Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Hackleburg, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 518ft / 158mTotal length
  • $52,772,000Total costs
  • 21,784Total average daily traffic
  • 1,790Total average daily truck traffic
  • 28,970Total future (year 2030) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hackleburg
  • No street view available for this location

New bridges in Hackleburg, AL - historical statistics
  • New bridges - historical statistics
  • 21900-1909
  • 21930-1939
  • 41950-1959
  • 11960-1969
  • 11970-1979
  • 21980-1989
  • 31990-1999
  • 22000-2009
  • 22010-2019
Reconstructed bridges in Hackleburg, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 11970-1979
  • 01980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Hackleburg, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Excellent
  • 20.0%Very good
  • 40.0%Good
  • 10.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 30.0%Very good
  • 20.0%Good
  • 30.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 30.0%Very good
  • 20.0%Good
  • 30.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 35.3%Very good
  • 35.3%Good
  • 23.5%Satisfactory
  • 5.9%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 44.4%Good
  • 33.3%Satisfactory
  • 22.2%Fair
Find on map >>   Show street view

Structure Number: 1306,  Location: 500 FT WEST OF I65 (Lat: 32.377592,  Lng: -86.323797),  Route carried "on" structure: City street ,  Year Built: 1935,  Status: Open,  Structure Length: 8.23m (27.00ft),  Average Daily Traffic: 6,980 (year 1990),  Truck Traffic: 3%,  Average Future Daily Traffic: 10,100 (year 2038),  Design Load: H 20,  Features Intersected: SCLLN RR,  Facility Carried by Structure: Maxwell Blvd.
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 3.499,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.7m (94.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 18.7m (61.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 68.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.23m (30.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $3,860,000,  Roadway Improvement Cost: $386,000,  Total Project Cost: $4,246,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 4477,  Location: 4 MI N JCT US 278 (Lat: 34.170361,  Lng: -87.827917),  Route carried "on" structure: State highway 253,  Year Built: 1952,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 210 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 293 (year 2041),  Design Load: H 15,  Features Intersected: Little Camp Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.675,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $360,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $396,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 5145,  Location: .8 MI SW US 43 CO 8 JCT (Lat: 34.327722,  Lng: -87.781556),  Route carried "on" structure: County highway 8,  Year Built: 1955,  Status: Posted for load,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 140 (year 1986),  Truck Traffic: 5%,  Average Future Daily Traffic: 281 (year 2031),  Features Intersected: DISMAL BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 15.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 10.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.11m (6.92ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $303,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $333,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5498,  Location: 3 MI SOUTH OF US 80 (Lat: 32.234725,  Lng: -86.746922),  Route carried "on" structure: County highway 17,  Year Built: 1956,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 415 (year 2003),  Truck Traffic: 5%,  Average Future Daily Traffic: 480 (year 2030),  Design Load: H 15,  Features Intersected: BUCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 64.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $225,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $248,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 5499,  Location: 2 MI SOUTH OF US 80 (Lat: 32.248864,  Lng: -86.752417),  Route carried "on" structure: County highway 17,  Year Built: 1956,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 415 (year 2003),  Truck Traffic: 5%,  Average Future Daily Traffic: 480 (year 2030),  Design Load: H 15,  Features Intersected: BUCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 57.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $233,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $256,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7346,  Location: 6.4 MILE NW OF ELBA (Lat: 31.477836,  Lng: -86.142147),  Route carried "on" structure: County highway 353,  Year Built: 1961,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 250 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 350 (year 2040),  Design Load: H 10,  Features Intersected: BEAVERDAM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.54m (8.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $470,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $517,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7832,  Location: 6 MILES SW OF HACKLEBURG (Lat: 34.265778,  Lng: -87.924222),  Route carried "on" structure: County highway 32,  Year Built: 1900,  Year Reconstructed: 1963,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 105 (year 2001),  Truck Traffic: 10%,  Average Future Daily Traffic: 162 (year 2036),  Design Load: H 15,  Features Intersected: NORTH FORK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $717,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $789,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10363,  Location: 0.4 MI N MARION CO LINE (Lat: 34.316797,  Lng: -87.858333),  Route carried "on" structure: County highway 57,  Year Built: 1970,  Status: Open,  Structure Length: 11.58m (37.99ft),  Average Daily Traffic: 110 (year 1986),  Truck Traffic: 4%,  Average Future Daily Traffic: 282 (year 2031),  Design Load: HS 20,  Features Intersected: BEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 80.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.45m (40.85ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,646,000,  Roadway Improvement Cost: $265,000,  Total Project Cost: $2,911,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12449,  Location: 1 MILE NORTH JCT CO 41 (Lat: 34.247028,  Lng: -87.913833),  Route carried "on" structure: County highway ,  Year Built: 1900,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 60 (year 2001),  Average Future Daily Traffic: 101 (year 2036),  Design Load: H 20,  Features Intersected: NORTH FORK CREEK,  Facility Carried by Structure: CR 167
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $306,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $337,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1315,  Location: 2.8 MILES SOUTH JCTCO 12 (Lat: 34.210222,  Lng: -87.788306),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 25 (year 2001),  Average Future Daily Traffic: 59 (year 2035),  Design Load: H 20,  Features Intersected: Barn Creek,  Facility Carried by Structure: Grady Cole Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $313,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $344,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13438,  Location: 1.5MILES SOUTH JCT.172 (Lat: 34.252683,  Lng: -87.789944),  Route carried "on" structure: County highway 12,  Year Built: 1985,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 115 (year 2001),  Truck Traffic: 5%,  Average Future Daily Traffic: 318 (year 2035),  Design Load: HS 20,  Features Intersected: Old RR Bed
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.73m (18.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,179,000,  Roadway Improvement Cost: $118,000,  Total Project Cost: $1,297,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15363,  Location: 2 MILES WEST JCT 241 (Lat: 34.263583,  Lng: -87.764194),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 125 (year 2005),  Truck Traffic: 10%,  Average Future Daily Traffic: 226 (year 2035),  Design Load: HS 20,  Features Intersected: BUSH CREEK,  Facility Carried by Structure: GRAVEL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $477,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $525,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15482,  Location: 5 MI N JCT AL-118 (Lat: 34.174750,  Lng: -87.838611),  Route carried "on" structure: State highway 253,  Year Built: 1991,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 222 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 293 (year 2041),  Design Load: HS 20,  Features Intersected: Camp Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.821,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 51.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.54m (8.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $646,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $711,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15976,  Location: 4 MI E JCT US-43 (Lat: 34.283444,  Lng: -87.774250),  Route carried "on" structure: State highway 172,  Year Built: 1994,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,200 (year 2040),  Design Load: HS 20,  Features Intersected: Bear Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.681,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 66.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.11m (33.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $2,910,000,  Roadway Improvement Cost: $291,000,  Total Project Cost: $3,201,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17206,  Location: 0.5 MI. E. OF AL HWY 172 (Lat: 34.300889,  Lng: -87.887917),  Route carried "on" structure: County highway 116,  Year Built: 1935,  Status: Posted for load,  Structure Length: 1.00m (3.28ft),  Average Daily Traffic: 50 (year 2001),  Average Future Daily Traffic: 66 (year 2035),  Features Intersected: ROBINSON BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.6m (21.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 15.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $264,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $290,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18528,  Location: N of Hackleburg (Lat: 34.295411,  Lng: -87.803764),  Route carried "on" structure: US ?????,  Year Built: 2007,  Status: Open,  Structure Length: 41.15m (135.01ft),  Average Daily Traffic: 4,021 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 5,000 (year 2041),  Design Load: HS 20,  Features Intersected: Bear Creek,  Facility Carried by Structure: AL-17
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 472.315,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 87.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 41.15m (135.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $12,132,000,  Roadway Improvement Cost: $1,213,000,  Total Project Cost: $13,345,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1854,  Location: N of Hackleburg (Lat: 34.294928,  Lng: -87.804461),  Route carried "on" structure: US 43,  Year Built: 2007,  Status: Open,  Structure Length: 41.15m (135.01ft),  Average Daily Traffic: 4,021 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 5,000 (year 2041),  Design Load: HS 20,  Features Intersected: Bear Creek,  Facility Carried by Structure: AL-17
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 472.315,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 87.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 41.15m (135.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $11,850,000,  Roadway Improvement Cost: $1,185,000,  Total Project Cost: $13,035,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20594,  Location: 4 MI N JCT AL-187 (Lat: 34.236917,  Lng: -87.896969),  Route carried "on" structure: US 43,  Year Built: 2019,  Status: Open,  Structure Length: 28.80m (94.49ft),  Average Daily Traffic: 3,350 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 4,000 (year 2040),  Design Load: HS 20,  Features Intersected: North Fork Creek,  Facility Carried by Structure: AL-17
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 461.333,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 205.7m (674.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 36.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 28.80m (94.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $8,690,000,  Roadway Improvement Cost: $869,000,  Total Project Cost: $9,559,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20868,  Location: 0.7 MI W. CO.8 JCT. (Lat: 34.346975,  Lng: -87.806403),  Route carried "on" structure: County highway 14,  Year Built: 2013,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 170 (year 2011),  Truck Traffic: 2%,  Average Future Daily Traffic: 279 (year 2036),  Features Intersected: EDGAR BRANCH MILL POND,  Facility Carried by Structure: NIX MILL POND RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.4m (24.3ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 41.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $393,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $432,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Discuss Hackleburg, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.