National Bridge Inventory (NBI) Statistics
Number of bridges: 13
Total length: 178 meters (584ft)
Total costs: $6,337,000
Total average daily traffic: 120,299
Total average daily truck traffic: 17,209
National Bridge Inventory (NBI) Registered Bridges for Fulton

New bridges - Historical Statistics

  • 1930-1939: 1
  • 1940-1949: 0
  • 1950-1959: 3
  • 1960-1969: 8
  • 1970-1979: 0
  • 1980-1989: 0
  • 1990-1999: 1

Reconstructed bridges - Historical Statistics

  • 1960-1969: 1
  • 1970-1979: 0
  • 1980-1989: 3
  • 1990-1999: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Find on map >>

Structure Number: B530003,  Location: 0.1M E JCT CTH H (Lat: 42.808083,  Lng: -89.125722),  Route carried "on" structure: County highway ,  Year Built: 1950,  Status: Posted for load,  Structure Length: 4.90m (16.08ft),  Average Daily Traffic: 1,200 (year 2005),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,500 (year 2025),  Design Load: HS 15,  Features Intersected: YAHARA RIVER,  Facility Carried by Structure: CTH M
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 25.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 5.33m (17.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $569,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $853,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: B530009,  Location: 0.2M N JCT CTH M TO E (Lat: 42.810667,  Lng: -89.127583),  Route carried "on" structure: County highway ,  Year Built: 1952,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 900 (year 2005),  Truck Traffic: 10%,  Average Future Daily Traffic: 750 (year 2025),  Design Load: H 15,  Features Intersected: YAHARA RIVER,  Facility Carried by Structure: CTH H
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: B530016,  Location: 0.1M S JCT CTH F TO N (Lat: 42.803833,  Lng: -89.090167),  Route carried "on" structure: County highway ,  Year Built: 1956,  Status: Open,  Structure Length: 14.90m (48.88ft),  Average Daily Traffic: 1,060 (year 2005),  Average Future Daily Traffic: 1,166 (year 2025),  Design Load: H 15,  Features Intersected: ROCK RIVER,  Facility Carried by Structure: CTH M
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 15.33m (50.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $1,631,000,  Roadway Improvement Cost: $163,000,  Total Project Cost: $2,447,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: B530069,  Location: 0.6M N JCT STH 59 (Lat: 42.844272,  Lng: -89.031461),  Route carried "on" structure: City street ,  Year Built: 1962,  Status: Open,  Structure Length: 11.13m (36.52ft),  Average Daily Traffic: 510 (year 2005),  Average Future Daily Traffic: 220 (year 2026),  Design Load: H 15,  Features Intersected: IH 90,  Facility Carried by Structure: LRD GOEDE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 35.1m (115.2ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 29.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 11.58m (37.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $1,026,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,539,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>

Structure Number: B530071,  Location: 2.1M E JCT USH 51 (Lat: 42.836386,  Lng: -89.028892),  Route carried "on" structure: State highway 59,  Year Built: 1961,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 7.60m (24.93ft),  Average Daily Traffic: 6,900 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,210 (year 2023),  Design Load: HS 20,  Features Intersected: IH 90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.5m (83.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.05m (26.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $998,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $1,498,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: B530088,  Location: 0.4M E JCT STH 59 TO E (Lat: 42.830328,  Lng: -89.026719),  Route carried "on" structure: Interstate 90,  Year Built: 1961,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 21.19m (69.52ft),  Average Daily Traffic: 19,000 (year 2006),  Truck Traffic: 16%,  Average Future Daily Traffic: 44,900 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: LRD ELLENDALE RD--ROCK R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 45.7m (149.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2007,  Underwater Inspection Date: October 2004,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: B530089,  Location: 7.8M W JCT STH 26 TO N (Lat: 42.828558,  Lng: -89.025697),  Route carried "on" structure: Interstate 90,  Year Built: 1961,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 19.73m (64.73ft),  Average Daily Traffic: 19,700 (year 2006),  Truck Traffic: 16%,  Average Future Daily Traffic: 44,900 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: LRD ELLENDALE RD--ROCK R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 45.7m (149.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2007,  Underwater Inspection Date: October 2004,  Other Special Inspection Date: August 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: B530145,  Location: 0.9M N JCT CTH M TO W (Lat: 42.815572,  Lng: -89.072322),  Route carried "on" structure: US 51,  Year Built: 1938,  Year Reconstructed: 1969,  Status: Posted for load,  Structure Length: 20.53m (67.36ft),  Average Daily Traffic: 5,000 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,880 (year 2026),  Design Load: HS 20,  Features Intersected: ROCK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Truss - Deck,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 41.8m (137.1ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2007,  Underwater Inspection Date: September 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: B530146,  Location: 0.6M E JCT IH 90 TO E (Lat: 42.830369,  Lng: -89.021514),  Route carried "on" structure: State highway 59,  Year Built: 1990,  Status: Open,  Structure Length: 14.41m (47.28ft),  Average Daily Traffic: 6,900 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,780 (year 2023),  Design Load: HS 20,  Features Intersected: ROCK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 28.7m (94.2ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 76.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2006,  Underwater Inspection Date: September 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: B530069,  Location: 2.6M E JCT USH 51 TO S (Lat: 42.844272,  Lng: -89.031461),  Route carried "under" structure: Interstate 90,  Year Built: 1962,  Structure Length: 11.13m (36.52ft),  Average Daily Traffic: 27,230 (year 2005),  Truck Traffic: 17%,  Features Intersected: IH 90,  Facility Carried by Structure: LRD GOEDE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>

Structure Number: B530071,  Location: 3.1M E JCT USH 51 TO S (Lat: 42.836386,  Lng: -89.028892),  Route carried "under" structure: Interstate 90,  Year Built: 1961,  Structure Length: 7.60m (24.93ft),  Average Daily Traffic: 31,700 (year 2005),  Truck Traffic: 16%,  Features Intersected: IH 90,  Facility Carried by Structure: STH 59
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.5m (83.7ft)

Find on map >>

Structure Number: B530088,  Location: 0.1M N JCT STH 59 (Lat: 42.830328,  Lng: -89.026719),  Route carried "under" structure: City street ,  Year Built: 1961,  Structure Length: 21.19m (69.52ft),  Average Daily Traffic: 99 (year 2005),  Features Intersected: LRD ELLENDALE RD--ROCK R,  Facility Carried by Structure: IH 90 EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>

Structure Number: B530089,  Location: 0.1M W JCT STH 59 (Lat: 42.828558,  Lng: -89.025697),  Route carried "under" structure: City street ,  Year Built: 1961,  Structure Length: 19.73m (64.73ft),  Average Daily Traffic: 100 (year 2005),  Features Intersected: LRD ELLENDALE RD--ROCK R,  Facility Carried by Structure: IH 90 WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.7m (149.9ft)

Discuss this city on our hugely popular Wisconsin forum

Back to: Fulton, WI, Wisconsin, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.