National Bridge Inventory (NBI) Statistics
Number of bridges: 13
Total length: 18 meters (59ft)
Total costs: $7,263,000
Total average daily traffic: 16,544
Total average daily truck traffic: 1,206
Total future (year 1998) average daily traffic: 20,326
National Bridge Inventory (NBI) Registered Bridges for Gallatin

New bridges - Historical Statistics

  • 1920-1929: 1
  • 1930-1939: 4
  • 1940-1949: 2
  • 1950-1959: 4
  • 1960-1969: 0
  • 1970-1979: 1
  • 1980-1989: 0
  • 1990-1999: 1

Reconstructed bridges - Historical Statistics

  • 1930-1939: 1
  • 1940-1949: 0
  • 1950-1959: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 226292,  Location: 1.9 MILES EAST OF MT ROSS (Lat: 42.005208,  Lng: -73.679033),  Route carried "on" structure: City street ,  Year Built: 1973,  Status: Open,  Structure Length: 1.82m (5.97ft),  Average Daily Traffic: 485 (year 1997),  Truck Traffic: 8%,  Average Future Daily Traffic: 645 (year 2017),  Features Intersected: UNNAMED STREAM,  Facility Carried by Structure: SILVERNAILS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.7m (18.7ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft)

Condition: Channel: Poor,  Culverts: Good,  Operating Rating: 76.9 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $369,000,  Roadway Improvement Cost: $220,000,  Total Project Cost: $589,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 32224,  Location: 0.7 MI E OF JACKSON CORS (Lat: 42.016022,  Lng: -73.731914),  Route carried "on" structure: City street ,  Year Built: 1928,  Year Reconstructed: 1958,  Status: Open,  Structure Length: 1.12m (3.67ft),  Average Daily Traffic: 29 (year 1997),  Truck Traffic: 8%,  Average Future Daily Traffic: 39 (year 2017),  Features Intersected: FALL KILL,  Facility Carried by Structure: NEAR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $181,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $289,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 322241,  Location: 0.7 MI E OF MT ROSS (Lat: 42.004364,  Lng: -73.702164),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 2.22m (7.28ft),  Average Daily Traffic: 942 (year 1997),  Truck Traffic: 5%,  Average Future Daily Traffic: 942 (year 2017),  Design Load: HS 20,  Features Intersected: HAMM BROOK,  Facility Carried by Structure: COUNTY ROAD 50
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.22m (7.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $389,000,  Roadway Improvement Cost: $232,000,  Total Project Cost: $621,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 322247,  Location: 1.6 MI SW OF GALLATINVILL (Lat: 42.015083,  Lng: -73.688153),  Route carried "on" structure: City street ,  Year Built: 1932,  Status: Open,  Structure Length: 1.64m (5.38ft),  Average Daily Traffic: 433 (year 1997),  Truck Traffic: 5%,  Average Future Daily Traffic: 433 (year 2017),  Features Intersected: ROELIFF JANSEN KL,  Facility Carried by Structure: PINE PLN-SLVRNAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $269,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $429,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 322248,  Location: AT SNYDERVILLE (Lat: 42.084950,  Lng: -73.765253),  Route carried "on" structure: City street ,  Year Built: 1931,  Year Reconstructed: 1941,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 50 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 67 ,  Features Intersected: DOVER KILL,  Facility Carried by Structure: TAGHKANIC ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $133,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $212,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 322249,  Location: 0.5 MI W OF GALLATINVILLE (Lat: 42.030306,  Lng: -73.677922),  Route carried "on" structure: City street ,  Year Built: 1933,  Status: Open,  Structure Length: 1.82m (5.97ft),  Average Daily Traffic: 147 (year 1997),  Truck Traffic: 8%,  Average Future Daily Traffic: 196 (year 2017),  Design Load: H 20,  Features Intersected: ROELIFF JANSEN KL,  Facility Carried by Structure: SLVNLS-GALTNVL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.6m (57.7ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $133,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $212,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 32225,  Location: AT GALLATINVILLE (Lat: 42.033094,  Lng: -73.669964),  Route carried "on" structure: City street ,  Year Built: 1948,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 183 (year 1997),  Truck Traffic: 8%,  Average Future Daily Traffic: 243 (year 2017),  Features Intersected: ROELIFF JANSEN KL,  Facility Carried by Structure: MILL HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 42.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $297,000,  Roadway Improvement Cost: $177,000,  Total Project Cost: $474,000 ( Estimate for 2007),  Deck Structure Type: Open Grating
Find on map >>

Structure Number: 334232,  Location: 0.6 MI E OF JACKSON CORS (Lat: 42.015497,  Lng: -73.732528),  Route carried "on" structure: County highway ,  Year Built: 1936,  Status: Open,  Structure Length: 1.15m (3.77ft),  Average Daily Traffic: 1,082 (year 1997),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,082 (year 2017),  Features Intersected: FALL KILL,  Facility Carried by Structure: COUNTY ROAD 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $444,000,  Roadway Improvement Cost: $264,000,  Total Project Cost: $708,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 334244,  Location: 1.4 MI SW OF ANACRAM (Lat: 42.037781,  Lng: -73.656311),  Route carried "on" structure: County highway ,  Year Built: 1953,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 475 (year 1997),  Truck Traffic: 5%,  Average Future Daily Traffic: 475 (year 2017),  Features Intersected: TRIB ROE_JAN KILL,  Facility Carried by Structure: COUNTY ROAD 7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 27.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $234,000,  Roadway Improvement Cost: $139,000,  Total Project Cost: $373,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 334257,  Location: 0.9 MI SW OF L TAGHKANIC (Lat: 42.075819,  Lng: -73.725925),  Route carried "on" structure: County highway ,  Year Built: 1948,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 388 (year 1978),  Truck Traffic: 5%,  Average Future Daily Traffic: 388 (year 1998),  Design Load: H 20,  Features Intersected: DOVER KILL,  Facility Carried by Structure: COUNTY ROAD 8
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 49.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $208,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $332,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 334258,  Location: 0.9 MI SE OF SNYDERVILLE (Lat: 42.079939,  Lng: -73.748328),  Route carried "on" structure: County highway ,  Year Built: 1951,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 388 (year 1978),  Truck Traffic: 5%,  Average Future Daily Traffic: 388 (year 1998),  Design Load: H 20,  Features Intersected: DOVER KILL,  Facility Carried by Structure: COUNTY ROAD 8
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $208,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $332,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 5502489,  Location: 0.4 MI E OF JACKSON CORS (Lat: 42.015889,  Lng: -73.736094),  Route carried "on" structure: Other road 987G,  Year Built: 1951,  Status: Open,  Structure Length: 1.70m (5.58ft),  Average Daily Traffic: 5,971 (year 2002),  Truck Traffic: 8%,  Average Future Daily Traffic: 7,714 (year 2022),  Design Load: H 20,  Features Intersected: COUNTY ROAD 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.742,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.0m (55.8ft),  Skew: 32 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 17.6m (57.7ft),  Out-to-Out Width: 22.4m (73.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 56.5 metric tons,  Inventory Rating: 21.1 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $844,000,  Roadway Improvement Cost: $502,000,  Total Project Cost: $1,346,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 5502499,  Location: 0.7 MI S OF L TAGHKANIC (Lat: 42.073497,  Lng: -73.717183),  Route carried "on" structure: Other road 987G,  Year Built: 1951,  Status: Open,  Structure Length: 1.70m (5.58ft),  Average Daily Traffic: 5,971 (year 2002),  Truck Traffic: 8%,  Average Future Daily Traffic: 7,714 (year 2022),  Features Intersected: COUNTY ROAD 8
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.742,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.0m (68.9ft),  Skew: 32 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 22.4m (73.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 57.2 metric tons,  Inventory Rating: 23.4 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $844,000,  Roadway Improvement Cost: $502,000,  Total Project Cost: $1,346,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous

Discuss this city on our hugely popular New York forum

Back to: Gallatin, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.