Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Greig, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 92ft / 28.3mTotal length
  • $8,891,000Total costs
  • 4,727Total average daily traffic
  • 359Total average daily truck traffic
  • 6,617Total future (year 2034) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Greig
  • No street view available for this location

New bridges in Greig, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11950-1959
  • 21960-1969
  • 31970-1979
  • 21980-1989
  • 12000-2009
Reconstructed bridges in Greig, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11990-1999
  • 12000-2009
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Excellent
  • 30.0%Very good
  • 20.0%Good
  • 20.0%Satisfactory
  • 10.0%Fair
  • 10.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Excellent
  • 30.0%Very good
  • 30.0%Good
  • 20.0%Fair
  • 10.0%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.0%Very good
  • 30.0%Good
  • 30.0%Satisfactory
  • 10.0%Fair
  • 10.0%Poor
  • 10.0%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.0%Very good
  • 20.0%Good
  • 20.0%Satisfactory
  • 40.0%Fair
Find on map >>   Show street view

Structure Number: 222037,  Location: 1.6 MI S OF BRANTINGHAM (Lat: 43.665639,  Lng: -75.292667),  Route carried "on" structure: Other road ,  Year Built: 1950,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 78 (year 2015),  Truck Traffic: 7%,  Average Future Daily Traffic: 109 (year 2035),  Features Intersected: FISH CREEK,  Facility Carried by Structure: NORTH SOUTH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.092,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $98,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $156,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 222038,  Location: 1.9 MI SE OF GREIG (Lat: 43.663792,  Lng: -75.329397),  Route carried "on" structure: Other road ,  Year Built: 1973,  Status: Posted for load,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 128 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 179 (year 2038),  Features Intersected: FISH CREEK,  Facility Carried by Structure: FISH CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.462,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 9.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 9.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $104,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $164,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 222039,  Location: 7.4 MI NE OF BRANTINGHAM (Lat: 43.725700,  Lng: -75.179133),  Route carried "on" structure: Other road ,  Year Built: 1978,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 23 (year 2014),  Truck Traffic: 7%,  Average Future Daily Traffic: 32 (year 2034),  Features Intersected: OTTER CREEK,  Facility Carried by Structure: PARTRIDGEVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.293,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Critical,  Channel: Fair,  Operating Rating: 14.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 8.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $214,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $339,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 22204,  Location: 3 MILES EAST OF GLENFIELD (Lat: 43.714472,  Lng: -75.343400),  Route carried "on" structure: Other road ,  Year Built: 1920,  Status: Posted for load,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 37 (year 2018),  Average Future Daily Traffic: 52 (year 2038),  Features Intersected: OTTER CREEK,  Facility Carried by Structure: EATONVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.381,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Fair,  Superstructure: Serious,  Substructure: Poor,  Channel: Fair,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 8.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $103,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $164,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 333971,  Location: 0.7 MI SW OF GREIG (Lat: 43.676875,  Lng: -75.361394),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 8.02m (26.31ft),  Average Daily Traffic: 876 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,226 (year 2040),  Design Load: HS 20,  Features Intersected: BLACK RIVER,  Facility Carried by Structure: BURDICKS CROSSING
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.770,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.98m (26.18ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Underwater Inspection Date: September 2018,  Bridge Improvement Cost: $1,260,000,  Roadway Improvement Cost: $738,000,  Total Project Cost: $1,998,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 333984,  Location: AT GLENFIELD (Lat: 43.709878,  Lng: -75.399844),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Open,  Structure Length: 8.63m (28.31ft),  Average Daily Traffic: 1,104 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,546 (year 2037),  Design Load: HS 20,  Features Intersected: BLACK RIVER,  Facility Carried by Structure: GREIG ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.857,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.0m (91.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.62m (28.28ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: October 2018,  Bridge Improvement Cost: $1,617,000,  Roadway Improvement Cost: $947,000,  Total Project Cost: $2,563,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 333985,  Location: 3.3 MI NE OF GLENFIELD (Lat: 43.731131,  Lng: -75.365078),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 818 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,145 (year 2038),  Design Load: HS 20,  Features Intersected: INDEPENDENCE RIVER,  Facility Carried by Structure: PINE GROVE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.492,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 69.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 53.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.31m (7.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $767,000,  Roadway Improvement Cost: $449,000,  Total Project Cost: $1,216,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333986,  Location: 3.3 MI NE OF GLENFIELD (Lat: 43.730722,  Lng: -75.365175),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 818 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,145 (year 2038),  Design Load: HS 20,  Features Intersected: INDEPENDENCE RIVER,  Facility Carried by Structure: PINE GROVE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.443,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.5m (73.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.31m (7.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $767,000,  Roadway Improvement Cost: $449,000,  Total Project Cost: $1,216,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333988,  Location: 1.9 MI E OF GLENFIELD (Lat: 43.717519,  Lng: -75.366517),  Route carried "on" structure: County highway ,  Year Built: 2006,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 736 (year 2015),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,030 (year 2035),  Features Intersected: OTTER CREEK,  Facility Carried by Structure: PINE GROVE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.834,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $397,000,  Roadway Improvement Cost: $233,000,  Total Project Cost: $630,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333989,  Location: 2.6 MI SE OF GREIG (Lat: 43.663453,  Lng: -75.316444),  Route carried "on" structure: Other road ,  Year Built: 1973,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 109 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 153 (year 2040),  Features Intersected: FISH CREEK,  Facility Carried by Structure: FISH CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.556,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.4m (40.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 75.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $281,000,  Roadway Improvement Cost: $164,000,  Total Project Cost: $445,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Greig, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.