (year 2019), Design Load: H 20, Features Intersected: BLACK RIVER, Facility Carried by Structure: BELLINGERTOWN RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 5.1m (16.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 21.3m (69.9ft), Curb-To-Curb Width: 7.4m (24.3ft), Out-to-Out Width: 7.7m (25.3ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 57.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 2.19m (7.19ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $260,000, Roadway Improvement Cost: $155,000, Total Project Cost: $415,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 442622, Location: NE RTE 12 BOONVILLE NY (Lat: 43.443683, Lng: -75.209825), Route carried "on" structure: City street , Year Built: 1932, Status: Posted for load-capacity, Structure Length: 1.34m (4.40ft), Average Daily Traffic: 62 (year 1997), Truck Traffic: 5%, Average Future Daily Traffic: 77 (year 2017), Features Intersected: FORESTPORT FD, Facility Carried by Structure: EDMONDS ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 4.8m (15.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.1m (39.7ft), Curb-To-Curb Width: 6.0m (19.7ft), Out-to-Out Width: 7.0m (23.0ft) Condition: Deck: Poor, Superstructure: Fair, Substructure: Fair, Channel: Very good, Operating Rating: 59.4 metric tons, Inventory Rating: 22.6 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.34m (4.40ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $204,000, Roadway Improvement Cost: $121,000, Total Project Cost: $325,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 442623, Location: IN FORESTPORT (Lat: 43.439481, Lng: -75.210503), Route carried "on" structure: City street , Year Built: 1930, Status: Posted for load-capacity, Structure Length: 1.49m (4.89ft), Average Daily Traffic: 589 (year 2007), Truck Traffic: 5%, Average Future Daily Traffic: 730 (year 2027), Features Intersected: ALDER POND, Facility Carried by Structure: DUTCH HILL ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 13.7m (44.9ft), Curb-To-Curb Width: 8.0m (26.2ft), Out-to-Out Width: 8.8m (28.9ft) Condition: Deck: Serious, Superstructure: Fair, Substructure: Fair, Channel: Good, Operating Rating: 36.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 21.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.49m (4.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $234,000, Roadway Improvement Cost: $139,000, Total Project Cost: $373,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 102022, Location: 1.8 MI NE JCT SH28 & SH12 (Lat: 43.439775, Lng: -75.202767), Route carried "under" structure: County highway , Year Built: 1985, Structure Length: 2.83m (9.28ft), Average Daily Traffic: 1,063 (year 1982), Truck Traffic: 6%, Features Intersected: COUNTY ROAD 72, Facility Carried by Structure: RTE 28 Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.4m (89.9ft) Discuss this city on our hugely popular New York forum Back to: Forestport, NY, New York, All US cities.
|
![]() |