![]() |
Bridge Statistics for Greenwood, Mississippi (MS) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Greenwood, MS, Mississippi, Mississippi forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 11 Total length: 112 meters (367ft) Total costs: $3,904,000 Total average daily traffic: 107,020 Total average daily truck traffic: 11,941 National Bridge Inventory (NBI) Registered Bridges for Greenwood
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Bridge Condition - Culverts Find on map >>
Structure Number: 21000820420606, Location: 2.1 MI W US 49E SOUTH (Lat: 33.520217, Lng: -90.203589), Route carried "on" structure: US 82, Year Built: 1954, Status: Open, Structure Length: 24.20m (79.40ft), Average Daily Traffic: 22,000 (year 2005), Truck Traffic: 16%, Average Future Daily Traffic: 33,000 (year 2025), Design Load: HS 15, Features Intersected: YAZOO RIVER Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 26.142, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 19.8m (65.0ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 13, Length of Maximum Span: 54.9m (180.1ft), Curb or Sidewalk Widths: Left: 1.7m (5.6ft), Right: 1.7m (5.6ft), Curb-To-Curb Width: 15.8m (51.8ft), Out-to-Out Width: 17.7m (58.1ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Good, Channel: Good, Operating Rating: 35.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 23.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 24.38m (79.99ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 12 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: July 2007, Critical Feature Inspection Date: July 2007, Underwater Inspection Date: November 2004, Bridge Improvement Cost: $550,000, Roadway Improvement Cost: $30,000, Total Project Cost: $600,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 21000820420625, Location: 0.2 MI W US 49E SOUTH (Lat: 33.504492, Lng: -90.184308), Route carried "on" structure: US 82, Year Built: 1962, Status: Open, Structure Length: 9.27m (30.41ft), Average Daily Traffic: 22,000 (year 2005), Truck Traffic: 9%, Average Future Daily Traffic: 33,000 (year 2025), Design Load: HS 20, Features Intersected: CNIC RR/CITY STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 29.049, Lanes on structure: 6, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 27.4m (89.9ft), Skew: 20 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 21.3m (69.9ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 0.6m (2.0ft), Curb-To-Curb Width: 24.4m (80.1ft), Out-to-Out Width: 26.1m (85.6ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Fair, Operating Rating: 63.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 55.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 9.27m (30.41ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Bridge Improvement Cost: $480,000, Roadway Improvement Cost: $20,000, Total Project Cost: $500,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 21000820420627, Location: US 82 OVER US 49E (Lat: 33.503647, Lng: -90.181314), Route carried "on" structure: US 82, Year Built: 1962, Status: Open, Structure Length: 6.83m (22.41ft), Average Daily Traffic: 20,000 (year 2005), Truck Traffic: 15%, Average Future Daily Traffic: 30,000 (year 2025), Design Load: HS 20, Features Intersected: US 49E Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 29.341, Lanes on structure: 6, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 27.4m (89.9ft), Skew: 22 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 17.1m (56.1ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 0.6m (2.0ft), Curb-To-Curb Width: 24.4m (80.1ft), Out-to-Out Width: 26.1m (85.6ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 93.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 60.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 3100007042038, Location: 0.8 MI N US 82 (Lat: 33.522214, Lng: -90.151664), Route carried "on" structure: State highway 7, Year Built: 1969, Year Reconstructed: 1995, Status: Open, Structure Length: 5.49m (18.01ft), Average Daily Traffic: 11,000 (year 2005), Truck Traffic: 8%, Average Future Daily Traffic: 16,500 (year 2025), Design Load: HS 20, Features Intersected: PELUCIA CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 35.903, Lanes on structure: 5, Base Highway Network: Yes (, Subroute: 1), Owner: State Highway Agency, Approaching Roadway Width: 24.5m (80.4ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 18.3m (60.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 19.0m (62.3ft), Out-to-Out Width: 23.8m (78.1ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Very good, Operating Rating: 61.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 38.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: SA4200000000027, Location: SEC 10 T19N R 1E (Lat: 33.522167, Lng: -90.180722), Route carried "on" structure: City street 1085, Year Built: 1964, Status: Open, Structure Length: 28.13m (92.29ft), Average Daily Traffic: 9,100 (year 2006), Truck Traffic: 8%, Average Future Daily Traffic: 13,650 (year 2026), Design Load: HS 20, Features Intersected: YAZOO RIVER, Facility Carried by Structure: POPLAR STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.965, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 13, Length of Maximum Span: 47.2m (154.9ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.3m (1.0ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 11.6m (38.1ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Very good, Channel: Good, Operating Rating: 43.2 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: SA4200000000028, Location: SEC 10 T19N R 1E (Lat: 33.522222, Lng: -90.176667), Route carried "on" structure: City street 1095, Year Built: 1988, Status: Open, Structure Length: 0.67m (2.20ft), Average Daily Traffic: 6,000 (year 2006), Truck Traffic: 8%, Average Future Daily Traffic: 9,000 (year 2026), Design Load: HS 20, Features Intersected: PALUSHA BAYOU, Facility Carried by Structure: MARKET STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 9.1m (29.9ft) Condition: Channel: Very good, Culverts: Good, Operating Rating: 43.2 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.67m (2.20ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $23,000, Roadway Improvement Cost: $20,000, Total Project Cost: $48,000 ( Estimate for 2007) Find on map >>
Structure Number: SA420000000003, Location: SEC 11 T19N R 1E (Lat: 33.530556, Lng: -90.163889), Route carried "on" structure: City street 228, Year Built: 1971, Status: Open, Structure Length: 1.74m (5.71ft), Average Daily Traffic: 120 (year 2006), Truck Traffic: 8%, Average Future Daily Traffic: 180 (year 2026), Design Load: H 15, Features Intersected: RELIEF DITCH, Facility Carried by Structure: IONE STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.965, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Concrete, Design/Construction: Channel Beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 5.8m (19.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 8.1m (26.6ft), Out-to-Out Width: 8.5m (27.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Very good, Channel: Very good, Operating Rating: 22.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 17.1 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.74m (5.71ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $32,000, Roadway Improvement Cost: $10,000, Total Project Cost: $47,000 ( Estimate for 2007), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: SA4200000000031, Location: SEC 11 T19N R 1E (Lat: 33.520750, Lng: -90.160556), Route carried "on" structure: City street 1099, Year Built: 1994, Status: Open, Structure Length: 0.77m (2.53ft), Average Daily Traffic: 3,000 (year 2006), Truck Traffic: 8%, Average Future Daily Traffic: 4,500 (year 2026), Design Load: HS 20, Features Intersected: PALUSHA BAYOU, Facility Carried by Structure: MADISON STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.321, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 10.4m (34.1ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft) Condition: Channel: Very good, Culverts: Very good, Operating Rating: 43.2 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007 Find on map >>
Structure Number: SA4200000000105, Location: SEC 10 T19N R 1E (Lat: 33.518056, Lng: -90.185000), Route carried "on" structure: City street 1091, Year Built: 1925, Status: Open, Structure Length: 21.58m (70.80ft), Average Daily Traffic: 6,200 (year 2006), Truck Traffic: 8%, Average Future Daily Traffic: 9,300 (year 2026), Design Load: HS 15, Features Intersected: YAZOO RIVER, Facility Carried by Structure: GRAND BLVD 9504 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.410, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Steel, Design/Construction: Movable - Swing, Number Of Spans In Main Unit: 2, Number Of Approach Spans: 12, Length of Maximum Span: 44.5m (146.0ft), Curb or Sidewalk Widths: Left: 2.3m (7.5ft), Right: 2.3m (7.5ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 12.5m (41.0ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Fair, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 24.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 22.10m (72.51ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: October 2007, Critical Feature Inspection Date: October 2007, Underwater Inspection Date: June 2005, Bridge Improvement Cost: $2,300,000, Roadway Improvement Cost: $140,000, Total Project Cost: $2,709,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 21000820420627, Location: US 82 OVER US 49E (Lat: 33.503647, Lng: -90.181314), Route carried "under" structure: US 49E, Year Built: 1962, Structure Length: 6.83m (22.41ft), Average Daily Traffic: 3,800 (year 2005), Truck Traffic: 8%, Features Intersected: US 49E, Facility Carried by Structure: US 82 Minimum Vertical Clearance: 4.64m (15.22ft), Kilometerpoint: 18.873, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 17.1m (56.1ft) Find on map >>
Structure Number: 21000820420627, Location: US 82 OVER US 49E (Lat: 33.503647, Lng: -90.181314), Route carried "under" structure: US 49E, Year Built: 1962, Structure Length: 6.83m (22.41ft), Average Daily Traffic: 3,800 (year 2005), Truck Traffic: 8%, Features Intersected: US 49E, Facility Carried by Structure: US 82 Minimum Vertical Clearance: 4.64m (15.22ft), Kilometerpoint: 18.873, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 17.1m (56.1ft) Discuss this city on our hugely popular Mississippi forum Back to: Greenwood, MS, Mississippi, All US cities.
|
![]() |