![]() |
Bridge Statistics for Fultondale, Alabama (AL) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Fultondale, AL, Alabama, Alabama forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 14 Total length: 78 meters (256ft) Total costs: $30,537,000 Total average daily traffic: 326,686 Total average daily truck traffic: 57,275 National Bridge Inventory (NBI) Registered Bridges for Fultondale
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Bridge Condition - Culverts Find on map >>
Structure Number: 923, Location: OLD US 31 & BLACK CREEK (Lat: 33.583333, Lng: -86.816667), Route carried "on" structure: City street , Year Built: 1931, Status: Open, Structure Length: 10.46m (34.32ft), Average Daily Traffic: 1,250 (year 2006), Truck Traffic: 1%, Average Future Daily Traffic: 2,000 (year 2026), Design Load: H 15, Features Intersected: RAILROAD & BLACK CK, Facility Carried by Structure: CITY STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.100, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 10, Length of Maximum Span: 10.7m (35.1ft), Curb-To-Curb Width: 6.0m (19.7ft), Out-to-Out Width: 7.0m (23.0ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Channel: Fair, Operating Rating: 22.7 metric tons, Inventory Rating: 17.1 metric tons, Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Underclear: Equal to present minimum criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 11.37m (37.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $1,034,000, Roadway Improvement Cost: $103,000, Total Project Cost: $1,551,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1351, Location: .75 MILE N. OF FULTONDALE (Lat: 33.616667, Lng: -86.783333), Route carried "on" structure: City street 223, Year Built: 1935, Status: Open, Structure Length: 0.69m (2.26ft), Average Daily Traffic: 1,400 (year 2006), Truck Traffic: 5%, Average Future Daily Traffic: 1,960 (year 2026), Features Intersected: BLACK CREEK TRIBUTARY, Facility Carried by Structure: COUNTY ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 5.5m (18.0ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.9m (22.6ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 7.3m (24.0ft) Condition: Channel: Poor, Culverts: Poor, Operating Rating: 18.0 metric tons, Inventory Rating: 18.0 metric tons, Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of corrective action, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.31m (4.30ft), Designated Inspection Frequency: Every 12 months, Other Special Inspection Frequency: Every 12 months, Inspection Date: August 2006, Other Special Inspection Date: August 2006, Bridge Improvement Cost: $103,000, Roadway Improvement Cost: $10,000, Total Project Cost: $154,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 1101, Location: FULTONDALE (Lat: 33.616667, Lng: -86.800000), Route carried "on" structure: City street , Year Built: 1973, Status: Open, Structure Length: 1.62m (5.31ft), Average Daily Traffic: 1,886 (year 2006), Truck Traffic: 5%, Average Future Daily Traffic: 4,000 (year 2026), Design Load: H 20, Features Intersected: BLACK CREEK, Facility Carried by Structure: STOUTS ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 16.2m (53.1ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.2m (30.2ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 30.8 metric tons, Inventory Rating: 22.7 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.30m (7.55ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $274,000, Roadway Improvement Cost: $27,000, Total Project Cost: $411,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 11596, Location: US 31 & 5 MILE CK (Lat: 33.583333, Lng: -86.800000), Route carried "on" structure: US 31, Year Built: 1976, Status: Open, Structure Length: 6.89m (22.60ft), Average Daily Traffic: 19,900 (year 2007), Truck Traffic: 3%, Average Future Daily Traffic: 20,198 (year 2027), Design Load: HS 20, Features Intersected: 5 MILE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 450.941, Lanes on structure: 5, Owner: State Highway Agency, Approaching Roadway Width: 30.5m (100.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 24.7m (81.0ft), Curb-To-Curb Width: 30.5m (100.1ft), Out-to-Out Width: 30.9m (101.4ft) Condition: Deck: Good, Superstructure: Fair, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 43.5 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.91m (25.95ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $3,185,000, Roadway Improvement Cost: $319,000, Total Project Cost: $4,778,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 12921, Location: .5 MI. NO. WALKERS CHAPEL (Lat: 33.600833, Lng: -86.822778), Route carried "on" structure: Interstate 65, Year Built: 1983, Status: Open, Structure Length: 5.70m (18.70ft), Average Daily Traffic: 31,515 (year 2007), Truck Traffic: 19%, Average Future Daily Traffic: 32,681 (year 2027), Design Load: HS 20, Features Intersected: CSX RR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 430.454, Lanes on structure: 3, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 17.1m (56.1ft), Skew: 3 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 21.3m (69.9ft), Curb-To-Curb Width: 17.1m (56.1ft), Out-to-Out Width: 17.9m (58.7ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 77.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.72m (22.05ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $1,567,000, Roadway Improvement Cost: $157,000, Total Project Cost: $2,351,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 12922, Location: .5 MI. NO. WALKERS CHAPEL (Lat: 33.605000, Lng: -86.815833), Route carried "on" structure: Interstate 65, Year Built: 1983, Status: Open, Structure Length: 5.70m (18.70ft), Average Daily Traffic: 31,515 (year 2007), Truck Traffic: 19%, Average Future Daily Traffic: 32,681 (year 2027), Design Load: HS 20, Features Intersected: CSX RR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 430.454, Lanes on structure: 3, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 17.1m (56.1ft), Skew: 3 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 21.3m (69.9ft), Curb-To-Curb Width: 17.1m (56.1ft), Out-to-Out Width: 17.9m (58.7ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 77.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.72m (22.05ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $1,567,000, Roadway Improvement Cost: $157,000, Total Project Cost: $2,351,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 13176, Location: I65 & WALKER CHAPEL RD (Lat: 33.608333, Lng: -86.822500), Route carried "on" structure: County highway , Year Built: 1984, Status: Open, Structure Length: 11.43m (37.50ft), Average Daily Traffic: 5,500 (year 2000), Truck Traffic: 1%, Average Future Daily Traffic: 7,500 (year 2025), Design Load: HS 20, Features Intersected: I65, Facility Carried by Structure: WALKER CHAPEL RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 6, Lanes under structure: 7, Owner: State Highway Agency, Approaching Roadway Width: 24.4m (80.1ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Number Of Approach Spans: 2, Length of Maximum Span: 31.1m (102.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.7m (5.6ft), Curb-To-Curb Width: 23.4m (76.8ft), Out-to-Out Width: 28.2m (92.5ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 43.5 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 12.30m (40.35ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $4,517,000, Roadway Improvement Cost: $452,000, Total Project Cost: $6,776,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 13177, Location: .3 MI. NO.WALKERS CHAPEL (Lat: 33.604167, Lng: -86.821389), Route carried "on" structure: Interstate 65, Year Built: 1984, Status: Open, Structure Length: 1.46m (4.79ft), Average Daily Traffic: 63,030 (year 2007), Truck Traffic: 19%, Average Future Daily Traffic: 65,362 (year 2027), Design Load: HS 20, Features Intersected: BLACK CK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 430.376, Lanes on structure: 6, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 18.3m (60.0ft), Skew: 4 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.0m (9.8ft) Condition: Channel: Satisfactory, Culverts: Satisfactory, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.12m (6.96ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $5,417,000, Roadway Improvement Cost: $542,000, Total Project Cost: $8,126,000 ( Estimate for 2008), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 13178, Location: I65 & RIDGE BROOK ROAD (Lat: 33.641944, Lng: -86.828333), Route carried "on" structure: County highway , Year Built: 1984, Status: Open, Structure Length: 10.49m (34.42ft), Average Daily Traffic: 700 (year 2002), Truck Traffic: 1%, Average Future Daily Traffic: 800 (year 2022), Design Load: HS 20, Features Intersected: I 65, Facility Carried by Structure: RIDGE BROOK ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Skew: 3 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 31.1m (102.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.5m (4.9ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 11.0m (36.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 43.5 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 11.40m (37.40ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $1,629,000, Roadway Improvement Cost: $163,000, Total Project Cost: $2,444,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 16691, Location: 100' S YARBROUGH RD (Lat: 33.616667, Lng: -86.783333), Route carried "on" structure: County highway 224, Year Built: 1979, Status: Open, Structure Length: 0.79m (2.59ft), Average Daily Traffic: 17,500 (year 2007), Truck Traffic: 22%, Average Future Daily Traffic: 24,500 (year 2027), Design Load: HS 20, Features Intersected: UNNAMED CREEK, Facility Carried by Structure: CARSON ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 9.6m (31.5ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.6m (11.8ft) Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 43.6 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.43m (4.69ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2007, Bridge Improvement Cost: $275,000, Roadway Improvement Cost: $28,000, Total Project Cost: $413,000 ( Estimate for 2008) Find on map >>
Structure Number: 16692, Location: 0.5MI N US HWY 31 (Lat: 33.616667, Lng: -86.783333), Route carried "on" structure: County highway 224, Year Built: 1930, Status: Open, Structure Length: 0.98m (3.22ft), Average Daily Traffic: 17,500 (year 2007), Truck Traffic: 22%, Average Future Daily Traffic: 24,500 (year 2027), Design Load: HS 20, Features Intersected: BLACK CREEK, Facility Carried by Structure: CARSON ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 7.2m (23.6ft), Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 2, Length of Maximum Span: 4.9m (16.1ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.3m (1.0ft), Curb-To-Curb Width: 13.0m (42.7ft), Out-to-Out Width: 14.0m (45.9ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Fair, Channel: Satisfactory, Operating Rating: 43.6 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.65m (5.41ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2007, Bridge Improvement Cost: $300,000, Roadway Improvement Cost: $30,000, Total Project Cost: $450,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 16694, Location: 1.0MI NE PINEHILL RD (Lat: 33.633333, Lng: -86.750000), Route carried "on" structure: County highway , Year Built: 1965, Status: Open, Structure Length: 0.63m (2.07ft), Average Daily Traffic: 6,800 (year 2007), Truck Traffic: 16%, Average Future Daily Traffic: 9,500 (year 2027), Design Load: HS 20, Features Intersected: BLACK CREEK, Facility Carried by Structure: CARSON ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.2m (26.9ft), Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft) Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 43.6 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.23m (4.04ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2007, Bridge Improvement Cost: $488,000, Roadway Improvement Cost: $49,000, Total Project Cost: $732,000 ( Estimate for 2008) Find on map >>
Structure Number: 13176, Location: I 65 & WALKER CHAPEL RD (Lat: 33.608333, Lng: -86.822500), Route carried "under" structure: Interstate 65, Year Built: 1984, Structure Length: 11.43m (37.50ft), Average Daily Traffic: 65,160 (year 2007), Truck Traffic: 18%, Features Intersected: I-65, Facility Carried by Structure: WALKER CHAPEL RD Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 429.804, Lanes on structure: 7, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.1m (102.0ft) Find on map >>
Structure Number: 13178, Location: I65 & RIDGE BROOK ROAD (Lat: 33.641944, Lng: -86.828333), Route carried "under" structure: Interstate 65, Year Built: 1984, Structure Length: 10.49m (34.42ft), Average Daily Traffic: 63,030 (year 2007), Truck Traffic: 19%, Features Intersected: I-65, Facility Carried by Structure: RIDGE BROOK ROAD Minimum Vertical Clearance: 5.24m (17.19ft), Kilometerpoint: 432.059, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.1m (102.0ft) Discuss this city on our hugely popular Alabama forum Back to: Fultondale, AL, Alabama, All US cities.
|
![]() |