National Bridge Inventory (NBI) Statistics
Number of bridges: 34
Total length: 46 meters (151ft)
Total costs: $68,000
Total average daily traffic: 106,645
Total average daily truck traffic: 4,233
Total future (year 2026) average daily traffic: 53,323
National Bridge Inventory (NBI) Registered Bridges for Granby

New bridges - Historical Statistics

  • 1930-1939: 7
  • 1940-1949: 3
  • 1950-1959: 16
  • 1960-1969: 3
  • 1970-1979: 0
  • 1980-1989: 3
  • 1990-1999: 2

Reconstructed bridges - Historical Statistics

  • 1980-1989: 3
  • 1990-1999: 0
  • 2000-2009: 2

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 654,  Location: 0.8 MI SOUTH OF ROUTE 20 (Lat: 41.945000,  Lng: -72.793333),  Route carried "on" structure: State highway 10,  Year Built: 1935,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 12,100 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,050 (year 2026),  Design Load: H 20,  Features Intersected: WEST BRANCH SALMON BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 80.482,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Inventory Rating: 60.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 655,  Location: 0.7 MILE NORTH OF RTE. 20 (Lat: 41.965000,  Lng: -72.790000),  Route carried "on" structure: State highway 10,  Year Built: 1942,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 9,100 (year 2004),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,550 (year 2026),  Design Load: H 20,  Features Intersected: SALMON BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 83.073,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 40.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 879,  Location: 1.2 MILES WEST OF RTE 219 (Lat: 41.980000,  Lng: -72.873333),  Route carried "on" structure: State highway 20,  Year Built: 1957,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 1,700 (year 2006),  Truck Traffic: 2%,  Average Future Daily Traffic: 850 (year 2026),  Design Load: HS 20,  Features Intersected: MOOSEHORN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.707,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 52.2 metric tons,  Inventory Rating: 36.0 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000)
Find on map >>

Structure Number: 88,  Location: 0.4 MI WEST OF ROUTE 219 (Lat: 41.955000,  Lng: -72.860000),  Route carried "on" structure: State highway 20,  Year Built: 1934,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 2,300 (year 2006),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,150 (year 2026),  Design Load: H 20,  Features Intersected: WEST BRANCH SALMON BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.171,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 73.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 881,  Location: 0.2 MILE WEST OF RTE. 219 (Lat: 41.956667,  Lng: -72.858333),  Route carried "on" structure: State highway 20,  Year Built: 1957,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 2,300 (year 2006),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,150 (year 2026),  Design Load: HS 20,  Features Intersected: WEST BRANCH SALMON BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.461,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 66.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 882,  Location: .6 MILE EAST ROUTE 10&202 (Lat: 41.950000,  Lng: -72.780000),  Route carried "on" structure: State highway 20,  Year Built: 1940,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 12,300 (year 2004),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,150 (year 2026),  Design Load: HS 20,  Features Intersected: SALMON BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.540,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Inventory Rating: 75.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 1511,  Location: 0.2 MI NO OF E. GRANBY TL (Lat: 41.935000,  Lng: -72.780000),  Route carried "on" structure: State highway 189,  Year Built: 1941,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 7,200 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,600 (year 2026),  Design Load: HS 20,  Features Intersected: SALMON BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.517,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.4m (126.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Inventory Rating: 73.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1512,  Location: 0.5 MILE SOUTH OF SR 539 (Lat: 42.008333,  Lng: -72.835000),  Route carried "on" structure: State highway 189,  Year Built: 1933,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 2,100 (year 2005),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,050 (year 2026),  Features Intersected: BELDEN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.466,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 1514,  Location: 0.9 MILE SOUTH OF MASS SL (Lat: 42.016667,  Lng: -72.861667),  Route carried "on" structure: State highway 189,  Year Built: 1935,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,600 (year 2005),  Truck Traffic: 3%,  Average Future Daily Traffic: 800 (year 2026),  Design Load: H 20,  Features Intersected: CROOKED BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.215,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 1562,  Location: .8 MI N OF BARKHAMSTED TL (Lat: 41.956667,  Lng: -72.881667),  Route carried "on" structure: State highway 219,  Year Built: 1959,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 5,900 (year 2006),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,950 (year 2026),  Design Load: HS 20,  Features Intersected: MOUNTAIN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.496,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 63.0 metric tons,  Inventory Rating: 40.5 metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000)
Find on map >>

Structure Number: 1563,  Location: 1.98 MI SO BARKHAMSTED TL (Lat: 41.958333,  Lng: -72.863333),  Route carried "on" structure: State highway 219,  Year Built: 1959,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 6,000 (year 2005),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,000 (year 2026),  Design Load: HS 20,  Features Intersected: MOUNTAIN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.363,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 72.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1564,  Location: .3 MI (S) OF JCT ROUTE 20 (Lat: 41.960000,  Lng: -72.860000),  Route carried "on" structure: State highway 219,  Year Built: 1959,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 6,000 (year 2005),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,000 (year 2026),  Design Load: HS 20,  Features Intersected: MOUNTAIN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.620,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 86.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1565,  Location: 100' SOUTH JCT OF 219 &20 (Lat: 41.951667,  Lng: -72.856667),  Route carried "on" structure: State highway 219,  Year Built: 1959,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 6,000 (year 2005),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,000 (year 2026),  Design Load: HS 20,  Features Intersected: WEST BRANCH SALMON BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.038,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 81.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 2209,  Location: .2 MI EAST OF ROUTE 219 (Lat: 41.960000,  Lng: -72.851667),  Route carried "on" structure: State highway 20,  Year Built: 1934,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 8,100 (year 2006),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,050 (year 2026),  Design Load: H 20,  Features Intersected: HIGLEY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.056,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 4516,  Location: 250' S OF LOST ACRES ROAD (Lat: 42.005000,  Lng: -72.845000),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 350 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 175 (year 2026),  Design Load: HS 20,  Features Intersected: BELDEN BROOK,  Facility Carried by Structure: DONAHUE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 4517,  Location: 40' NORTH OF ROUTE 189 (Lat: 42.005000,  Lng: -72.833333),  Route carried "on" structure: City street ,  Year Built: 1969,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 530 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 265 (year 2026),  Design Load: HS 20,  Features Intersected: EAST BRANCH SALMON BROOK,  Facility Carried by Structure: SILVER STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 76.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Underwater Inspection Date: December 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 4518,  Location: 1100' EAST OF ROUTE 189 (Lat: 41.985000,  Lng: -72.826667),  Route carried "on" structure: City street ,  Year Built: 1937,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,100 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 550 (year 2026),  Features Intersected: EAST BRANCH SALMON BROOK,  Facility Carried by Structure: EAST STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.558,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 54.0 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 4519,  Location: 200'SOUTH OF MEADOW BK RD (Lat: 41.980000,  Lng: -72.806667),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 1,700 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 850 (year 2026),  Design Load: HS 20,  Features Intersected: EAST BRANCH SALMON BROOK,  Facility Carried by Structure: WELLS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.965,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 80.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 452,  Location: 20' FROM HARVEST LANE (Lat: 41.998333,  Lng: -72.811667),  Route carried "on" structure: City street ,  Year Built: 1937,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,400 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 700 (year 2026),  Design Load: H 20,  Features Intersected: BRADLEY BROOK,  Facility Carried by Structure: EAST STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.255,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 4521,  Location: 900' EAST OF ROUTE 189 (Lat: 41.980000,  Lng: -72.803333),  Route carried "on" structure: City street ,  Year Built: 1969,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 460 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 230 (year 2026),  Design Load: HS 20,  Features Intersected: EAST BRANCH SALMON BROOK,  Facility Carried by Structure: MECHANICSVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.290,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 62.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 4522,  Location: 0.3 MI NORTH OF ROUTE 20 (Lat: 41.953333,  Lng: -72.785000),  Route carried "on" structure: City street ,  Year Built: 1967,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 580 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 290 (year 2026),  Design Load: HS 20,  Features Intersected: SALMON BROOK,  Facility Carried by Structure: HUNGARY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 4523,  Location: 250' JCT BARNDOOR HILL RD (Lat: 41.923333,  Lng: -72.823333),  Route carried "on" structure: City street ,  Year Built: 1956,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 950 (year 2007),  Truck Traffic: 2%,  Average Future Daily Traffic: 475 (year 2026),  Design Load: HS 20,  Features Intersected: BISSELL BROOK,  Facility Carried by Structure: SIMSBURY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.020,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 4524,  Location: 1.2 MI FROM JCT ROUTE 20 (Lat: 41.936667,  Lng: -72.821667),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 350 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 175 (year 2026),  Features Intersected: WEST BRANCH SALMON BROOK,  Facility Carried by Structure: BARNDOOR HILLS RD2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.963,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 4525,  Location: 0.2 MI NO. OF FIRETOWN RD (Lat: 41.936667,  Lng: -72.833333),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 1,270 (year 2007),  Truck Traffic: 2%,  Average Future Daily Traffic: 635 (year 2026),  Design Load: HS 20,  Features Intersected: WEST BRANCH SALMON BROOK,  Facility Carried by Structure: SIMSBURY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.595,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 4526,  Location: 40' FROM SIMSBURY ROAD (Lat: 41.958333,  Lng: -72.843333),  Route carried "on" structure: City street ,  Year Built: 1956,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 230 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 115 (year 2026),  Design Load: HS 20,  Features Intersected: WEST BRANCH SALMON BROOK,  Facility Carried by Structure: BROAD HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.202,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 4527,  Location: 250' FROM JCT OF ROUTE 20 (Lat: 41.955000,  Lng: -72.858333),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 10 (year 2007),  Average Future Daily Traffic: 5 (year 2026),  Design Load: HS 20,  Features Intersected: WEST BRANCH SALMON BROOK,  Facility Carried by Structure: FOX ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 4528,  Location: 400' FROM JCT HIGLEY ROAD (Lat: 41.978333,  Lng: -72.871667),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 10 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 5 (year 2026),  Design Load: HS 15,  Features Intersected: MOOSEHORN BROOK,  Facility Carried by Structure: MOOSEHORN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.257,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 5.1m (16.7ft),  Out-to-Out Width: 5.7m (18.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 453,  Location: 500' WEST OF SILVER ST (Lat: 42.023333,  Lng: -72.846667),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 15 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 8 (year 2026),  Design Load: HS 20,  Features Intersected: CARSON POND BROOK,  Facility Carried by Structure: DOHERTY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Channel: Satisfactory,  Culverts: Serious,  Operating Rating: 52.2 metric tons,  Inventory Rating: 36.0 metric tons,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2007,  Other Special Inspection Date: October 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000)
Find on map >>

Structure Number: 4531,  Location: 0.4 MI SO. OF RTE 10/202 (Lat: 41.986667,  Lng: -72.803333),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 450 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 225 (year 2026),  Design Load: HS 20,  Features Intersected: BRADLEY BROOK,  Facility Carried by Structure: MEADOW BROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.595,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Channel: Fair,  Culverts: Serious,  Operating Rating: 54.0 metric tons,  Inventory Rating: 36.0 metric tons,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000)
Find on map >>

Structure Number: 5757,  Location: 1 MILE NORTH ROUTE 10&202 (Lat: 41.956667,  Lng: -72.796667),  Route carried "on" structure: State highway 189,  Year Built: 1988,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 8,300 (year 2006),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,150 (year 2026),  Design Load: HS 20,  Features Intersected: KENDELL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.689,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.4m (7.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 58.5 metric tons,  Inventory Rating: 40.5 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000)
Find on map >>

Structure Number: 5827,  Location: 700 FEET SOUTH OF SR 539 (Lat: 41.986667,  Lng: -72.830000),  Route carried "on" structure: State highway 189,  Year Built: 1988,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 4,500 (year 2005),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,250 (year 2026),  Design Load: HS 20,  Features Intersected: MOUNTAIN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.532,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000)
Find on map >>

Structure Number: 5892,  Location: 1.05 MI SOUTH OF MASS SL (Lat: 42.026667,  Lng: -72.860000),  Route carried "on" structure: State highway 189,  Year Built: 1990,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,600 (year 2005),  Truck Traffic: 3%,  Average Future Daily Traffic: 800 (year 2026),  Design Load: HS 20,  Features Intersected: EAST BRANCH SALMON BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.054,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 6196,  Location: JCT OF HIGLEY RD (Lat: 41.961667,  Lng: -72.853333),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 20 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 10 (year 2026),  Features Intersected: HIGLEY BROOK,  Facility Carried by Structure: THORNEBROOK DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.218,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 25.6m (84.0ft)

Condition: Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 67.5 metric tons,  Inventory Rating: 40.5 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000)
Find on map >>

Structure Number: 6197,  Location: 100' EAST OF RTE.189 (Lat: 42.036667,  Lng: -72.861667),  Route carried "on" structure: City street ,  Year Built: 1982,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 120 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 60 (year 2026),  Features Intersected: EAST BRANCH SALMON BROOK,  Facility Carried by Structure: NORTHWOODS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Channel: Good,  Culverts: Serious,  Operating Rating: 52.2 metric tons,  Inventory Rating: 36.0 metric tons,  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000)

Discuss this city on our hugely popular Connecticut forum

Back to: Granby, CT, Connecticut, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.