Bridge Statistics for Greig, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Greig, NY, New York, New York forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 10 Total length: 28 meters (92ft) Total costs: $3,112,000 Total average daily traffic: 4,322 Total average daily truck traffic: 236 Total future (year 2016) average daily traffic: 5,637 National Bridge Inventory (NBI) Registered Bridges for Greig
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 222037, Location: 1.6 MI S OF BRANTINGHAM (Lat: 43.665617, Lng: -75.292703), Route carried "on" structure: City street , Year Built: 1950, Status: Open, Structure Length: 0.82m (2.69ft), Average Daily Traffic: 62 (year 1997), Truck Traffic: 4%, Average Future Daily Traffic: 74 (year 2017), Features Intersected: FISH CREEK, Facility Carried by Structure: NORTH SOUTH ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Town or Township Highway Agency, Approaching Roadway Width: 3.6m (11.8ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.4m (21.0ft), Curb-To-Curb Width: 4.5m (14.8ft), Out-to-Out Width: 4.5m (14.8ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 72.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 42.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 0.82m (2.69ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $81,000, Roadway Improvement Cost: $48,000, Total Project Cost: $129,000 ( Estimate for 2007), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Wood or Timber Find on map >>
Structure Number: 222038, Location: 1.9 MI SE OF GREIG (Lat: 43.663756, Lng: -75.329364), Route carried "on" structure: City street , Year Built: 1973, Status: Posted for load, Structure Length: 0.67m (2.20ft), Average Daily Traffic: 75 (year 1997), Truck Traffic: 4%, Average Future Daily Traffic: 90 (year 2017), Features Intersected: FISH CREEK, Facility Carried by Structure: FISH CREEK ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 4.2m (13.8ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.0m (19.7ft), Curb-To-Curb Width: 7.0m (23.0ft), Out-to-Out Width: 7.3m (24.0ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Poor, Channel: Satisfactory, Operating Rating: 9.0 metric tons, Inventory Rating: 9.0 metric tons, Structural Evaluation: High priority of corrective action, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below), Length Of Structure Improvement: 0.67m (2.20ft), Designated Inspection Frequency: Every 12 months, Inspection Date: May 2007, Bridge Improvement Cost: $81,000, Roadway Improvement Cost: $48,000, Total Project Cost: $129,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 222039, Location: 7.4 MI NE OF BRANTINGHAM (Lat: 43.725711, Lng: -75.179036), Route carried "on" structure: City street , Year Built: 1978, Status: Posted for load, Structure Length: 0.97m (3.18ft), Average Daily Traffic: 9 (year 1997), Truck Traffic: 4%, Average Future Daily Traffic: 11 (year 2017), Features Intersected: OTTER CREEK, Facility Carried by Structure: PARTRIDGEVILLE RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 6.0m (19.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.1m (29.9ft), Curb-To-Curb Width: 7.1m (23.3ft), Out-to-Out Width: 7.4m (24.3ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Fair, Channel: Very good, Operating Rating: 13.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 7.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of corrective action, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below), Length Of Structure Improvement: 0.97m (3.18ft), Designated Inspection Frequency: Every 12 months, Inspection Date: September 2007, Bridge Improvement Cost: $157,000, Roadway Improvement Cost: $93,000, Total Project Cost: $250,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 22204, Location: 3 MILES EAST OF GLENFIELD (Lat: 43.714439, Lng: -75.343492), Route carried "on" structure: City street , Year Built: 1920, Status: Posted for load, Structure Length: 1.03m (3.38ft), Average Daily Traffic: 59 (year 1997), Truck Traffic: 4%, Average Future Daily Traffic: 71 (year 2017), Features Intersected: OTTER CREEK, Facility Carried by Structure: EATONVILLE ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Town or Township Highway Agency, Approaching Roadway Width: 3.0m (9.8ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.0m (32.8ft), Curb-To-Curb Width: 3.6m (11.8ft), Out-to-Out Width: 3.7m (12.1ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Channel: Good, Operating Rating: 18.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 10.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of corrective action, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below), Length Of Structure Improvement: 1.03m (3.38ft), Designated Inspection Frequency: Every 12 months, Inspection Date: May 2007, Bridge Improvement Cost: $84,000, Roadway Improvement Cost: $50,000, Total Project Cost: $134,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 333971, Location: 0.7 MI SW OF GREIG (Lat: 43.676900, Lng: -75.361758), Route carried "on" structure: County highway , Year Built: 1965, Year Reconstructed: 1997, Status: Open, Structure Length: 7.98m (26.18ft), Average Daily Traffic: 994 (year 1999), Truck Traffic: 6%, Average Future Daily Traffic: 1,326 (year 2019), Design Load: HS 20, Features Intersected: BLACK RIVER, Facility Carried by Structure: BURDICKS XING RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.0m (19.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 25.9m (85.0ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.3m (27.2ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Fair, Channel: Satisfactory, Operating Rating: 59.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.98m (26.18ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: September 2007, Underwater Inspection Date: July 2003, Bridge Improvement Cost: $306,000, Roadway Improvement Cost: $182,000, Total Project Cost: $488,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 333984, Location: AT GLENFIELD (Lat: 43.710100, Lng: -75.400236), Route carried "on" structure: County highway , Year Built: 1964, Year Reconstructed: 1997, Status: Open, Structure Length: 8.62m (28.28ft), Average Daily Traffic: 686 (year 2007), Truck Traffic: 4%, Average Future Daily Traffic: 823 (year 2027), Design Load: HS 20, Features Intersected: BLACK RIVER, Facility Carried by Structure: GREIG ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 28.0m (91.9ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 1.2m (3.9ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 10.2m (33.5ft) Condition: Deck: Very good, Superstructure: Good, Substructure: Very good, Channel: Good, Operating Rating: 59.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 8.62m (28.28ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: September 2007, Underwater Inspection Date: July 2003, Bridge Improvement Cost: $162,000, Roadway Improvement Cost: $96,000, Total Project Cost: $258,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 333985, Location: 3.3 MI NE OF GLENFIELD (Lat: 43.731139, Lng: -75.365092), Route carried "on" structure: County highway , Year Built: 1988, Status: Open, Structure Length: 2.31m (7.58ft), Average Daily Traffic: 659 (year 1996), Truck Traffic: 6%, Average Future Daily Traffic: 879 (year 2016), Design Load: HS 20, Features Intersected: INDEPENDENCE RIVR, Facility Carried by Structure: PINE GROVE ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 22.5m (73.8ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.1m (29.9ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Channel: Very good, Operating Rating: 97.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 58.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.31m (7.58ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $162,000, Roadway Improvement Cost: $96,000, Total Project Cost: $258,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 333986, Location: 3.3 MI NE OF GLENFIELD (Lat: 43.730633, Lng: -75.365214), Route carried "on" structure: County highway , Year Built: 1988, Status: Open, Structure Length: 2.31m (7.58ft), Average Daily Traffic: 659 (year 1996), Truck Traffic: 6%, Average Future Daily Traffic: 879 (year 2016), Design Load: HS 20, Features Intersected: INDEPENDENCE RIVR, Facility Carried by Structure: PINE GROVE ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 22.5m (73.8ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.1m (29.9ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Channel: Good, Operating Rating: 65.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.31m (7.58ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $162,000, Roadway Improvement Cost: $96,000, Total Project Cost: $258,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 333988, Location: 1.9 MI E OF GLENFIELD (Lat: 43.717419, Lng: -75.366572), Route carried "on" structure: County highway , Year Built: 2006, Status: Open, Structure Length: 2.01m (6.59ft), Average Daily Traffic: 1,057 (year 2001), Truck Traffic: 6%, Average Future Daily Traffic: 1,410 (year 2021), Features Intersected: OTTER CREEK, Facility Carried by Structure: PINE GROVE ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 19.5m (64.0ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 8.7m (28.5ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Good, Channel: Good, Operating Rating: 20.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 12.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.01m (6.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $379,000, Roadway Improvement Cost: $225,000, Total Project Cost: $604,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 333989, Location: 2.6 MI SE OF GREIG (Lat: 43.663447, Lng: -75.316417), Route carried "on" structure: City street , Year Built: 1973, Year Reconstructed: 2003, Status: Open, Structure Length: 1.28m (4.20ft), Average Daily Traffic: 62 (year 2000), Truck Traffic: 4%, Average Future Daily Traffic: 74 (year 2020), Features Intersected: FISH CREEK, Facility Carried by Structure: FISH CREEK ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 7.1m (23.3ft), Skew: 3 degrees, Material/Design: Prestressed concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.4m (40.7ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 7.7m (25.3ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Good, Channel: Good, Operating Rating: 75.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 45.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.28m (4.20ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $379,000, Roadway Improvement Cost: $225,000, Total Project Cost: $604,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Discuss this city on our hugely popular New York forum Back to: Greig, NY, New York, All US cities.
|
![]() |