Bridge Statistics for Goffstown, New Hampshire (NH) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Goffstown, NH, New Hampshire, New Hampshire forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 18
Total length: 18 meters (59ft)
Total costs: $27,000,000
Total average daily traffic: 59,450
Total average daily truck traffic: 2,806
Total future (year 2026) average daily traffic: 87,986
National Bridge Inventory (NBI) Registered Bridges for Goffstown

New bridges - Historical Statistics

  • 1920-1929: 2
  • 1930-1939: 7
  • 1940-1949: 0
  • 1950-1959: 0
  • 1960-1969: 0
  • 1970-1979: 3
  • 1980-1989: 0
  • 1990-1999: 5
  • 2000-2009: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 95005100114,  Location: NEW BOSTON TL (Lat: 43.023125,  Lng: -71.631758),  Route carried "on" structure: Other road ,  Year Built: 2000,  Status: Open,  Structure Length: 1.91m (6.27ft),  Average Daily Traffic: 1,000 (year 2003),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,480 (year 2026),  Design Load: HS 25,  Features Intersected: PISCATAQUOG RIVER,  Facility Carried by Structure: PARKER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.1m (62.7ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 92.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.91m (6.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 95005300119,  Location: 0.5 MI FROM NEW BOSTON TL (Lat: 43.026381,  Lng: -71.629069),  Route carried "on" structure: Other road ,  Year Built: 1923,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 2,400 (year 2003),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,552 (year 2026),  Features Intersected: GORHAM POND BROOK,  Facility Carried by Structure: PARKER STATION RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.837,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 22.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.61m (2.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 95005400116,  Location: .2 MI E NEW BOSTON TL (Lat: 43.024617,  Lng: -71.629100),  Route carried "on" structure: State highway 114,  Year Built: 1972,  Status: Open,  Structure Length: 0.49m (1.61ft),  Average Daily Traffic: 9,300 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 13,764 (year 2026),  Design Load: H 20,  Features Intersected: GORHAM POND BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.49m (1.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008)
Find on map >>

Structure Number: 9500670009,  Location: 0.7MI NEW BOSTON TL (Lat: 43.003619,  Lng: -71.616303),  Route carried "on" structure: Other road ,  Year Built: 1935,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 390 (year 2003),  Truck Traffic: 4%,  Average Future Daily Traffic: 577 (year 2026),  Features Intersected: BOG BROOK,  Facility Carried by Structure: BOG ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.094,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 39.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 95007100095,  Location: 1.0 MI NEW BOSTON TL (Lat: 43.007797,  Lng: -71.613106),  Route carried "on" structure: Other road ,  Year Built: 1935,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 310 (year 2003),  Truck Traffic: 4%,  Average Future Daily Traffic: 459 (year 2026),  Features Intersected: BOG BROOK,  Facility Carried by Structure: BOG ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.642,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.5m (18.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 36.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 95007100104,  Location: 1.0 MI E NEW BOSTON TL (Lat: 43.015347,  Lng: -71.610294),  Route carried "on" structure: State highway 13,  Year Built: 1933,  Status: Open,  Structure Length: 0.55m (1.80ft),  Average Daily Traffic: 4,600 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,808 (year 2026),  Features Intersected: BOG BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.625,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 38.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.55m (1.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 95008200107,  Location: .4 MI W NH114,  Route carried "on" structure: Other road ,  Year Built: 1996,  Status: Open,  Structure Length: 0.40m (1.31ft),  Features Intersected: WHITTLE BROOK,  Facility Carried by Structure: WEST UNION STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 1 degrees,  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Very good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.40m (1.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008)
Find on map >>

Structure Number: 95008400104,  Location: 1.6 MI NE NEW BOSTON TL (Lat: 43.015983,  Lng: -71.599911),  Route carried "on" structure: State highway 13,  Year Built: 1932,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 4,600 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,808 (year 2026),  Features Intersected: WHITTLE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.494,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 40.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 95008500098,  Location: 0.5 MI NH114 (Lat: 43.008725,  Lng: -71.599622),  Route carried "on" structure: Other road ,  Year Built: 1975,  Status: Open,  Structure Length: 0.34m (1.12ft),  Average Daily Traffic: 2,100 (year 2003),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,108 (year 2026),  Features Intersected: WHITTLE BROOK,  Facility Carried by Structure: MOUNTAIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.279,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 24.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.34m (1.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008)
Find on map >>

Structure Number: 950085001,  Location: 0.1MI. NH114 (Lat: 43.011897,  Lng: -71.598431),  Route carried "on" structure: City street ,  Year Built: 1930,  Status: Open,  Structure Length: 0.46m (1.51ft),  Average Daily Traffic: 1,800 (year 1993),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,664 (year 2026),  Features Intersected: WHITTLE BROOK,  Facility Carried by Structure: MOUNTAIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.971,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.46m (1.51ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 95008500107,  Location: .3 MI S JCT RT 13 (Lat: 43.018000,  Lng: -71.599453),  Route carried "on" structure: State highway 114,  Year Built: 1928,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 15,000 (year 2003),  Truck Traffic: 5%,  Average Future Daily Traffic: 22,200 (year 2026),  Design Load: HS 25,  Features Intersected: PISCATAQUOG RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.058,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 68.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008)
Find on map >>

Structure Number: 95008600093,  Location: TOWN RD (Lat: 43.006497,  Lng: -71.600025),  Route carried "on" structure: Other road ,  Year Built: 1993,  Status: Open,  Structure Length: 0.49m (1.61ft),  Average Daily Traffic: 200 (year 1993),  Truck Traffic: 4%,  Average Future Daily Traffic: 296 (year 2026),  Features Intersected: WHITTLE BROOK,  Facility Carried by Structure: MERRILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.49m (1.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 95012900116,  Location: .07Mi Fr.Locust Hill RD (Lat: 43.023714,  Lng: -71.554625),  Route carried "on" structure: Other road ,  Year Built: 1972,  Status: Open,  Structure Length: 0.55m (1.80ft),  Average Daily Traffic: 650 (year 1993),  Truck Traffic: 4%,  Average Future Daily Traffic: 962 (year 2026),  Design Load: HS 20,  Features Intersected: HARRY BROOK,  Facility Carried by Structure: CENTER STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.5m (18.0ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 40.8 metric tons,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.55m (1.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008)
Find on map >>

Structure Number: 95013600106,  Location: 3.0 MI FROM BEDFORD TL (Lat: 43.016572,  Lng: -71.549450),  Route carried "on" structure: Other road ,  Year Built: 1937,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 7,300 (year 2003),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,804 (year 2026),  Design Load: HS 25,  Features Intersected: PISCATAQUOG RIVER,  Facility Carried by Structure: HENRY BRIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.844,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.0m (118.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Critical Feature Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 95013700107,  Location: TOWN RD (Lat: 43.018397,  Lng: -71.548153),  Route carried "on" structure: Other road ,  Year Built: 1930,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 7,300 (year 2003),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,804 (year 2026),  Features Intersected: HARRY BROOK,  Facility Carried by Structure: HENRY BRIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.086,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 22.8 metric tons,  Inventory Rating: 13.7 metric tons,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 95016200141,  Location: 1.9MI Fr Goffstwn Back RD (Lat: 43.042742,  Lng: -71.523967),  Route carried "on" structure: Other road ,  Year Built: 1994,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 1,200 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,776 (year 2026),  Design Load: HS 25,  Features Intersected: BLACK BROOK,  Facility Carried by Structure: TIRRELL HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.993,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Steel plate,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 95016600138,  Location: TOWN ROAD (Lat: 43.039761,  Lng: -71.520683),  Route carried "on" structure: Other road ,  Year Built: 1993,  Status: Closed,  Structure Length: 0.00m,  Features Intersected: BLACK BROOK,  Facility Carried by Structure: POLLARDS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Length of Maximum Span: 0.0m

Condition: Channel: Failed,  Culverts: Failed,  Waterway Adequacy: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008)
Find on map >>

Structure Number: 95017300133,  Location: TOWN RD (Lat: 43.036447,  Lng: -71.511600),  Route carried "on" structure: Other road ,  Year Built: 1994,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 1,300 (year 2003),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,924 (year 2026),  Design Load: HS 25,  Features Intersected: BLACK BROOK,  Facility Carried by Structure: EAST DUNBARTON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Steel plate,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric

Discuss this city on our hugely popular New Hampshire forum

Back to: Goffstown, NH, New Hampshire, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.