![]() |
Bridge Statistics for Glen, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Glen, NY, New York, New York forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 22 Total length: 131 meters (430ft) Total costs: $30,275,000 Total average daily traffic: 167,844 Total average daily truck traffic: 17,247 National Bridge Inventory (NBI) Registered Bridges for Glen
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 100289, Location: 58MI E JCT RTS 162+5S (Lat: 42.923794, Lng: -74.423056), Route carried "on" structure: State highway 5S, Year Built: 1954, Status: Open, Structure Length: 1.31m (4.30ft), Average Daily Traffic: 1,952 (year 2006), Truck Traffic: 7%, Average Future Daily Traffic: 2,389 (year 2026), Design Load: HS 20, Features Intersected: VAN WIE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 32.656, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 6.0m (19.7ft) Condition: Channel: Fair, Culverts: Good, Operating Rating: 76.9 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.31m (4.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2006, Bridge Improvement Cost: $275,000, Roadway Improvement Cost: $164,000, Total Project Cost: $439,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 100291, Location: 2.9 MI E JCT RTS 5S & 30A (Lat: 42.930297, Lng: -74.316756), Route carried "on" structure: State highway 5S, Year Built: 1964, Status: Open, Structure Length: 5.15m (16.90ft), Average Daily Traffic: 3,277 (year 2006), Truck Traffic: 7%, Average Future Daily Traffic: 4,010 (year 2026), Design Load: HS 20, Features Intersected: AURIES CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 41.969, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 49.3m (161.7ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 10.1m (33.1ft) Condition: Deck: Satisfactory, Superstructure: Very good, Substructure: Good, Channel: Satisfactory, Operating Rating: 80.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 48.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.15m (16.90ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $275,000, Roadway Improvement Cost: $164,000, Total Project Cost: $439,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 100294, Location: 5.1 MI E JCT SH5S & SH30A (Lat: 42.937042, Lng: -74.280708), Route carried "on" structure: State highway 5S, Year Built: 1929, Year Reconstructed: 1991, Status: Open, Structure Length: 16.24m (53.28ft), Average Daily Traffic: 3,277 (year 2006), Truck Traffic: 7%, Average Future Daily Traffic: 4,010 (year 2026), Design Load: HS 20, Features Intersected: SCHOHARIE CREEK Minimum Vertical Clearance: 4.34m (14.24ft), Kilometerpoint: 44.972, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 3, Length of Maximum Span: 53.3m (174.9ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 7.4m (24.3ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Channel: Serious, Operating Rating: 42.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 25.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 16.24m (53.28ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: December 2006, Critical Feature Inspection Date: December 2006, Bridge Improvement Cost: $2,601,000, Roadway Improvement Cost: $1,509,000, Total Project Cost: $4,110,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 10214, Location: 1 MI N JCT NY 30A &NY 161 (Lat: 42.908294, Lng: -74.350417), Route carried "on" structure: State highway 30A, Year Built: 1928, Status: Open, Structure Length: 2.22m (7.28ft), Average Daily Traffic: 2,483 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 3,094 (year 2027), Design Load: HS 20, Features Intersected: AURIES CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 19.940, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 1, Length of Maximum Span: 21.3m (69.9ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 7.7m (25.3ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Channel: Very good, Operating Rating: 39.0 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.22m (7.28ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2006, Critical Feature Inspection Date: October 2006, Bridge Improvement Cost: $456,000, Roadway Improvement Cost: $271,000, Total Project Cost: $727,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 103882, Location: 3.3 MI E JCT RTS 30A& 161 (Lat: 42.887053, Lng: -74.277767), Route carried "on" structure: State highway 161, Year Built: 1997, Status: Open, Structure Length: 14.17m (46.49ft), Average Daily Traffic: 1,791 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 2,208 (year 2026), Design Load: HS 25, Features Intersected: SCHOHARIE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.883, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 70.1m (230.0ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 9.7m (31.8ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Very good, Channel: Very good, Operating Rating: 87.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 14.17m (46.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Bridge Improvement Cost: $168,000, Roadway Improvement Cost: $100,000, Total Project Cost: $268,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 109424, Location: 33MI E JCT RTS 30A+5S (Lat: 42.929231, Lng: -74.310756), Route carried "on" structure: State highway 5S, Year Built: 1929, Year Reconstructed: 1964, Status: Open, Structure Length: 0.60m (1.97ft), Average Daily Traffic: 3,277 (year 2006), Truck Traffic: 7%, Average Future Daily Traffic: 4,010 (year 2026), Features Intersected: RAVINE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 42.313, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.9m (35.8ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft) Condition: Channel: Fair, Culverts: Good, Operating Rating: 49.6 metric tons, Inventory Rating: 24.4 metric tons, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.60m (1.97ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $152,000, Roadway Improvement Cost: $90,000, Total Project Cost: $242,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 330996, Location: 3.2 MI SW OF FULTONVILLE (Lat: 42.923742, Lng: -74.419517), Route carried "on" structure: City street , Year Built: 1934, Status: Open, Structure Length: 0.97m (3.18ft), Average Daily Traffic: 73 (year 1999), Truck Traffic: 5%, Average Future Daily Traffic: 91 (year 2019), Features Intersected: VAN WIE CREEK, Facility Carried by Structure: DILLENBECK ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 4.8m (15.7ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.1m (29.9ft), Curb-To-Curb Width: 6.0m (19.7ft), Out-to-Out Width: 7.2m (23.6ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Channel: Fair, Operating Rating: 66.5 metric tons, Inventory Rating: 28.5 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 0.97m (3.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $114,000, Roadway Improvement Cost: $68,000, Total Project Cost: $182,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 330998, Location: 2.0 MI SW OF GLEN (Lat: 42.879436, Lng: -74.381758), Route carried "on" structure: County highway , Year Built: 2003, Status: Open, Structure Length: 1.74m (5.71ft), Average Daily Traffic: 112 (year 1973), Truck Traffic: 6%, Average Future Daily Traffic: 138 (year 1993), Design Load: HS 25, Features Intersected: AURIES CREEK, Facility Carried by Structure: COUNTY ROAD 110 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 4 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 16.0m (52.5ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.2m (33.5ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Channel: Very good, Operating Rating: 66.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.74m (5.71ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $114,000, Roadway Improvement Cost: $68,000, Total Project Cost: $182,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 330999, Location: 2 MI SW VILLAGE OF GLEN (Lat: 42.881767, Lng: -74.380583), Route carried "on" structure: City street , Year Built: 1935, Status: Open, Structure Length: 1.03m (3.38ft), Average Daily Traffic: 130 (year 2001), Truck Traffic: 5%, Average Future Daily Traffic: 161 (year 2021), Features Intersected: AURIES CREEK, Facility Carried by Structure: HALL ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 4.2m (13.8ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.4m (30.8ft), Curb-To-Curb Width: 4.9m (16.1ft), Out-to-Out Width: 5.7m (18.7ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Critical, Channel: Poor, Operating Rating: 65.8 metric tons, Inventory Rating: 28.1 metric tons, Structural Evaluation: High priority of replacement, Deck Geometry: High priority of replacement, Waterway Adequacy: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 1.03m (3.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $114,000, Roadway Improvement Cost: $68,000, Total Project Cost: $182,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 331, Location: 1.5 MILES WEST OF GLEN (Lat: 42.886650, Lng: -74.371361), Route carried "on" structure: County highway , Year Built: 2003, Status: Open, Structure Length: 2.01m (6.59ft), Average Daily Traffic: 371 (year 1997), Truck Traffic: 6%, Average Future Daily Traffic: 457 (year 2017), Design Load: HS 25, Features Intersected: UNNAMED CREEK, Facility Carried by Structure: COUNTY ROAD 110 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 19.0m (62.3ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.2m (33.5ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Channel: Very good, Operating Rating: 63.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 38.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.01m (6.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $442,000, Roadway Improvement Cost: $263,000, Total Project Cost: $705,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 331001, Location: .7 MILE NW OF GLEN (Lat: 42.898594, Lng: -74.355850), Route carried "on" structure: County highway , Year Built: 1923, Year Reconstructed: 1965, Status: Open, Structure Length: 1.49m (4.89ft), Average Daily Traffic: 195 (year 2002), Truck Traffic: 6%, Average Future Daily Traffic: 240 (year 2022), Features Intersected: AURIES CREEK, Facility Carried by Structure: COUNTY ROAD 118 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 4.5m (14.8ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 14.6m (47.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.6m (28.2ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 31.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 19.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.49m (4.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $442,000, Roadway Improvement Cost: $263,000, Total Project Cost: $705,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 331006, Location: 2.0 MI W OF GLEN (Lat: 42.884181, Lng: -74.295042), Route carried "on" structure: City street , Year Built: 1938, Year Reconstructed: 1964, Status: Open, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 165 (year 1999), Truck Traffic: 5%, Average Future Daily Traffic: 205 (year 2019), Features Intersected: IRISH CREEK, Facility Carried by Structure: ROUND BARN ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 4.8m (15.7ft), Skew: 5 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.9m (25.9ft), Curb-To-Curb Width: 5.0m (16.4ft), Out-to-Out Width: 5.7m (18.7ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Poor, Channel: Poor, Operating Rating: 78.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 47.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 0.85m (2.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $105,000, Roadway Improvement Cost: $63,000, Total Project Cost: $168,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 331012, Location: 5.8 MI SW OF FULTONVILLE (Lat: 42.884500, Lng: -74.279881), Route carried "on" structure: County highway , Year Built: 1910, Year Reconstructed: 1963, Status: Open, Structure Length: 0.64m (2.10ft), Average Daily Traffic: 169 (year 1997), Truck Traffic: 6%, Average Future Daily Traffic: 208 (year 2017), Features Intersected: IRISH CREEK, Facility Carried by Structure: COUNTY ROAD 129 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 5.4m (17.7ft), Material/Design: Masonry, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.0m (23.0ft), Curb-To-Curb Width: 7.1m (23.3ft), Out-to-Out Width: 12.1m (39.7ft) Condition: Superstructure: Fair, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 52.0 metric tons, Inventory Rating: 22.0 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 0.64m (2.10ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $167,000, Roadway Improvement Cost: $99,000, Total Project Cost: $266,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 5002939, Location: 0.6 MI E JCT RTS 5S & 288 (Lat: 42.931028, Lng: -74.288294), Route carried "on" structure: Interstate 90, Year Built: 1953, Year Reconstructed: 1981, Status: Open, Structure Length: 10.24m (33.60ft), Average Daily Traffic: 24,244 (year 2007), Truck Traffic: 9%, Average Future Daily Traffic: 41,203 (year 2027), Design Load: HS 20, Features Intersected: RTE 5S, OLD RR (BIKE/PED Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 45.161, Lanes on structure: 4, Lanes under structure: 2, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 33.5m (109.9ft), Skew: 34 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 26.5m (86.9ft), Curb-To-Curb Width: 33.6m (110.2ft), Out-to-Out Width: 34.5m (113.2ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 78.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 47.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 10.24m (33.60ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Bridge Improvement Cost: $7,614,000, Roadway Improvement Cost: $4,417,000, Total Project Cost: $12,031,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 5515869, Location: 90IX OVER SCHOHARIE CR (Lat: 42.931778, Lng: -74.278419), Route carried "on" structure: Interstate 90, Year Built: 1988, Status: Open, Structure Length: 21.94m (71.98ft), Average Daily Traffic: 24,295 (year 2006), Truck Traffic: 9%, Average Future Daily Traffic: 41,289 (year 2026), Design Load: HS 20+Mod, Features Intersected: SCHOHARIE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 45.908, Lanes on structure: 4, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 34.4m (112.9ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 61.6m (202.1ft), Curb-To-Curb Width: 32.9m (107.9ft), Out-to-Out Width: 34.9m (114.5ft) Condition: Deck: Good, Superstructure: Excellent, Substructure: Very good, Channel: Good, Operating Rating: 97.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 58.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 21.94m (71.98ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: September 2006, Underwater Inspection Date: August 1994, Bridge Improvement Cost: $1,133,000, Roadway Improvement Cost: $670,000, Total Project Cost: $1,803,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Epoxy, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 551587, Location: 1 MI SW OF FORT HUNTER (Lat: 42.932122, Lng: -74.315489), Route carried "on" structure: Interstate 90, Year Built: 1991, Status: Open, Structure Length: 2.01m (6.59ft), Average Daily Traffic: 24,295 (year 2006), Truck Traffic: 29%, Average Future Daily Traffic: 41,289 (year 2026), Design Load: HS 20+Mod, Features Intersected: AURIES CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 43.916, Lanes on structure: 4, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 35.4m (116.1ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 0.0m, Horizontal Clearance: 0.0m), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 20.1m (65.9ft), Curb-To-Curb Width: 34.4m (112.9ft), Out-to-Out Width: 35.4m (116.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 86.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 41.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.01m (6.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2007, Bridge Improvement Cost: $1,133,000, Roadway Improvement Cost: $670,000, Total Project Cost: $1,803,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 551588, Location: 1.2 MI SE OF FULTONVILLE (Lat: 42.940844, Lng: -74.342797), Route carried "on" structure: Other road 920P, Year Built: 1955, Year Reconstructed: 1994, Status: Open, Structure Length: 12.53m (41.11ft), Average Daily Traffic: 1,199 (year 2005), Truck Traffic: 7%, Average Future Daily Traffic: 1,467 (year 2025), Design Load: HS 25, Features Intersected: RTE I90, Bike Path, CR 1 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.043, Lanes on structure: 2, Lanes under structure: 6, Base Highway Network: Yes, Owner: State Toll Authority, Approaching Roadway Width: 9.8m (32.2ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 25.9m (85.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 9.8m (32.2ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Good, Operating Rating: 86.2 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 49.9 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 12.53m (41.11ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $1,133,000, Roadway Improvement Cost: $670,000, Total Project Cost: $1,803,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Galvanized Reinforcing Find on map >>
Structure Number: 551589, Location: EXIT 28 OF I90 (Lat: 42.944867, Lng: -74.359694), Route carried "on" structure: Ramp Interstate , Year Built: 1955, Year Reconstructed: 1992, Status: Open, Structure Length: 6.30m (20.67ft), Average Daily Traffic: 1,000 (year 2000), Truck Traffic: 10%, Average Future Daily Traffic: 1,700 (year 2020), Design Load: HS 20+Mod, Features Intersected: RTE I90, Facility Carried by Structure: FULTONVILLE INT. Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 5, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 12.1m (39.7ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 20.1m (65.9ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 0.3m (1.0ft), Curb-To-Curb Width: 11.8m (38.7ft), Out-to-Out Width: 13.1m (43.0ft) Condition: Deck: Poor, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 63.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 37.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 6.30m (20.67ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $1,780,000, Roadway Improvement Cost: $1,059,000, Total Project Cost: $2,839,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 55159, Location: 1.5 MI NE OF RANDALL (Lat: 42.926731, Lng: -74.423972), Route carried "on" structure: Interstate 90, Year Built: 1955, Year Reconstructed: 1990, Status: Open, Structure Length: 1.07m (3.51ft), Average Daily Traffic: 23,774 (year 2007), Truck Traffic: 18%, Average Future Daily Traffic: 40,404 (year 2027), Design Load: HS 20+Mod, Features Intersected: VAN WIE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 32.980, Lanes on structure: 4, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 24.7m (81.0ft), Skew: 20 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.1m (29.9ft), Curb-To-Curb Width: 34.4m (112.9ft), Out-to-Out Width: 37.7m (123.7ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 79.1 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.07m (3.51ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2007, Bridge Improvement Cost: $866,000, Roadway Improvement Cost: $515,000, Total Project Cost: $1,381,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 5002939, Location: 0.6 MI E JCT RTS 5S & 288 (Lat: 42.931028, Lng: -74.288294), Route carried "under" structure: State highway 5S, Year Built: 1953, Structure Length: 10.24m (33.60ft), Average Daily Traffic: 3,277 (year 2006), Truck Traffic: 7%, Features Intersected: RTE 5S, OLD RR (BIKE/PED, Facility Carried by Structure: RTE I90 Minimum Vertical Clearance: 8.23m (27.00ft), Kilometerpoint: 44.151, Lanes on structure: 4, Lanes under structure: 2, Toll: On toll road, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.5m (86.9ft) Find on map >>
Structure Number: 551588, Location: 1.2 MI SE OF FULTONVILLE (Lat: 42.940844, Lng: -74.342797), Route carried "under" structure: Interstate 90, Year Built: 1955, Structure Length: 12.53m (41.11ft), Average Daily Traffic: 24,244 (year 2007), Features Intersected: RTE I90, Bike Path, CR 1, Facility Carried by Structure: RTE 920P Minimum Vertical Clearance: 10.06m (33.01ft), Kilometerpoint: 40.305, Lanes on structure: 2, Lanes under structure: 4, Toll: On toll road, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 25.9m (85.0ft) Find on map >>
Structure Number: 551589, Location: EXIT 28 OF I90 (Lat: 42.944867, Lng: -74.359694), Route carried "under" structure: Interstate 90, Year Built: 1955, Structure Length: 6.30m (20.67ft), Average Daily Traffic: 24,244 (year 2007), Features Intersected: RTE I90, Facility Carried by Structure: FULTONVILLE INT. Minimum Vertical Clearance: 4.37m (14.34ft), Kilometerpoint: 39.861, Lanes on structure: 2, Lanes under structure: 5, Toll: On toll road, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 20.1m (65.9ft) Discuss this city on our hugely popular New York forum Back to: Glen, NY, New York, All US cities.
|
![]() |