Bridge Statistics for Fort Bragg, North Carolina (NC) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Fort Bragg, NC, North Carolina, North Carolina forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 28
Total length: 63 meters (207ft)
Total costs: $2,590,000
Total average daily traffic: 111,090
Total average daily truck traffic: 12,540
Total future (year 2029) average daily traffic: 256,300
National Bridge Inventory (NBI) Registered Bridges for Fort Bragg

New bridges - Historical Statistics

  • 1950-1959: 9
  • 1960-1969: 1
  • 1970-1979: 12
  • 1980-1989: 2
  • 1990-1999: 2
  • 2000-2009: 2

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 510002,  Location: PU 833 899 (Lat: 35.135333,  Lng: -78.988417),  Route carried "on" structure: State highway 1007,  Year Built: 1976,  Status: Open,  Structure Length: 5.73m (18.80ft),  Average Daily Traffic: 14,260 (year 2007),  Truck Traffic: 12%,  Average Future Daily Traffic: 40,000 (year 2029),  Design Load: HS 20+Mod,  Features Intersected: HONEYCUTT ROAD,  Facility Carried by Structure: ALL AMERICAN EXP.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: Army,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.8m (101.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 69.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.73m (18.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $8,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $13,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 510003,  Location: PU 828 899 (Lat: 35.135556,  Lng: -78.992778),  Route carried "on" structure: State highway 1007,  Year Built: 1976,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 14,260 (year 2007),  Truck Traffic: 12%,  Average Future Daily Traffic: 36,500 (year 2029),  Design Load: Pedestrian,  Features Intersected: REILLY ROAD,  Facility Carried by Structure: ALL AMERICAN EXP.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: Army,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Inventory Rating: 61.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.24m (17.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $3,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $10,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 510231,  Location: PU 840 888 (Lat: 35.125833,  Lng: -78.980556),  Route carried "on" structure: Other road ,  Year Built: 1976,  Status: Open,  Structure Length: 7.25m (23.79ft),  Average Daily Traffic: 4,500 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,200 (year 2029),  Design Load: HS 20+Mod,  Features Intersected: ALL AMERICAN EXPRESSWAY,  Facility Carried by Structure: GRUBER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 5,  Owner: Army,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.4m (126.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 23.3m (76.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 93.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.25m (23.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $24,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $39,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 510232,  Location: 2.6 MI N JCT SR1437 (Lat: 35.132828,  Lng: -78.983819),  Route carried "on" structure: State highway 1007,  Year Built: 1976,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 37,000 (year 2007),  Truck Traffic: 13%,  Average Future Daily Traffic: 74,000 (year 2029),  Design Load: HS 20+Mod,  Features Intersected: BEAVER CREEK,  Facility Carried by Structure: ALL AMERICAN EXP.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: Army,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 41.8 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007
Find on map >>

Structure Number: 510233,  Location: PU 831 899 (Lat: 35.135444,  Lng: -78.988250),  Route carried "on" structure: State highway 1007,  Year Built: 1976,  Status: Open,  Structure Length: 5.73m (18.80ft),  Average Daily Traffic: 14,260 (year 2007),  Truck Traffic: 12%,  Average Future Daily Traffic: 40,000 (year 2029),  Design Load: HS 20+Mod,  Features Intersected: HONEYCUTT ROAD,  Facility Carried by Structure: ALL AMERICAN EXP.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: Army,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 60.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.73m (18.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $7,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $15,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 510234,  Location: PU 828 899 (Lat: 35.135833,  Lng: -78.993333),  Route carried "on" structure: State highway 1007,  Year Built: 1976,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 14,260 (year 2007),  Truck Traffic: 12%,  Average Future Daily Traffic: 36,500 (year 2029),  Design Load: HS 20+Mod,  Features Intersected: REILLY ROAD,  Facility Carried by Structure: ALL AMAERICAN EXP.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: Army,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 61.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.24m (17.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $3,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $13,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: DAPFORBRA03BR01,  Location: PU 811 923 (Lat: 35.490833,  Lng: -79.011389),  Route carried "on" structure: Other road ,  Year Built: 1960,  Status: Open,  Structure Length: 0.68m (2.23ft),  Average Daily Traffic: 1,000 (year 2007),  Average Future Daily Traffic: 1,000 (year 2029),  Features Intersected: TANK CREEK,  Facility Carried by Structure: BUTNER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: Army,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.68m (2.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $5,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: DAPFORBRA0O9702,  Location: PU 743 994 (Lat: 35.177444,  Lng: -79.086000),  Route carried "on" structure: Other road ,  Year Built: 1990,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 100 (year 2007),  Truck Traffic: 30%,  Average Future Daily Traffic: 100 (year 2029),  Features Intersected: LITTLE RIVER,  Facility Carried by Structure: JOHN NEILL/SHAW RO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Army,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Critical Feature Inspection Date: November 2007,  Bridge Improvement Cost: $2,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $18,000 ( Estimate for 2007),  Deck Structure Type: Steel plate
Find on map >>

Structure Number: DAPFORBRA0OBR01,  Location: PU 784 843 (Lat: 35.085694,  Lng: -79.042417),  Route carried "on" structure: Other road ,  Year Built: 1955,  Status: Open,  Structure Length: 0.71m (2.33ft),  Average Daily Traffic: 1,000 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,000 (year 2029),  Features Intersected: BONES CREEK,  Facility Carried by Structure: CHICKEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.71m (2.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Roadway Improvement Cost: $1,000,  Total Project Cost: $1,000 ( Estimate for 2007)
Find on map >>

Structure Number: DAPFORBRA0OBR02,  Location: PU 741 808 (Lat: 35.054722,  Lng: -79.091111),  Route carried "on" structure: Other road ,  Year Built: 1952,  Status: Open,  Structure Length: 1.53m (5.02ft),  Average Daily Traffic: 1,000 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,000 (year 2029),  Features Intersected: LITTLE ROCKFISH CREEK,  Facility Carried by Structure: PLANK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.5m (24.6ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 1.5m (4.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.53m (5.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $9,000 ( Estimate for 2007)
Find on map >>

Structure Number: DAPFORBRA0OBR03,  Location: PU 706 802 (Lat: 35.049722,  Lng: -79.129444),  Route carried "on" structure: Other road ,  Year Built: 1955,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 1,000 (year 2007),  Average Future Daily Traffic: 2,000 (year 2029),  Features Intersected: PUPPY CREEK,  Facility Carried by Structure: PLANK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.2m (23.6ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $2,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $13,000 ( Estimate for 2007)
Find on map >>

Structure Number: DAPFORBRA0OBR04,  Location: PU 594 808 (Lat: 35.058333,  Lng: -79.252222),  Route carried "on" structure: Other road ,  Year Built: 1952,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,000 (year 2007),  Average Future Daily Traffic: 2,000 (year 2029),  Features Intersected: JUNIPER CREEK,  Facility Carried by Structure: PLANK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $31,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $40,000 ( Estimate for 2007)
Find on map >>

Structure Number: DAPFORBRA0OBR05,  Location: PU 560 809 (Lat: 35.059111,  Lng: -79.278694),  Route carried "on" structure: Other road ,  Year Built: 1952,  Status: Open,  Structure Length: 1.45m (4.76ft),  Average Daily Traffic: 1,000 (year 2007),  Average Future Daily Traffic: 2,000 (year 2029),  Features Intersected: ROCKFISH CREEK,  Facility Carried by Structure: PLANK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.45m (4.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $14,000 ( Estimate for 2007)
Find on map >>

Structure Number: DAPFORBRA0OBR07,  Location: PU 632 836 (Lat: 35.081889,  Lng: -79.210139),  Route carried "on" structure: Other road ,  Year Built: 1952,  Status: Open,  Structure Length: 0.65m (2.13ft),  Average Daily Traffic: 1,000 (year 2007),  Average Future Daily Traffic: 2,000 (year 2029),  Features Intersected: NICHOLSON CREEK,  Facility Carried by Structure: CHICKEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Army,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.5m (21.3ft)

Condition: Channel: Satisfactory,  Culverts: Poor,  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.65m (2.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $43,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $60,000 ( Estimate for 2007)
Find on map >>

Structure Number: DAPFORBRA0OBR08,  Location: PU 585 951 (Lat: 35.185833,  Lng: -79.260278),  Route carried "on" structure: Other road ,  Year Built: 1955,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,000 (year 2007),  Average Future Daily Traffic: 2,000 (year 2029),  Features Intersected: SPILLWAY MACARTHUR LAKE,  Facility Carried by Structure: MANCHESTER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $3,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $16,000 ( Estimate for 2007)
Find on map >>

Structure Number: DAPFORBRA0OBR09,  Location: PU 638 951 (Lat: 35.185556,  Lng: -79.200833),  Route carried "on" structure: Other road ,  Year Built: 1955,  Status: Open,  Structure Length: 0.77m (2.53ft),  Average Daily Traffic: 1,000 (year 2007),  Average Future Daily Traffic: 2,000 (year 2029),  Features Intersected: HORSE CREEK,  Facility Carried by Structure: MANCHESTER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Very good,  Culverts: Good,  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.77m (2.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $11,000 ( Estimate for 2007)
Find on map >>

Structure Number: DAPFORBRA0OBR1,  Location: PU 659 948 (Lat: 35.182778,  Lng: -79.177500),  Route carried "on" structure: Other road ,  Year Built: 1955,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 1,000 (year 2007),  Average Future Daily Traffic: 2,000 (year 2029),  Features Intersected: FLAT CREEK,  Facility Carried by Structure: MANCHESTER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.3m (17.4ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.78m (2.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $2,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $13,000 ( Estimate for 2007)
Find on map >>

Structure Number: DAPFORBRAO902,  Location: PU 653 959 (Lat: 35.192444,  Lng: -79.184167),  Route carried "on" structure: Other road ,  Year Built: 1970,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 1,000 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,000 (year 2029),  Features Intersected: JAMES RIVER,  Facility Carried by Structure: MORRISON BRIDGE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $2,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $3,000 ( Estimate for 2007),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: DAPFORBRAO9601,  Location: PU 873 881 (Lat: 35.118778,  Lng: -78.944667),  Route carried "on" structure: Other road ,  Year Built: 1993,  Status: Open,  Structure Length: 1.23m (4.04ft),  Average Daily Traffic: 100 (year 2007),  Truck Traffic: 20%,  Average Future Daily Traffic: 100 (year 2029),  Features Intersected: BONNIE DOONE CREEK,  Facility Carried by Structure: BONNIE DOONE BRIDG
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Army,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Wood or Timber,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.3m (40.4ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 4.4m (14.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 4.5 metric tons,  Inventory Rating: 4.5 metric tons,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.23m (4.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $6,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $17,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: DAPFORMAC0T8511,  Location: PU 383 778 (Lat: 35.033806,  Lng: -79.483028),  Route carried "on" structure: Other road ,  Year Built: 2005,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 50 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 100 (year 2029),  Features Intersected: STREAM TO MOSS GILL LAKE,  Facility Carried by Structure: MSR TO AIRFIELD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 32.4 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,  Total Project Cost: $1,000 ( Estimate for 2007),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy
Find on map >>

Structure Number: DAPFORMAC0T8512,  Location: MAIN ROAD TO US 1 OVER RR (Lat: 35.051306,  Lng: -79.487222),  Route carried "on" structure: Other road ,  Year Built: 1977,  Status: Closed,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 50 (year 2005),  Truck Traffic: 10%,  Average Future Daily Traffic: 100 (year 2029),  Features Intersected: RAILROAD (CSXT),  Facility Carried by Structure: MSR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.7m (25.3ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 6.3m (20.7ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Critical,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.40m (14.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,400,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: DAPFORMAC0T8513,  Location: PU 405 789 (Lat: 35.043167,  Lng: -79.459194),  Route carried "on" structure: Other road ,  Year Built: 1980,  Status: Open,  Structure Length: 2.92m (9.58ft),  Average Daily Traffic: 500 (year 2007),  Truck Traffic: 25%,  Average Future Daily Traffic: 600 (year 2029),  Design Load: HS 20+Mod,  Features Intersected: DROWNING CREEK,  Facility Carried by Structure: MAIN ENTRANCE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.0m (42.7ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.27m (14.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $11,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $22,000 ( Estimate for 2007),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: DAPFORMAC0T8514,  Location: PU 405 789 (Lat: 35.043694,  Lng: -79.458806),  Route carried "on" structure: Other road ,  Year Built: 1980,  Status: Open,  Structure Length: 2.42m (7.94ft),  Average Daily Traffic: 500 (year 2007),  Truck Traffic: 40%,  Average Future Daily Traffic: 600 (year 2029),  Design Load: HS 20,  Features Intersected: DROWNING CREEK,  Facility Carried by Structure: MAIN ENTRANCE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.0m (42.7ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 32.4 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.42m (7.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $14,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $25,000 ( Estimate for 2007),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: DAPFORMAC0T8516,  Location: PU 388 774 (Lat: 35.028889,  Lng: -79.478333),  Route carried "on" structure: Other road ,  Year Built: 1970,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 50 (year 2007),  Average Future Daily Traffic: 100 (year 2029),  Design Load: H 20,  Features Intersected: BIG MUDDY CREEK,  Facility Carried by Structure: 17TH ABN DIV ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Army,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 3.8m (12.5ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 30.0 metric tons,  Inventory Rating: 25.0 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $10,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $21,000 ( Estimate for 2007),  Deck Structure Type: Other
Find on map >>

Structure Number: DAPFORMAC0T8517,  Location: PU 400 773 (Lat: 35.028056,  Lng: -79.465000),  Route carried "on" structure: Other road ,  Year Built: 2005,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 50 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 100 (year 2029),  Features Intersected: LITTLE MUDDY LAKE,  Facility Carried by Structure: MSR TO DROP ZONE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 32.4 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.10m (0.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Roadway Improvement Cost: $1,000,  Total Project Cost: $1,000 ( Estimate for 2007),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy
Find on map >>

Structure Number: DAPFORMAC0T8518,  Location: PU 353 762 (Lat: 35.018806,  Lng: -79.517028),  Route carried "on" structure: Other road ,  Year Built: 1970,  Status: Closed,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 50 (year 2005),  Average Future Daily Traffic: 100 (year 2029),  Features Intersected: BIG MUDDY CREEK,  Facility Carried by Structure: TUCKERS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Army,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Critical,  Channel: Satisfactory,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.81m (2.66ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $120,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: DAPFORMAC0T8519,  Location: PU 356 765 (Lat: 35.021111,  Lng: -79.512556),  Route carried "on" structure: Other road ,  Year Built: 1970,  Status: Posted for load,  Structure Length: 1.11m (3.64ft),  Average Daily Traffic: 50 (year 2007),  Average Future Daily Traffic: 100 (year 2029),  Features Intersected: BIG MUDDY CREEK,  Facility Carried by Structure: UNNAMED ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Army,  Approaching Roadway Width: 3.4m (11.2ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.8m (9.2ft),  Curb-To-Curb Width: 3.5m (11.5ft),  Out-to-Out Width: 3.9m (12.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 3.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 3.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.11m (3.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $150,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: DAPFORMAC0T852,  Location: PU 392 774 (Lat: 35.029722,  Lng: -79.474639),  Route carried "on" structure: Other road ,  Year Built: 1970,  Status: Posted for load,  Structure Length: 1.50m (4.92ft),  Average Daily Traffic: 50 (year 2007),  Truck Traffic: 25%,  Average Future Daily Traffic: 100 (year 2029),  Features Intersected: BIG MUDDY CREEK,  Facility Carried by Structure: UNNAMED ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Army,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Fair,  Operating Rating: 5.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 5.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $440,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber

Discuss this city on our hugely popular North Carolina forum