Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Hamburg, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 164ft / 50.5mTotal length
  • $46,200,000Total costs
  • 154,790Total average daily traffic
  • 2,836Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hamburg
  • No street view available for this location

New bridges in Hamburg, NY - historical statistics
  • New bridges - historical statistics
  • 31920-1929
  • 11930-1939
  • 11940-1949
  • 61950-1959
  • 21980-1989
  • 22000-2009
  • 12010-2019
Reconstructed bridges in Hamburg, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 11990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Hamburg, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Very good
  • 20.0%Good
  • 20.0%Satisfactory
  • 10.0%Fair
  • 30.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.0%Very good
  • 20.0%Good
  • 40.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.0%Very good
  • 20.0%Good
  • 30.0%Satisfactory
  • 30.0%Fair
  • 10.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.3%Very good
  • 57.1%Good
  • 14.3%Satisfactory
  • 14.3%Fair
Find on map >>   Show street view

Structure Number: 102821,  Location: 1.2 MILES SW OF HAMBURG (Lat: 42.706553,  Lng: -78.849097),  Route carried "on" structure: US 62,  Year Built: 1983,  Status: Open,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 10,772 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 10,822 (year 2040),  Design Load: HS 20,  Features Intersected: EIGHTEEN MILE CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.265,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.6m (129.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 15.6m (51.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 53.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.02m (13.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $3,733,000,  Roadway Improvement Cost: $2,186,000,  Total Project Cost: $5,918,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102991,  Location: JCT RT 75 + I-90 (Lat: 42.740425,  Lng: -78.846411),  Route carried "on" structure: State highway 75,  Year Built: 1957,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 7.89m (25.89ft),  Average Daily Traffic: 21,241 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 21,340 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: 90IX WB, RTE I90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.268,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 21.3m (69.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 18.6m (61.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 17.4m (57.1ft),  Out-to-Out Width: 21.0m (68.9ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Poor,  Operating Rating: 80.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.89m (25.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $6,378,000,  Roadway Improvement Cost: $3,735,000,  Total Project Cost: $10,113,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 104166,  Location: 1.8 MI N JCT SH391 &SH219 (Lat: 42.713403,  Lng: -78.808853),  Route carried "on" structure: State highway 391,  Year Built: 1923,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 5,835 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,161 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: NEUMAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.103,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $843,000,  Roadway Improvement Cost: $494,000,  Total Project Cost: $1,337,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 221324,  Location: 1.5 MI.W OF HAMBURG (Lat: 42.711633,  Lng: -78.869528),  Route carried "on" structure: Other road ,  Year Built: 1925,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 5.67m (18.60ft),  Average Daily Traffic: 344 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 482 (year 2037),  Design Load: HS 20,  Features Intersected: EIGHTEEN MILE CRK,  Facility Carried by Structure: SOUTH CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.1m (111.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 47.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 5.66m (18.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,570,000,  Roadway Improvement Cost: $919,000,  Total Project Cost: $2,489,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 332737,  Location: 1.75 MI EAST OF HAMBURG (Lat: 42.722475,  Lng: -78.793328),  Route carried "on" structure: County highway ,  Year Built: 2013,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 1,595 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,973 (year 2040),  Design Load: HL 93,  Features Intersected: NEUMAN CREEK,  Facility Carried by Structure: ABBOTT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.004,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 94.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 73.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $752,000,  Roadway Improvement Cost: $440,000,  Total Project Cost: $1,193,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 332747,  Location: 2.1 MILES EAST OF HAMBURG (Lat: 42.720342,  Lng: -78.798908),  Route carried "on" structure: County highway ,  Year Built: 1920,  Status: Posted for load-capacity,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,895 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,344 (year 2040),  Features Intersected: NEUMAN CREEK,  Facility Carried by Structure: NEWTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.883,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $560,000,  Roadway Improvement Cost: $328,000,  Total Project Cost: $887,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332758,  Location: 1.9 MI SOUTH OF HAMBURG (Lat: 42.691172,  Lng: -78.833642),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,381 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,708 (year 2040),  Design Load: HS 20,  Features Intersected: HAMPTON BROOK,  Facility Carried by Structure: EAST EDEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.289,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 76.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $314,000,  Roadway Improvement Cost: $184,000,  Total Project Cost: $498,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332759,  Location: HAMBURG SOUTH (Lat: 42.713033,  Lng: -78.829656),  Route carried "on" structure: County highway ,  Year Built: 1931,  Year Reconstructed: 2019,  Status: Posted for load-capacity,  Structure Length: 4.54m (14.90ft),  Average Daily Traffic: 2,899 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,586 (year 2040),  Features Intersected: EIGHTEEN MILE CRK,  Facility Carried by Structure: EAST EDEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.702,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 4.54m (14.90ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Bridge Improvement Cost: $3,308,000,  Roadway Improvement Cost: $1,937,000,  Total Project Cost: $5,244,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 551245,  Location: 1.5 MI SW EXIT 57 OF I90 (Lat: 42.733144,  Lng: -78.863483),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Open,  Structure Length: 6.89m (22.60ft),  Average Daily Traffic: 5,100 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,310 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: 90IX, RTE I90,  Facility Carried by Structure: CR 122 PLEASANT AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.1m (111.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 80.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 61.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.88m (22.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $3,805,000,  Roadway Improvement Cost: $2,228,000,  Total Project Cost: $6,033,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 551246,  Location: EXIT 57 OF I90 (Lat: 42.744092,  Lng: -78.839550),  Route carried "on" structure: Ramp Interstate ,  Year Built: 1955,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 914 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,024 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: 90IX, RTE I90,  Facility Carried by Structure: 90IX EXIT 57 RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.885,  Lanes on structure: 2,  Lanes under structure: 10,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.07m (26.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $3,714,000,  Roadway Improvement Cost: $2,175,000,  Total Project Cost: $5,889,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 551247,  Location: 0.6 MI NE OF INT 57 (Lat: 42.751689,  Lng: -78.832800),  Route carried "on" structure: County highway ,  Year Built: 1955,  Status: Open,  Structure Length: 9.02m (29.59ft),  Average Daily Traffic: 6,057 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 7,494 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: 90 IX, RTE I90,  Facility Carried by Structure: SOWLES RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.866,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.02m (29.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $4,162,000,  Roadway Improvement Cost: $2,437,000,  Total Project Cost: $6,599,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 102991,  Location: JCT RT 75 + I-90 (Lat: 42.740425,  Lng: -78.846411),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 20,300 (year 1973),  Features Intersected: 90IX WB, RTE I90,  Facility Carried by Structure: RTE 75
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 702.570,  Lanes on structure: 4,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>   Show street view

Structure Number: 551245,  Location: 1.5 MI SW EXIT 57 OF I90 (Lat: 42.733144,  Lng: -78.863483),  Route carried "under" structure: Interstate 90,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 14,600 (year 1977),  Features Intersected: 90IX, RTE I90,  Facility Carried by Structure: CR 122 PLEASANT AV
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 704.195,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 551246,  Location: EXIT 57 OF I90 (Lat: 42.744092,  Lng: -78.839550),  Route carried "under" structure: Interstate 90,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 16,931 (year 2000),  Features Intersected: 90IX, RTE I90
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 701.878,  Lanes on structure: 2,  Lanes under structure: 5,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 551247,  Location: 0.6 MI NE OF INT 57 (Lat: 42.751689,  Lng: -78.832800),  Route carried "under" structure: Interstate 90,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 19,800 (year 1977),  Features Intersected: 90 IX, RTE I90,  Facility Carried by Structure: SOWLES RD
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 700.880,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 70299,  Location: 0.9 MI SE JCT RT 75 + I90 (Lat: 42.731836,  Lng: -78.835514),  Route carried "under" structure: State highway 75,  Year Built: 1941,  Structure Length: 0. m,  Average Daily Traffic: 25,126 (year 1999),  Features Intersected: RTE 75,  Facility Carried by Structure: BUFFALO SOUTHERN
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 27.997,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 24.0m (78.7ft)

Discuss Hamburg, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.