National Bridge Inventory (NBI) Statistics
Number of bridges: 22
Total length: 517 meters (1,696ft)
Total costs: $143,547,000
Total average daily traffic: 147,374
Total average daily truck traffic: 7,574
National Bridge Inventory (NBI) Registered Bridges for Gulf Shores

New bridges - Historical Statistics

  • 1960-1969: 1
  • 1970-1979: 7
  • 1980-1989: 5
  • 1990-1999: 8
  • 2000-2010: 1

Reconstructed bridges - Historical Statistics

  • 1970-1979: 1
  • 1980-1989: 0
  • 1990-1999: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 10102,  Location: 1 MI W SR 59 (Lat: 30.241383,  Lng: -87.738114),  Route carried "on" structure: State highway 182,  Year Built: 1969,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 4,090 (year 2008),  Truck Traffic: 2%,  Average Future Daily Traffic: 8,960 (year 2028),  Design Load: HS 20,  Features Intersected: LITTLE LAGOON PASS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.681,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 32.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 2 months,  Underwater Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 2 months,  Inspection Date: June 2009,  Underwater Inspection Date: April 2008,  Other Special Inspection Date: Febuary 10,  Bridge Improvement Cost: $1,395,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $2,093,000 ( Estimate for 2010),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 10764,  Location: 1.8 MI N SR 182 (Lat: 30.275333,  Lng: -87.686944),  Route carried "on" structure: State highway 59,  Year Built: 1972,  Status: Open,  Structure Length: 5.33m (17.49ft),  Average Daily Traffic: 38,660 (year 2008),  Truck Traffic: 6%,  Average Future Daily Traffic: 69,820 (year 2028),  Design Load: HS 20,  Features Intersected: 22ND AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.000,  Lanes on structure: 5,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 24.7m (81.0ft),  Out-to-Out Width: 25.8m (84.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.36m (20.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2009,  Bridge Improvement Cost: $3,688,000,  Roadway Improvement Cost: $369,000,  Total Project Cost: $5,532,000 ( Estimate for 2010),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 11464,  Location: .4 MI N JCT SR 182 (Lat: 30.254694,  Lng: -87.688778),  Route carried "on" structure: State highway 59,  Year Built: 1975,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 31,380 (year 2008),  Truck Traffic: 6%,  Average Future Daily Traffic: 56,680 (year 2028),  Design Load: HS 20,  Features Intersected: LITTLE LAGOON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.705,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.4m (63.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 71.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2009,  Underwater Inspection Date: November 2009,  Bridge Improvement Cost: $2,705,000,  Roadway Improvement Cost: $271,000,  Total Project Cost: $4,058,000 ( Estimate for 2010),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 11551,  Location: 1.9 MI N SR 182 (Lat: 30.277028,  Lng: -87.686861),  Route carried "on" structure: State highway 59,  Year Built: 1972,  Year Reconstructed: 1976,  Status: Open,  Structure Length: 53.71m (176.21ft),  Average Daily Traffic: 38,660 (year 2008),  Truck Traffic: 6%,  Average Future Daily Traffic: 69,820 (year 2028),  Design Load: HS 20,  Features Intersected: INTRACOASTAL CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.188,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 20 degrees,  Navigation Control: Yes ( Vertical Clearance: 22.3m (73.2ft), Horizontal Clearance: 38.1m (125.0ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 54.9m (180.1ft),  Curb-To-Curb Width: 24.7m (81.0ft),  Out-to-Out Width: 25.8m (84.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 56.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 53.70m (176.18ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: August 2009,  Critical Feature Inspection Date: August 2009,  Underwater Inspection Date: April 2008,  Other Special Inspection Date: August 2009,  Bridge Improvement Cost: $31,151,000,  Roadway Improvement Cost: $3,115,000,  Total Project Cost: $46,726,000 ( Estimate for 2010),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 14957,  Location: 2 MI W FLA LINE (Lat: 30.276844,  Lng: -87.557900),  Route carried "on" structure: State highway 182,  Year Built: 1989,  Status: Open,  Structure Length: 79.19m (259.81ft),  Average Daily Traffic: 18,020 (year 2008),  Truck Traffic: 4%,  Average Future Daily Traffic: 39,480 (year 2028),  Design Load: HS 20,  Features Intersected: PERDIDO PASS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.847,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 20 degrees,  Navigation Control: Yes ( Vertical Clearance: 12.5m (41.0ft), Horizontal Clearance: 30.5m (100.1ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 17,  Length of Maximum Span: 73.2m (240.2ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 26.8m (87.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 79.18m (259.78ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2009,  Underwater Inspection Date: November 2008,  Bridge Improvement Cost: $47,723,000,  Roadway Improvement Cost: $4,772,000,  Total Project Cost: $71,584,000 ( Estimate for 2010),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 15042,  Location: E OF GU SH POST OFFICE (Lat: 30.273333,  Lng: -87.685000),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 378 (year 2009),  Truck Traffic: 1%,  Average Future Daily Traffic: 526 (year 2029),  Features Intersected: W 1ST ST DRAINAGE,  Facility Carried by Structure: W 21ST AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 43.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2009,  Bridge Improvement Cost: $436,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $654,000 ( Estimate for 2010)
Find on map >>

Structure Number: 15234,  Location: 0.1 MI S CLUBHOUSE DR (Lat: 30.263333,  Lng: -87.688333),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 541 (year 2009),  Truck Traffic: 1%,  Average Future Daily Traffic: 683 (year 2029),  Features Intersected: WEST 1ST ST DRAINAGE,  Facility Carried by Structure: WEST 2ND ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.526,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.1m (6.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 82.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2009,  Bridge Improvement Cost: $339,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $509,000 ( Estimate for 2010)
Find on map >>

Structure Number: 15235,  Location: 192' W OF SR 59 (Lat: 30.270000,  Lng: -87.785000),  Route carried "on" structure: City street ,  Year Built: 1990,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 946 (year 2009),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,157 (year 2029),  Features Intersected: WEST 1ST ST. DRAINAGE,  Facility Carried by Structure: CLUBHOUSE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.702,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 89.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2009,  Bridge Improvement Cost: $2,370,000,  Roadway Improvement Cost: $237,000,  Total Project Cost: $3,555,000 ( Estimate for 2010)
Find on map >>

Structure Number: 15236,  Location: 321' W OF SR 59 (Lat: 30.271667,  Lng: -87.685000),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 946 (year 2009),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,262 (year 2029),  Features Intersected: W 1ST ST DRAINAGE,  Facility Carried by Structure: W 19TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.428,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.5m (24.6ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 14.5 metric tons,  Inventory Rating: 10.9 metric tons,  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2009,  Bridge Improvement Cost: $439,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $659,000 ( Estimate for 2010)
Find on map >>

Structure Number: 15237,  Location: 0.3 MI W OF E 2ND ST (Lat: 30.275000,  Lng: -87.685000),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 1.26m (4.13ft),  Average Daily Traffic: 568 (year 2009),  Truck Traffic: 1%,  Average Future Daily Traffic: 908 (year 2029),  Features Intersected: W 1ST ST DRAINAGE,  Facility Carried by Structure: W 22ND AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.628,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.93m (6.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2009,  Bridge Improvement Cost: $603,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $904,000 ( Estimate for 2010)
Find on map >>

Structure Number: 15238,  Location: 0.3 MI W OF E 2ND ST (Lat: 30.275000,  Lng: -87.685000),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 1.26m (4.13ft),  Average Daily Traffic: 379 (year 2009),  Truck Traffic: 1%,  Average Future Daily Traffic: 670 (year 2029),  Features Intersected: W 1ST ST DRAINAGE,  Facility Carried by Structure: W CANAL AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.629,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 40.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.93m (6.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2009,  Bridge Improvement Cost: $603,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $904,000 ( Estimate for 2010)
Find on map >>

Structure Number: 15809,  Location: 0.9 MI N SR 182 (Lat: 30.256336,  Lng: -87.679006),  Route carried "on" structure: State highway 135,  Year Built: 1993,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 4,190 (year 2008),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,110 (year 2028),  Design Load: HS 20,  Features Intersected: STATE LAKE CHANNEL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.455,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.1m (36.4ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 53.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: April 2008,  Underwater Inspection Date: April 2008,  Bridge Improvement Cost: $626,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $939,000 ( Estimate for 2010),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 16843,  Location: 4.3 MI. W. OF AL. HWY. 59 (Lat: 30.283333,  Lng: -87.733333),  Route carried "on" structure: County highway 6,  Year Built: 1997,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 799 (year 2009),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,776 (year 2029),  Design Load: HS 20,  Features Intersected: OYSTER BAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.014,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 55.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 6.19m (20.31ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: March 2009,  Underwater Inspection Date: March 2009,  Bridge Improvement Cost: $1,307,000,  Roadway Improvement Cost: $131,000,  Total Project Cost: $1,961,000 ( Estimate for 2010),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 18205,  Location: 0.2 MI N SR 182 (Lat: 30.255750,  Lng: -87.654028),  Route carried "on" structure: State lands road 2,  Year Built: 1975,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 1,630 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,000 (year 2027),  Design Load: HS 20,  Features Intersected: GULF ST PARK BOAT CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.345,  Lanes on structure: 2,  Owner: State Park, Forest, or Reservation Agency,  Maintenance Responsibility: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.88m (19.29ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: May 2009,  Underwater Inspection Date: June 2009,  Bridge Improvement Cost: $1,613,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $2,419,000 ( Estimate for 2010),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 18247,  Location: 0.1 M S CLUBHOUSE DRIVE (Lat: 30.263333,  Lng: -87.688333),  Route carried "on" structure: City street ,  Year Built: 2001,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 468 (year 2009),  Truck Traffic: 1%,  Average Future Daily Traffic: 736 (year 2029),  Design Load: HS 20,  Features Intersected: CANAL,  Facility Carried by Structure: WINDMILL RIDGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 0.0m,  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 87.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2009,  Bridge Improvement Cost: $320,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $480,000 ( Estimate for 2010),  Deck Structure Type: Concrete Precast Panels
Find on map >>

Structure Number: 1834,  Location: 1 MI W 29TH AVE (Lat: 30.275556,  Lng: -87.685556),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 489 (year 2009),  Truck Traffic: 1%,  Average Future Daily Traffic: 509 (year 2029),  Design Load: HS 20,  Features Intersected: 28TH AVE DRAINAGE,  Facility Carried by Structure: 28TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 89.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2009,  Bridge Improvement Cost: $380,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $570,000 ( Estimate for 2010)
Find on map >>

Structure Number: 10764,  Location: 1.8 MI N SR 182 (Lat: 30.275333,  Lng: -87.686944),  Route carried "under" structure: City street ,  Year Built: 1972,  Structure Length: 5.33m (17.49ft),  Average Daily Traffic: 835 (year 2007),  Truck Traffic: 1%,  Features Intersected: 22ND AVE,  Facility Carried by Structure: SR 59
Minimum Vertical Clearance: 5.19m (17.03ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>

Structure Number: 11551,  Location: 1.9 MI N SR 59 (Lat: 30.277028,  Lng: -87.686861),  Route carried "under" structure: City street ,  Year Built: 1972,  Structure Length: 53.71m (176.21ft),  Average Daily Traffic: 450 (year 2007),  Truck Traffic: 1%,  Features Intersected: CITY STREET,  Facility Carried by Structure: SR 59
Minimum Vertical Clearance: 11.89m (39.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 54.9m (180.1ft)

Find on map >>

Structure Number: 11551,  Location: 1.9 MI N SR 59 (Lat: 30.277028,  Lng: -87.686861),  Route carried "under" structure: City street ,  Year Built: 1972,  Structure Length: 53.71m (176.21ft),  Average Daily Traffic: 445 (year 2007),  Truck Traffic: 1%,  Features Intersected: CITY STREET,  Facility Carried by Structure: SR 59
Minimum Vertical Clearance: 11.89m (39.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 54.9m (180.1ft)

Find on map >>

Structure Number: 14957,  Location: 2 MI W FLA LINE (Lat: 30.276844,  Lng: -87.557900),  Route carried "under" structure: Other road ,  Year Built: 1989,  Structure Length: 79.19m (259.81ft),  Average Daily Traffic: 500 (year 2007),  Truck Traffic: 1%,  Features Intersected: PERDIDO PASS,  Facility Carried by Structure: SR 182
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 73.2m (240.2ft)

Find on map >>

Structure Number: 14957,  Location: 2 MI W FLA LINE (Lat: 30.276844,  Lng: -87.557900),  Route carried "under" structure: Other road ,  Year Built: 1989,  Structure Length: 79.19m (259.81ft),  Average Daily Traffic: 2,700 (year 2007),  Truck Traffic: 4%,  Features Intersected: PERDIDO PASS,  Facility Carried by Structure: SR 182
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 73.2m (240.2ft)

Find on map >>

Structure Number: 14957,  Location: 2 MI W FLA LINE (Lat: 30.276844,  Lng: -87.557900),  Route carried "under" structure: Other road ,  Year Built: 1989,  Structure Length: 79.19m (259.81ft),  Average Daily Traffic: 300 (year 2007),  Features Intersected: PERDIDO PASS,  Facility Carried by Structure: SR 182
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 73.2m (240.2ft)

Jump to a detailed profile or search site with Google Custom Search
Business Search - 14 Million verified businesses
Search for: near: 

Discuss this city on our hugely popular Alabama forum